X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201102020

Well Details

Well ID: 0625201102020
Loading map...
Location: 02/02-11-062-20W5/0
Location Alias: 02/02-11-62-20 W5M
Location Alias 2: 02/02-11-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 11-14B 102 KAYBOBS 2-11-62-20
Operator Name: Murphy Oil Company Ltd.
License Number: 0486012
License Date: 2017-10-25
License Status: Issued
Spud Date: 2017-12-08
Final Drill Date: 2018-01-28
Well Total Depth: 5750.00 m
Surface Hole Latitude: 54.364560
Surface Hole Longitude: -116.889385

For data sources see[1][2]

Well History

Date Event
2017-10-25 Obtained License
2017-12-09 Surface Casing Operation Performed
2018-01-02 Direction Drilling Operation Performed - Deviate
2018-01-05 Intermediate Casing Operation Performed
2018-01-26 Direction Drilling Operation Performed - Horizontal
2018-01-28 Finished Drilling
2018-01-28 Well Log Performed
2018-01-28 Well Mode changed to Drilled and Cased
2018-01-29 Production Casing Operation Performed
2018-01-31 Rig Released
2018-04-17 Perforation Treatment Performed - Jet Perforation
2018-04-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-05 Perforation Treatment Performed - Jet Perforation
2018-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-06 Perforation Treatment Performed - Jet Perforation
2018-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-07 Perforation Treatment Performed - Jet Perforation
2018-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-08 Perforation Treatment Performed - Jet Perforation
2018-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-09 Perforation Treatment Performed - Jet Perforation
2018-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-10 Perforation Treatment Performed - Jet Perforation
2018-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-11 Perforation Treatment Performed - Jet Perforation
2018-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-12 Perforation Treatment Performed - Jet Perforation
2018-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-13 Perforation Treatment Performed - Jet Perforation
2018-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-14 Perforation Treatment Performed - Jet Perforation
2018-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-15 Perforation Treatment Performed - Jet Perforation
2018-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-16 Perforation Treatment Performed - Jet Perforation
2018-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-28 Well Began Production
2018-08-28 Well Fluid changed to Gas
2018-08-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-08 Precision Drilling Corporation 547 N/A Set Surface
2018-01-23 Precision Drilling Corporation 547 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-02 685.80 Deviate (5 - 79 degrees)
2018-01-26 3309.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-17 Perforation 5612.50 5613.00 3
2018-05-05 Perforation 5525.00 5525.50 3
2018-05-11 Perforation 4525.00 4525.50 3
2018-05-11 Perforation 4537.50 4538.00 3
2018-05-11 Perforation 4550.00 4550.50 3
2018-05-11 Perforation 4562.50 4563.00 3
2018-05-11 Perforation 4575.00 4575.50 3
2018-05-11 Perforation 4587.50 4588.00 3
2018-05-11 Perforation 4600.00 4600.50 3
2018-05-11 Multi-Stage Fracture 4512.50 4600.50 0
2018-05-12 Perforation 4412.50 4413.00 2
2018-05-12 Perforation 4425.00 4425.50 2
2018-05-05 Perforation 5537.50 5538.00 3
2018-05-12 Perforation 4437.50 4438.00 2
2018-05-12 Perforation 4450.00 4450.50 2
2018-05-12 Perforation 4462.50 4463.00 3
2018-05-12 Perforation 4475.00 4475.50 3
2018-05-12 Perforation 4487.50 4488.00 3
2018-05-12 Perforation 4500.00 4500.50 3
2018-05-12 Multi-Stage Fracture 4412.50 4500.50 0
2018-05-12 Perforation 4312.50 4313.00 2
2018-05-12 Perforation 4325.00 4325.50 2
2018-05-12 Perforation 4337.50 4338.00 2
2018-05-05 Perforation 5550.00 5550.50 3
2018-05-12 Perforation 4350.00 4350.50 2
2018-05-12 Perforation 4362.50 4363.00 3
2018-05-12 Perforation 4375.00 4375.50 3
2018-05-12 Perforation 4387.50 4388.00 3
2018-05-12 Perforation 4400.00 4400.50 3
2018-05-12 Multi-Stage Fracture 4312.50 4400.50 0
2018-05-13 Perforation 4212.50 4213.00 2
2018-05-13 Perforation 4225.00 4225.50 2
2018-05-13 Perforation 4237.50 4238.00 2
2018-05-13 Perforation 4250.00 4250.50 2
2018-05-05 Perforation 5562.50 5563.00 3
2018-05-13 Perforation 4262.50 4263.00 3
2018-05-13 Perforation 4275.00 4275.50 3
2018-05-13 Perforation 4287.50 4288.00 3
2018-05-13 Perforation 4300.00 4300.50 3
2018-05-13 Multi-Stage Fracture 4212.50 4300.50 0
2018-05-14 Perforation 4112.50 4113.00 2
2018-05-14 Perforation 4125.00 4125.50 2
2018-05-14 Perforation 4137.50 4138.00 2
2018-05-14 Perforation 4150.00 4150.50 2
2018-05-14 Perforation 4162.50 4163.00 3
2018-05-05 Perforation 5575.00 5575.50 3
2018-05-14 Perforation 4175.00 4175.50 3
2018-05-14 Perforation 4187.50 4188.00 3
2018-05-14 Perforation 4200.00 4200.50 3
2018-05-14 Multi-Stage Fracture 4112.50 4200.50 0
2018-05-14 Perforation 4012.50 4013.00 2
2018-05-14 Perforation 4025.00 4025.50 2
2018-05-14 Perforation 4037.50 4038.00 2
2018-05-14 Perforation 4050.00 4050.50 2
2018-05-14 Perforation 4062.50 4063.00 3
2018-05-14 Perforation 4075.00 4075.50 3
2018-05-05 Perforation 5587.50 5588.00 3
2018-05-14 Perforation 4087.50 4088.00 3
2018-05-14 Perforation 4100.00 4100.50 3
2018-05-14 Multi-Stage Fracture 4012.50 4100.50 0
2018-05-15 Perforation 3912.50 3913.00 2
2018-05-15 Perforation 3925.00 3925.50 2
2018-05-15 Perforation 3937.50 3938.00 2
2018-05-15 Perforation 3950.00 3950.50 2
2018-05-15 Perforation 3962.50 3963.00 3
2018-05-15 Perforation 3975.00 3975.50 3
2018-05-15 Perforation 3987.50 3988.00 3
2018-05-05 Perforation 5600.00 5600.50 3
2018-05-15 Perforation 4000.00 4000.50 3
2018-05-15 Multi-Stage Fracture 3912.50 4000.50 0
2018-05-15 Perforation 3812.50 3813.00 2
2018-05-15 Perforation 3825.00 3825.50 2
2018-05-15 Perforation 3837.50 3838.00 2
2018-05-15 Perforation 3850.00 3850.50 2
2018-05-15 Perforation 3862.50 3863.00 3
2018-05-15 Perforation 3875.00 3875.50 3
2018-05-15 Perforation 3887.50 3888.00 3
2018-05-15 Perforation 3900.00 3900.50 3
2018-05-05 Multi-Stage Fracture 5512.50 5600.50 0
2018-05-15 Multi-Stage Fracture 3812.50 3900.50 0
2018-05-15 Perforation 3712.50 3713.00 2
2018-05-15 Perforation 3725.00 3725.50 2
2018-05-15 Perforation 3737.50 3738.00 2
2018-05-15 Perforation 3750.00 3750.50 2
2018-05-15 Perforation 3762.50 3763.00 3
2018-05-15 Perforation 3775.00 3775.50 3
2018-05-15 Perforation 3787.50 3788.00 3
2018-05-15 Perforation 3800.00 3800.50 3
2018-05-15 Multi-Stage Fracture 3712.50 3800.50 0
2018-05-05 Perforation 5412.50 5413.00 3
2018-05-15 Perforation 3612.50 3613.00 2
2018-05-15 Perforation 3625.00 3625.50 2
2018-05-15 Perforation 3637.50 3638.00 2
2018-05-15 Perforation 3650.00 3650.50 2
2018-05-15 Perforation 3662.50 3663.00 3
2018-05-15 Perforation 3675.00 3675.50 3
2018-05-15 Perforation 3687.50 3688.00 3
2018-05-15 Perforation 3700.00 3700.50 3
2018-05-15 Multi-Stage Fracture 3612.50 3700.50 0
2018-05-16 Perforation 3512.50 3513.00 2
2018-05-05 Perforation 5425.00 5425.50 3
2018-05-16 Perforation 3525.00 3525.50 2
2018-05-16 Perforation 3537.50 3538.00 2
2018-05-16 Perforation 3550.00 3550.50 2
2018-05-16 Perforation 3562.50 3563.00 3
2018-05-16 Perforation 3575.00 3575.50 3
2018-05-16 Perforation 3587.50 3588.00 3
2018-05-16 Perforation 3600.00 3600.50 3
2018-05-16 Multi-Stage Fracture 3512.50 3600.50 0
2018-05-16 Perforation 3412.50 3413.00 2
2018-05-16 Perforation 3425.00 3425.50 2
2018-04-17 Perforation 5625.00 5625.50 3
2018-05-05 Perforation 5437.50 5438.00 3
2018-05-16 Perforation 3437.50 3438.00 2
2018-05-16 Perforation 3450.00 3450.50 2
2018-05-16 Perforation 3462.50 3463.00 3
2018-05-16 Perforation 3475.00 3475.50 3
2018-05-16 Perforation 3487.50 3488.00 3
2018-05-16 Perforation 3500.00 3500.50 3
2018-05-16 Multi-Stage Fracture 3412.50 3500.50 0
2018-05-05 Perforation 5450.00 5450.50 3
2018-05-05 Perforation 5462.50 5463.00 3
2018-05-05 Perforation 5475.00 5475.50 3
2018-05-05 Perforation 5487.50 5488.00 3
2018-05-05 Perforation 5500.00 5500.50 3
2018-05-05 Multi-Stage Fracture 5412.50 5500.50 0
2018-05-06 Perforation 5312.50 5313.00 3
2018-05-06 Perforation 5325.00 5325.50 3
2018-05-06 Perforation 5337.50 5338.00 3
2018-04-17 Perforation 5637.50 5638.00 3
2018-05-06 Perforation 5350.00 5350.50 3
2018-05-06 Perforation 5362.50 5363.00 3
2018-05-06 Perforation 5375.00 5375.50 3
2018-05-06 Perforation 5387.50 5388.00 3
2018-05-06 Perforation 5400.00 5400.50 3
2018-05-06 Multi-Stage Fracture 5312.50 5400.50 0
2018-05-07 Perforation 5212.50 5213.00 3
2018-05-07 Perforation 5225.00 5225.50 3
2018-05-07 Perforation 5237.50 5238.00 3
2018-05-07 Perforation 5250.00 5250.50 3
2018-04-17 Perforation 5650.00 5650.50 3
2018-05-07 Perforation 5262.50 5263.00 3
2018-05-07 Perforation 5275.00 5275.50 3
2018-05-07 Perforation 5287.50 5288.00 3
2018-05-07 Perforation 5300.00 5300.50 3
2018-05-07 Multi-Stage Fracture 5212.50 5300.50 0
2018-05-07 Perforation 5112.50 5113.00 3
2018-05-07 Perforation 5125.00 5125.50 3
2018-05-07 Perforation 5137.50 5138.00 3
2018-05-07 Perforation 5150.00 5150.50 3
2018-05-07 Perforation 5162.50 5163.00 3
2018-04-17 Perforation 5662.50 5663.00 3
2018-05-07 Perforation 5175.00 5175.50 3
2018-05-07 Perforation 5187.50 5188.00 3
2018-05-07 Perforation 5200.00 5200.50 3
2018-05-07 Multi-Stage Fracture 5112.50 5200.50 0
2018-05-08 Perforation 5012.50 5013.00 3
2018-05-08 Perforation 5025.00 5025.50 3
2018-05-08 Perforation 5037.50 5038.00 3
2018-05-08 Perforation 5050.00 5050.50 3
2018-05-08 Perforation 5062.50 5063.00 3
2018-05-08 Perforation 5075.00 5075.50 3
2018-04-17 Perforation 5675.00 5675.50 3
2018-05-08 Perforation 5087.50 5088.00 3
2018-05-08 Perforation 5100.00 5100.50 3
2018-05-08 Multi-Stage Fracture 5012.50 5100.50 0
2018-05-09 Perforation 4912.50 4913.00 3
2018-05-09 Perforation 4925.00 4925.50 3
2018-05-09 Perforation 4937.50 4938.00 3
2018-05-09 Perforation 4950.00 4950.50 3
2018-05-09 Perforation 4962.50 4963.00 3
2018-05-09 Perforation 4975.00 4975.50 3
2018-05-09 Perforation 4987.50 4988.00 3
2018-04-17 Perforation 5687.50 5688.00 3
2018-05-09 Perforation 5000.00 5000.50 3
2018-05-09 Multi-Stage Fracture 4912.50 5000.50 0
2018-05-09 Perforation 4812.50 4813.00 3
2018-05-09 Perforation 4825.00 4825.50 3
2018-05-09 Perforation 4837.50 4838.00 3
2018-05-09 Perforation 4850.00 4850.50 3
2018-05-09 Perforation 4862.50 4863.00 3
2018-05-09 Perforation 4875.00 4875.50 3
2018-05-09 Perforation 4887.50 4888.00 3
2018-05-09 Perforation 4900.00 4900.50 3
2018-04-17 Multi-Stage Fracture 5612.50 5717.10 0
2018-05-09 Multi-Stage Fracture 4812.50 4900.50 0
2018-05-10 Perforation 4712.50 4713.00 3
2018-05-10 Perforation 4725.00 4725.50 3
2018-05-10 Perforation 4737.50 4738.00 3
2018-05-10 Perforation 4750.00 4750.50 3
2018-05-10 Perforation 4762.50 4763.00 3
2018-05-10 Perforation 4775.00 4775.50 3
2018-05-10 Perforation 4787.50 4788.00 3
2018-05-10 Perforation 4800.00 4800.50 3
2018-05-10 Multi-Stage Fracture 4712.50 4800.50 0
2018-05-05 Perforation 5512.50 5513.00 3
2018-05-11 Perforation 4612.50 4613.00 3
2018-05-11 Perforation 4625.00 4625.50 3
2018-05-11 Perforation 4637.50 4638.00 3
2018-05-11 Perforation 4650.00 4650.50 3
2018-05-11 Perforation 4662.50 4663.00 3
2018-05-11 Perforation 4675.00 4675.50 3
2018-05-11 Perforation 4687.50 4688.00 3
2018-05-11 Perforation 4700.00 4700.50 3
2018-05-11 Multi-Stage Fracture 4612.50 4700.50 0
2018-05-11 Perforation 4512.50 4513.00 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-17 2018-05-16 3,184 41,857 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 91.6403 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.8027 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.8085 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.3225 N/A
Water 7732-18-5 100 0.3225 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0072 N/A
Dibromoacetonitrile 3252-43-5 100 0.0072 N/A
Polyethylene Glycol 25322-68-3 100 0.0072 N/A
Sodium Bromide 7647-15-6 100 0.0072 N/A
Water 7732-18-5 100 0.0072 N/A
Breaker HP BJ Services Breaker Ethylene glycol 107-21-1 100 0.0102 N/A
Non-hazardous Not Available 100 0.0102 N/A
tert-Butyl hydroperoxide 75-91-2 100 0.0102 N/A
Water 7732-18-5 100 0.0102 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0271 N/A
Potassium hydroxide 1310-58-3 100 0.0271 N/A
Water 7732-18-5 100 0.0271 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.1015 N/A
Non-hazardous Not Available 100 0.1015 N/A
Water 7732-18-5 100 0.1015 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0025 N/A
Methanol 67-56-1 100 0.0025 N/A
Modified thiourea polymer 68527-49-1 100 0.0025 N/A
Olefin 64743-02-8 100 0.0025 N/A
Polyoxyalkylenes 68951-67-7 100 0.0025 N/A
Propargyl alcohol 107-19-7 100 0.0025 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0236 N/A
Ethylene glycol 107-21-1 100 0.0236 N/A
Inorganic Borates 1319-33-1 100 0.0236 N/A
Polysaccharide 11138-66-2 100 0.0236 N/A
Water 7732-18-5 100 0.0236 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0006 N/A
Isopropanol 67-63-0 100 0.0006 N/A
Methanol 67-56-1 100 0.0006 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0926 N/A
Oxyalkylated alcohol 9014 100 0.0926 N/A
Petroleum distillates 64742-47-8 100 0.0926 N/A
Polyacrylate 9014 100 0.0926 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0247 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0028 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0109 N/A
Water 7732-18-5 100 0.0109 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-27 2018-05-20 Surface Water - Lake 39497

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3137 0.0 0.0 0.0
2019 8568 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-31 No Incident Encountered 0.00 0.00
2018-06-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References