X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625193015020

Well Details

Well ID: 0625193015020
Loading map...
Location: 02/15-30-062-19W5/0
Location Alias: 02/15-30-62-19 W5M
Location Alias 2: 02/15-30-062-19 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 102 HZ FOXCK 15-30-62-19
Operator Name: Chevron Canada Limited
License Number: 0493390
License Date: 2019-01-10
License Status: Amended
Spud Date: 2019-06-14
Final Drill Date: 2019-08-11
Well Total Depth: 5407.00 m
Surface Hole Latitude: 54.377823
Surface Hole Longitude: -116.825819

For data sources see[1][2]

Well History

Date Event
2019-01-10 Obtained License
2019-06-14 Direction Drilling Operation Performed - Deviate
2019-06-14 Set Surface
2019-06-15 Surface Casing Operation Performed
2019-06-16 Resumption
2019-06-18 Lost Circulation Occurred
2019-06-20 Lost Circulation Occurred
2019-06-21 Intermediate Casing Operation Performed
2019-06-21 Lost Circulation Occurred
2019-06-22 Lost Circulation Occurred
2019-07-06 Well Log Performed
2019-08-01 Drill To LD
2019-08-05 Direction Drilling Operation Performed - Horizontal
2019-08-09 Lost Circulation Occurred
2019-08-11 Finished Drilling
2019-08-11 Well Log Performed
2019-08-11 Well Mode changed to Drilled and Cased
2019-08-13 Well Log Performed
2019-08-14 Lost Circulation Occurred
2019-08-14 Production Casing Operation Performed
2019-08-16 Rig Released
2019-10-23 Perforation Treatment Performed - Jet Perforation
2019-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-07 Perforation Treatment Performed - Jet Perforation
2019-11-10 Perforation Treatment Performed - Jet Perforation
2019-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-11 Perforation Treatment Performed - Jet Perforation
2019-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-12 Perforation Treatment Performed - Jet Perforation
2019-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-13 Perforation Treatment Performed - Jet Perforation
2019-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-14 Perforation Treatment Performed - Jet Perforation
2019-11-15 Perforation Treatment Performed - Jet Perforation
2019-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-16 Perforation Treatment Performed - Jet Perforation
2019-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-17 Perforation Treatment Performed - Jet Perforation
2019-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-18 Perforation Treatment Performed - Jet Perforation
2019-11-19 Perforation Treatment Performed - Jet Perforation
2019-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-22 Perforation Treatment Performed - Jet Perforation
2019-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-23 Perforation Treatment Performed - Jet Perforation
2019-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-24 Perforation Treatment Performed - Jet Perforation
2019-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-25 Perforation Treatment Performed - Jet Perforation
2019-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-09 Well Began Production
2020-02-09 Well Fluid changed to Shale Gas Only
2020-02-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-01 Ensign Drilling Inc. 144 Drill To LD
2019-06-14 Ensign Drilling Inc. 144 Set Surface
2019-06-16 Ensign Drilling Inc. 144 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-06-14 190.20 Deviate (5 - 79 degrees)
2019-08-05 3461.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-23 Perforation 5314.90 5315.40 12
2019-11-07 Perforation 5193.90 5194.40 10
2019-11-22 Perforation 4029.70 4030.20 14
2019-11-22 Perforation 4014.60 4015.10 10
2019-11-22 Perforation 3999.40 3999.90 10
2019-11-22 Perforation 3984.30 3984.80 8
2019-11-22 Multi-Stage Fracture 3984.30 4060.40 0
2019-11-22 Perforation 3969.20 3969.70 16
2019-11-22 Perforation 3953.60 3954.10 12
2019-11-22 Perforation 3939.00 3939.50 14
2019-11-22 Perforation 3923.80 3924.30 10
2019-11-22 Perforation 3908.70 3909.20 10
2019-11-07 Perforation 5178.80 5179.30 8
2019-11-22 Perforation 3893.60 3894.10 8
2019-11-23 Multi-Stage Fracture 3893.60 3969.70 0
2019-11-23 Perforation 3879.50 3880.00 16
2019-11-23 Perforation 3863.40 3863.90 12
2019-11-23 Perforation 3848.20 3848.70 14
2019-11-23 Perforation 3833.10 3833.60 10
2019-11-23 Perforation 3818.00 3818.50 10
2019-11-23 Perforation 3803.90 3804.40 8
2019-11-23 Multi-Stage Fracture 3802.90 3880.00 0
2019-11-23 Perforation 3787.80 3788.30 16
2019-11-07 Perforation 5163.70 5164.20 8
2019-11-23 Perforation 3772.60 3773.10 12
2019-11-23 Perforation 3757.50 3758.00 14
2019-11-23 Perforation 3742.40 3742.90 10
2019-11-23 Perforation 3727.30 3727.80 10
2019-11-23 Perforation 3712.20 3712.70 8
2019-11-24 Multi-Stage Fracture 3712.00 3803.00 0
2019-11-24 Perforation 3697.00 3697.50 16
2019-11-24 Perforation 3681.90 3682.40 12
2019-11-24 Perforation 3666.80 3667.30 14
2019-11-24 Perforation 3652.70 3653.20 10
2019-11-10 Multi-Stage Fracture 5163.70 5239.80 0
2019-11-24 Perforation 3636.60 3637.10 10
2019-11-24 Perforation 3621.40 3621.90 8
2019-11-24 Multi-Stage Fracture 3621.40 3697.50 0
2019-11-25 Perforation 3606.30 3606.80 16
2019-11-25 Perforation 3591.20 3591.70 12
2019-11-25 Perforation 3576.10 3576.60 14
2019-11-25 Perforation 3561.00 3561.50 10
2019-11-25 Perforation 3545.80 3546.30 10
2019-11-25 Perforation 3530.70 3531.20 8
2019-11-25 Multi-Stage Fracture 3530.70 3606.80 0
2019-11-10 Perforation 5148.60 5149.10 14
2019-11-25 Perforation 3515.60 3516.10 16
2019-11-25 Perforation 3500.50 3501.00 12
2019-11-25 Perforation 3484.40 3484.90 14
2019-11-25 Perforation 3470.20 3470.70 10
2019-11-25 Perforation 3455.10 3455.60 10
2019-11-25 Perforation 3440.00 3440.50 8
2019-11-26 Multi-Stage Fracture 3440.00 3516.10 0
2019-11-10 Perforation 5133.40 5133.90 12
2019-11-10 Perforation 5118.30 5118.80 10
2019-11-10 Perforation 5103.20 5103.70 10
2019-11-10 Perforation 5088.10 5088.60 8
2019-11-10 Perforation 5073.00 5073.50 8
2019-10-23 Perforation 5299.80 5300.30 12
2019-11-11 Multi-Stage Fracture 5073.00 5149.10 0
2019-11-11 Perforation 5057.80 5058.30 14
2019-11-11 Perforation 5042.70 5043.20 12
2019-11-11 Perforation 5027.60 5028.10 10
2019-11-11 Perforation 5012.50 5013.00 10
2019-11-11 Perforation 4997.40 4997.90 8
2019-11-11 Perforation 4982.20 4982.70 8
2019-11-12 Multi-Stage Fracture 4982.20 5058.30 0
2019-11-12 Perforation 4967.10 4967.60 16
2019-11-12 Perforation 4952.00 4952.50 12
2019-10-23 Perforation 5284.60 5285.10 12
2019-11-12 Perforation 4936.90 4937.40 14
2019-11-12 Perforation 4921.80 4922.30 10
2019-11-12 Perforation 4906.60 4907.10 10
2019-11-12 Perforation 4891.50 4892.00 8
2019-11-13 Multi-Stage Fracture 4891.50 4967.60 0
2019-11-13 Perforation 4876.40 4876.90 16
2019-11-13 Perforation 4861.30 4861.80 12
2019-11-13 Perforation 4846.20 4846.70 14
2019-11-13 Perforation 4831.00 4831.50 10
2019-11-13 Perforation 4815.90 4816.40 10
2019-10-23 Perforation 5269.50 5270.00 12
2019-11-13 Perforation 4800.80 4801.30 8
2019-11-13 Multi-Stage Fracture 4800.80 4876.90 0
2019-11-14 Perforation 4785.70 4786.20 16
2019-11-14 Perforation 4772.60 4773.10 12
2019-11-14 Perforation 4755.40 4755.90 14
2019-11-14 Perforation 4740.30 4740.80 10
2019-11-14 Perforation 4725.20 4725.70 10
2019-11-14 Perforation 4710.10 4710.60 8
2019-11-15 Multi-Stage Fracture 4710.10 4786.20 0
2019-11-15 Perforation 4694.00 4694.50 16
2019-10-23 Perforation 5254.50 5255.00 12
2019-11-15 Perforation 4679.80 4680.30 12
2019-11-15 Perforation 4664.70 4665.20 14
2019-11-15 Perforation 4649.60 4650.10 10
2019-11-15 Perforation 4634.50 4635.00 10
2019-11-15 Perforation 4619.40 4619.90 8
2019-11-15 Multi-Stage Fracture 4619.40 4695.50 0
2019-11-16 Perforation 4604.20 4604.70 16
2019-11-16 Perforation 4589.10 4589.60 12
2019-11-16 Perforation 4574.00 4574.50 14
2019-11-16 Perforation 4558.90 4559.40 10
2019-11-06 Multi-Stage Fracture 5254.50 5315.40 0
2019-11-16 Perforation 4543.80 4544.30 10
2019-11-16 Perforation 4528.60 4529.10 8
2019-11-16 Multi-Stage Fracture 4528.60 4604.70 0
2019-11-16 Perforation 4513.50 4514.00 16
2019-11-16 Perforation 4498.40 4498.90 12
2019-11-16 Perforation 4483.30 4483.80 14
2019-11-16 Perforation 4467.00 4467.50 10
2019-11-16 Perforation 4453.00 4453.50 10
2019-11-16 Perforation 4437.90 4438.40 8
2019-11-17 Multi-Stage Fracture 4437.90 4514.00 0
2019-11-07 Perforation 5239.30 5239.80 14
2019-11-17 Perforation 4422.80 4423.30 16
2019-11-17 Perforation 4407.70 4408.20 12
2019-11-17 Perforation 4390.80 4391.30 14
2019-11-17 Perforation 4377.40 4377.90 10
2019-11-17 Perforation 4362.30 4362.80 10
2019-11-17 Perforation 4347.20 4347.70 8
2019-11-17 Multi-Stage Fracture 4347.20 4423.30 0
2019-11-18 Perforation 4332.10 4332.60 16
2019-11-18 Perforation 4317.00 4317.50 12
2019-11-18 Perforation 4301.80 4302.30 14
2019-11-07 Perforation 5224.20 5224.70 12
2019-11-18 Perforation 4286.70 4287.20 10
2019-11-18 Perforation 4271.60 4272.10 10
2019-11-18 Perforation 4256.50 4257.00 8
2019-11-19 Multi-Stage Fracture 4256.50 4332.60 0
2019-11-19 Perforation 4241.40 4241.90 16
2019-11-19 Perforation 4226.20 4226.70 12
2019-11-19 Perforation 4211.10 4211.60 14
2019-11-19 Perforation 4196.00 4196.50 10
2019-11-19 Perforation 4180.90 4181.40 10
2019-11-19 Perforation 4165.80 4166.30 8
2019-11-07 Perforation 5209.00 5209.50 10
2019-11-19 Perforation 4150.60 4151.10 16
2019-11-19 Perforation 4135.50 4136.00 12
2019-11-19 Perforation 4120.40 4120.90 14
2019-11-19 Perforation 4105.30 4105.80 10
2019-11-19 Perforation 4091.20 4091.70 10
2019-11-19 Perforation 4075.00 4075.50 8
2019-11-21 Multi-Stage Fracture 4165.80 4241.90 0
2019-11-22 Perforation 4059.90 4060.40 16
2019-11-22 Multi-Stage Fracture 4075.00 4151.10 0
2019-11-22 Perforation 4044.80 4045.30 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-06 2019-11-26 3,084 35,364 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.0093 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 11.5477 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.1249 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.1509 N/A
Water 7732-18-5 100 0.1509 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0076 N/A
Dibromoacetonitrile 3252-43-5 100 0.0076 N/A
Polyethylene Glycol 25322-68-3 100 0.0076 N/A
Sodium Bromide 7647-15-6 100 0.0076 N/A
Water 7732-18-5 100 0.0076 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0017 N/A
1-decanol 112-30-1 100 0.0017 N/A
1-octanol 111-87-5 100 0.0017 N/A
2-butoxy ethanol 111-76-2 100 0.0017 N/A
2-propanol 67-63-0 100 0.0017 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0017 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0017 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0017 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0017 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0017 N/A
Water 7732-18-5 100 0.0017 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
FraCare NE-04 BJ Services Demulsifier 2-Ethylhexanol 104-76-7 100 0.0013 N/A
Ethoxylated alcohol. branched 78330-20-8 100 0.0013 N/A
Ethoxylated alcohol. branched 78330-19-5 100 0.0013 N/A
Heavy Aromatic Naphtha 64742-94-5 100 0.0013 N/A
Isopropanol 67-63-0 100 0.0013 N/A
Methanol 67-56-1 100 0.0013 N/A
Naphthalene 91-20-3 100 0.0013 N/A
Organic Sulfonic Acid 10638 100 0.0013 N/A
Oxyalkylated Polymer 10638 100 0.0013 N/A
Polyalkylene glycol 10638 100 0.0013 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1111 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1111 N/A
Lecitihins. soya 8030-76-0 100 0.1111 N/A
polymer Trade Secret 100 0.1111 N/A
Water 7732-18-5 100 0.1111 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0026 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0208 N/A
Water 7732-18-5 100 0.0208 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 812 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-18 Lost Circulation 2227.00 2227.00
2019-06-20 Lost Circulation 2957.00 2957.00
2019-06-20 Lost Circulation 2957.00 2957.00
2019-06-21 Lost Circulation 2957.00 2957.00
2019-06-22 Lost Circulation 2957.00 2957.00
2019-08-09 Lost Circulation 1000.00 2146.00
2019-08-14 Lost Circulation 5384.00 5384.00
2020-01-21 No Incident Encountered 0.00 0.00
2019-12-09 No Incident Encountered 0.00 0.00

For data sources see[9]

References