X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625193014000

Well Details

Well ID: 0625193014000
Loading map...
Location: 00/14-30-062-19W5/0
Location Alias: 00/14-30-62-19 W5M
Location Alias 2: 00/14-30-062-19 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ FOXCK 14-30-62-19
Operator Name: Chevron Canada Limited
License Number: 0493389
License Date: 2019-01-10
License Status: Amended
Spud Date: 2019-06-13
Final Drill Date: 2019-08-24
Well Total Depth: 5758.00 m
Surface Hole Latitude: 54.377802
Surface Hole Longitude: -116.825925

For data sources see[1][2]

Well History

Date Event
2019-01-10 Obtained License
2019-06-13 Direction Drilling Operation Performed - Deviate
2019-06-13 Set Surface
2019-06-14 Surface Casing Operation Performed
2019-06-23 Resumption
2019-06-24 Kick Occurred
2019-06-24 Lost Circulation Occurred
2019-06-28 Intermediate Casing Operation Performed
2019-06-28 Lost Circulation Occurred
2019-08-17 Drill To LD
2019-08-18 Direction Drilling Operation Performed - Horizontal
2019-08-24 Finished Drilling
2019-08-24 Well Log Performed
2019-08-24 Well Mode changed to Drilled and Cased
2019-08-25 Well Log Performed
2019-08-27 Lost Circulation Occurred
2019-08-27 Production Casing Operation Performed
2019-08-27 Well Log Performed
2019-08-28 Rig Released
2019-10-23 Perforation Treatment Performed - Jet Perforation
2019-11-07 Perforation Treatment Performed - Jet Perforation
2019-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-11 Perforation Treatment Performed - Jet Perforation
2019-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-12 Perforation Treatment Performed - Jet Perforation
2019-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-13 Perforation Treatment Performed - Jet Perforation
2019-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-14 Perforation Treatment Performed - Jet Perforation
2019-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-15 Perforation Treatment Performed - Jet Perforation
2019-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-16 Perforation Treatment Performed - Jet Perforation
2019-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-17 Perforation Treatment Performed - Jet Perforation
2019-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-18 Perforation Treatment Performed - Jet Perforation
2019-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-19 Perforation Treatment Performed - Jet Perforation
2019-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-20 Perforation Treatment Performed - Jet Perforation
2019-11-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-21 Perforation Treatment Performed - Jet Perforation
2019-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-22 Perforation Treatment Performed - Jet Perforation
2019-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-23 Perforation Treatment Performed - Jet Perforation
2019-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-24 Perforation Treatment Performed - Jet Perforation
2019-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-25 Perforation Treatment Performed - Jet Perforation
2019-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-16 Well Began Production
2020-02-16 Well Fluid changed to Shale Gas Only
2020-02-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-13 Ensign Drilling Inc. 144 Set Surface
2019-08-17 Ensign Drilling Inc. 144 Drill To LD
2019-06-23 Ensign Drilling Inc. 144 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-06-13 461.60 Deviate (5 - 79 degrees)
2019-08-18 3332.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-23 Perforation 5673.60 5674.10 12
2019-11-07 Perforation 5550.60 5551.10 10
2019-11-20 Perforation 4366.30 4366.80 14
2019-11-20 Perforation 4350.90 4351.40 10
2019-11-20 Perforation 4335.50 4336.00 10
2019-11-20 Perforation 4320.10 4320.60 8
2019-11-20 Multi-Stage Fracture 4320.10 4397.90 0
2019-11-21 Perforation 4305.10 4305.60 16
2019-11-21 Perforation 4289.40 4289.90 12
2019-11-21 Perforation 4274.00 4274.50 14
2019-11-21 Perforation 4258.60 4259.10 10
2019-11-21 Perforation 4243.20 4243.70 10
2019-11-07 Perforation 5535.20 5535.70 8
2019-11-21 Perforation 4227.80 4228.30 8
2019-11-21 Multi-Stage Fracture 4227.80 4305.60 0
2019-11-21 Perforation 4212.80 4213.30 16
2019-11-21 Perforation 4197.10 4197.60 12
2019-11-21 Perforation 4180.70 4181.20 14
2019-11-21 Perforation 4166.30 4166.80 10
2019-11-21 Perforation 4150.90 4151.40 10
2019-11-21 Perforation 4135.60 4136.10 8
2019-11-21 Multi-Stage Fracture 4135.60 4213.30 0
2019-11-21 Perforation 4120.60 4121.10 16
2019-11-07 Perforation 5519.80 5520.30 8
2019-11-21 Perforation 4104.80 4105.30 12
2019-11-21 Perforation 4089.40 4089.90 14
2019-11-21 Perforation 4074.00 4074.50 10
2019-11-21 Perforation 4058.70 4059.20 10
2019-11-21 Perforation 4042.30 4042.80 8
2019-11-22 Multi-Stage Fracture 4040.30 4123.60 0
2019-11-22 Perforation 4027.30 4027.80 16
2019-11-22 Perforation 4012.50 4013.00 12
2019-11-22 Perforation 3997.10 3997.60 14
2019-11-22 Perforation 3981.70 3982.20 10
2019-11-10 Multi-Stage Fracture 5519.80 5597.60 0
2019-11-22 Perforation 3967.40 3967.90 10
2019-11-22 Perforation 3951.00 3951.50 8
2019-11-22 Multi-Stage Fracture 3951.00 4028.80 0
2019-11-22 Perforation 3936.00 3936.50 16
2019-11-22 Perforation 3920.20 3920.70 12
2019-11-22 Perforation 3904.80 3905.30 14
2019-11-22 Perforation 3890.50 3891.00 10
2019-11-22 Perforation 3874.10 3874.60 10
2019-11-22 Perforation 3858.70 3859.20 8
2019-11-22 Multi-Stage Fracture 3858.70 3936.50 0
2019-11-11 Perforation 5504.80 5505.30 14
2019-11-22 Perforation 3843.70 3844.20 16
2019-11-22 Perforation 3827.90 3828.40 12
2019-11-22 Perforation 3812.60 3813.10 14
2019-11-22 Perforation 3797.20 3797.70 10
2019-11-22 Perforation 3781.80 3782.30 10
2019-11-22 Perforation 3766.40 3766.90 8
2019-11-23 Multi-Stage Fracture 3766.40 3844.20 0
2019-11-23 Perforation 3751.40 3751.90 16
2019-11-23 Perforation 3735.70 3736.20 12
2019-11-23 Perforation 3720.30 3720.80 14
2019-11-11 Perforation 5489.10 5489.60 12
2019-11-23 Perforation 3704.90 3705.40 10
2019-11-23 Perforation 3689.50 3690.00 10
2019-11-23 Perforation 3675.10 3675.60 8
2019-11-23 Multi-Stage Fracture 3674.10 3751.90 0
2019-11-24 Perforation 3659.10 3659.60 16
2019-11-24 Perforation 3643.40 3643.90 12
2019-11-24 Perforation 3628.00 3628.50 14
2019-11-24 Perforation 3611.60 3612.10 10
2019-11-24 Perforation 3597.20 3597.70 10
2019-11-24 Perforation 3581.90 3582.40 8
2019-11-11 Perforation 5473.70 5474.20 10
2019-11-24 Multi-Stage Fracture 3581.90 3659.60 0
2019-11-24 Perforation 3566.90 3567.40 16
2019-11-24 Perforation 3551.10 3551.60 12
2019-11-24 Perforation 3535.70 3536.20 14
2019-11-24 Perforation 3520.30 3520.80 10
2019-11-24 Perforation 3504.90 3505.40 10
2019-11-24 Perforation 3489.60 3490.10 8
2019-11-25 Multi-Stage Fracture 3489.60 3567.40 0
2019-11-25 Perforation 3474.60 3475.10 16
2019-11-25 Perforation 3458.80 3459.30 12
2019-11-11 Perforation 5458.30 5458.80 10
2019-11-25 Perforation 3443.40 3443.90 14
2019-11-25 Perforation 3428.00 3428.50 10
2019-11-25 Perforation 3412.70 3413.20 10
2019-11-25 Perforation 3396.80 3397.30 8
2019-11-25 Multi-Stage Fracture 3396.80 3475.10 0
2019-11-25 Perforation 3382.30 3382.80 16
2019-11-25 Perforation 3366.50 3367.00 12
2019-11-25 Perforation 3351.10 3351.60 14
2019-11-25 Perforation 3335.80 3336.30 10
2019-11-25 Perforation 3320.40 3320.90 10
2019-11-11 Perforation 5442.90 5443.40 8
2019-11-25 Perforation 3305.00 3305.50 8
2019-11-26 Multi-Stage Fracture 3305.00 3382.80 0
2019-11-11 Perforation 5427.50 5428.00 8
2019-10-23 Perforation 5658.20 5658.70 12
2019-11-11 Multi-Stage Fracture 5427.50 5505.30 0
2019-11-11 Perforation 5412.50 5413.00 14
2019-11-11 Perforation 5396.80 5397.30 12
2019-11-11 Perforation 5381.40 5381.90 10
2019-11-11 Perforation 5366.00 5366.50 10
2019-11-11 Perforation 5350.60 5351.10 8
2019-11-11 Perforation 5335.20 5335.70 8
2019-11-12 Multi-Stage Fracture 5335.20 5413.00 0
2019-11-12 Perforation 5320.20 5320.70 14
2019-11-12 Perforation 5304.50 5305.00 12
2019-10-23 Perforation 5642.90 5643.40 12
2019-11-12 Perforation 5289.10 5289.60 10
2019-11-12 Perforation 5273.70 5274.20 10
2019-11-12 Perforation 5258.30 5258.80 8
2019-11-12 Perforation 5243.00 5243.50 8
2019-11-13 Multi-Stage Fracture 5243.00 5320.70 0
2019-11-13 Perforation 5229.00 5229.50 14
2019-11-13 Perforation 5212.20 5212.70 12
2019-11-13 Perforation 5196.80 5197.30 10
2019-11-13 Perforation 5181.40 5181.90 10
2019-11-13 Perforation 5166.10 5166.60 8
2019-10-23 Perforation 5627.50 5628.00 12
2019-11-13 Perforation 5149.70 5150.20 8
2019-11-14 Multi-Stage Fracture 5149.70 5229.50 0
2019-11-14 Perforation 5135.70 5136.20 14
2019-11-14 Perforation 5119.90 5120.40 12
2019-11-14 Perforation 5104.50 5105.00 10
2019-11-14 Perforation 5089.20 5089.70 10
2019-11-14 Perforation 5074.40 5074.90 8
2019-11-14 Perforation 5057.30 5057.80 8
2019-11-15 Multi-Stage Fracture 5057.30 5136.70 0
2019-11-15 Perforation 5043.40 5043.90 14
2019-10-23 Perforation 5612.10 5612.60 12
2019-11-15 Perforation 5027.60 5028.10 12
2019-11-15 Perforation 5012.30 5012.80 10
2019-11-15 Perforation 4996.90 4997.40 10
2019-11-15 Perforation 4979.80 4980.30 8
2019-11-15 Perforation 4966.10 4966.60 8
2019-11-15 Multi-Stage Fracture 4966.10 5043.90 0
2019-11-16 Perforation 4951.10 4951.60 16
2019-11-16 Perforation 4935.30 4935.80 12
2019-11-16 Perforation 4919.50 4920.00 14
2019-11-16 Perforation 4904.60 4905.10 10
2019-11-07 Multi-Stage Fracture 5612.10 5674.10 0
2019-11-16 Perforation 4889.20 4889.70 10
2019-11-16 Perforation 4873.80 4874.30 8
2019-11-16 Multi-Stage Fracture 4873.80 4951.60 0
2019-11-17 Perforation 4858.80 4859.30 16
2019-11-17 Perforation 4843.10 4843.60 12
2019-11-17 Perforation 4827.70 4828.20 14
2019-11-17 Perforation 4812.30 4812.80 10
2019-11-17 Perforation 4796.90 4797.40 10
2019-11-17 Perforation 4781.50 4782.00 8
2019-11-17 Multi-Stage Fracture 4781.50 4859.30 0
2019-11-07 Perforation 5597.10 5597.60 14
2019-11-17 Perforation 4766.50 4767.00 16
2019-11-17 Perforation 4750.80 4751.30 12
2019-11-17 Perforation 4735.40 4735.90 14
2019-11-17 Perforation 4720.00 4720.50 10
2019-11-17 Perforation 4705.80 4706.30 10
2019-11-17 Perforation 4689.30 4689.80 8
2019-11-18 Multi-Stage Fracture 4689.30 4767.00 0
2019-11-18 Perforation 4674.30 4674.80 16
2019-11-18 Perforation 4658.50 4659.00 12
2019-11-18 Perforation 4643.10 4643.60 14
2019-11-07 Perforation 5581.30 5581.80 12
2019-11-18 Perforation 4627.70 4628.20 10
2019-11-18 Perforation 4612.40 4612.90 10
2019-11-18 Perforation 4597.00 4597.50 8
2019-11-18 Multi-Stage Fracture 4597.00 4674.80 0
2019-11-18 Perforation 4582.00 4582.50 16
2019-11-18 Perforation 4566.20 4566.70 12
2019-11-18 Perforation 4550.80 4551.30 14
2019-11-18 Perforation 4535.50 4536.00 10
2019-11-18 Perforation 4520.10 4520.60 10
2019-11-18 Perforation 4504.70 4505.20 8
2019-11-07 Perforation 5566.00 5566.50 10
2019-11-19 Multi-Stage Fracture 4504.70 4582.50 0
2019-11-19 Perforation 4489.70 4490.20 16
2019-11-19 Perforation 4472.90 4473.40 12
2019-11-19 Perforation 4458.50 4459.00 14
2019-11-19 Perforation 4443.20 4443.70 10
2019-11-19 Perforation 4427.80 4428.30 10
2019-11-19 Perforation 4412.40 4412.90 8
2019-11-19 Multi-Stage Fracture 4412.40 4490.20 0
2019-11-20 Perforation 4397.40 4397.90 16
2019-11-20 Perforation 4381.60 4382.10 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-07 2019-11-26 3,082 43,910 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.8403 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 11.6478 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.2098 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.1381 N/A
Water 7732-18-5 100 0.1381 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0078 N/A
Dibromoacetonitrile 3252-43-5 100 0.0078 N/A
Polyethylene Glycol 25322-68-3 100 0.0078 N/A
Sodium Bromide 7647-15-6 100 0.0078 N/A
Water 7732-18-5 100 0.0078 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0016 N/A
1-decanol 112-30-1 100 0.0016 N/A
1-octanol 111-87-5 100 0.0016 N/A
2-butoxy ethanol 111-76-2 100 0.0016 N/A
2-propanol 67-63-0 100 0.0016 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0016 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0016 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0016 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0016 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0016 N/A
Water 7732-18-5 100 0.0016 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
FraCare NE-04 BJ Services Demulsifier 2-Ethylhexanol 104-76-7 100 0.0012 N/A
Ethoxylated alcohol. branched 78330-19-5 100 0.0012 N/A
Ethoxylated alcohol. branched 78330-20-8 100 0.0012 N/A
Heavy Aromatic Naphtha 64742-94-5 100 0.0012 N/A
Isopropanol 67-63-0 100 0.0012 N/A
Methanol 67-56-1 100 0.0012 N/A
Naphthalene 91-20-3 100 0.0012 N/A
Organic Sulfonic Acid 10638 100 0.0012 N/A
Oxyalkylated Polymer 10638 100 0.0012 N/A
Polyalkylene glycol 10638 100 0.0012 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1089 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1089 N/A
Lecitihins. soya 8030-76-0 100 0.1089 N/A
polymer Trade Secret 100 0.1089 N/A
Water 7732-18-5 100 0.1089 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0025 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0203 N/A
Water 7732-18-5 100 0.0203 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 616 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-24 Kick 2168.00 2168.00
2019-06-24 Lost Circulation 2176.00 2200.00
2019-06-28 Lost Circulation 2867.00 2867.00
2019-08-27 Lost Circulation 5741.00 5741.00
2019-08-27 Lost Circulation 5741.00 5741.00
2020-01-22 No Incident Encountered 0.00 0.00
2019-12-08 No Incident Encountered 0.00 0.00

For data sources see[9]

References