X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625192902000

Well Details

Well ID: 0625192902000
Loading map...
Location: 00/02-29-062-19W5/0
Location Alias: 00/02-29-62-19 W5M
Location Alias 2: 00/02-29-062-19 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ FOXCK 2-29-62-19
Operator Name: Chevron Canada Limited
License Number: 0490797
License Date: 2018-09-06
License Status: Amended
Spud Date: 2019-01-26
Final Drill Date: 2019-03-10
Well Total Depth: 5610.00 m
Surface Hole Latitude: 54.370326
Surface Hole Longitude: -116.787274

For data sources see[1][2]

Well History

Date Event
2018-09-06 Obtained License
2019-01-26 Surface Casing Operation Performed
2019-01-28 Direction Drilling Operation Performed - Deviate
2019-01-30 Kick Occurred
2019-01-30 Lost Circulation Occurred
2019-02-01 Lost Circulation Occurred
2019-02-03 Well Log Performed
2019-02-07 Well Log Performed
2019-02-08 Intermediate Casing Operation Performed
2019-03-04 Direction Drilling Operation Performed - Horizontal
2019-03-10 Finished Drilling
2019-03-10 Well Mode changed to Drilled and Cased
2019-03-17 Well Log Performed
2019-03-19 Production Casing Operation Performed
2019-03-20 Well Log Performed
2019-03-21 Rig Released
2019-05-23 Perforation Treatment Performed - Jet Perforation
2019-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-24 Perforation Treatment Performed - Jet Perforation
2019-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-25 Perforation Treatment Performed - Jet Perforation
2019-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-26 Perforation Treatment Performed - Jet Perforation
2019-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-27 Perforation Treatment Performed - Jet Perforation
2019-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-28 Perforation Treatment Performed - Jet Perforation
2019-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-29 Perforation Treatment Performed - Jet Perforation
2019-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-30 Perforation Treatment Performed - Jet Perforation
2019-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-31 Perforation Treatment Performed - Jet Perforation
2019-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-07 Well Log Performed
2019-07-31 Well Began Production
2019-07-31 Well Fluid changed to Shale Gas Only
2019-07-31 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-02 Ensign Drilling Inc. 785 N/A Drill To LD
2019-01-26 Ensign Drilling Inc. 785 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-28 499.30 Deviate (5 - 79 degrees)
2019-03-04 3272.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-23 Perforation 5518.30 5518.80 12
2019-05-23 Perforation 5401.00 5401.50 10
2019-05-28 Perforation 4271.90 4272.40 10
2019-05-28 Perforation 4257.20 4257.70 8
2019-05-28 Perforation 4242.50 4243.00 8
2019-05-28 Perforation 4227.90 4228.40 8
2019-05-28 Multi-Stage Fracture 4227.90 4308.50 0
2019-05-28 Perforation 4213.20 4213.70 14
2019-05-28 Perforation 4198.50 4199.00 12
2019-05-28 Perforation 4183.90 4184.40 10
2019-05-28 Perforation 4169.20 4169.70 10
2019-05-28 Perforation 4154.50 4155.00 8
2019-05-23 Perforation 5386.40 5386.90 10
2019-05-28 Perforation 4139.90 4140.40 8
2019-05-28 Multi-Stage Fracture 4139.90 4220.50 0
2019-05-28 Perforation 4125.20 4125.70 12
2019-05-28 Perforation 4110.50 4111.00 12
2019-05-28 Perforation 4095.90 4096.40 10
2019-05-28 Perforation 4081.20 4081.70 8
2019-05-28 Perforation 4066.60 4067.10 8
2019-05-28 Perforation 4051.90 4052.40 8
2019-05-28 Multi-Stage Fracture 4051.90 4125.70 0
2019-05-29 Perforation 4037.20 4037.70 14
2019-05-23 Perforation 5371.70 5372.20 10
2019-05-29 Perforation 4022.60 4023.10 12
2019-05-29 Perforation 4007.90 4008.40 10
2019-05-29 Perforation 3993.20 3993.70 10
2019-05-29 Perforation 3978.60 3979.10 8
2019-05-29 Perforation 3963.90 3964.40 8
2019-05-29 Multi-Stage Fracture 3963.90 4045.10 0
2019-05-29 Perforation 3949.20 3949.70 14
2019-05-29 Perforation 3934.60 3935.10 12
2019-05-29 Perforation 3919.90 3920.40 10
2019-05-29 Perforation 3905.20 3905.70 10
2019-05-24 Multi-Stage Fracture 5371.70 5452.30 0
2019-05-29 Perforation 3890.60 3891.10 8
2019-05-29 Perforation 3875.90 3876.40 8
2019-05-29 Multi-Stage Fracture 3875.90 3957.10 0
2019-05-29 Perforation 3861.20 3861.70 14
2019-05-29 Perforation 3846.60 3847.10 12
2019-05-29 Perforation 3831.90 3832.40 10
2019-05-29 Perforation 3817.30 3817.80 10
2019-05-29 Perforation 3802.60 3803.10 8
2019-05-29 Perforation 3787.90 3788.40 8
2019-05-29 Multi-Stage Fracture 3787.90 3861.70 0
2019-05-24 Perforation 5357.00 5357.50 12
2019-05-29 Perforation 3773.30 3773.80 14
2019-05-29 Perforation 3758.60 3759.10 12
2019-05-29 Perforation 3743.90 3744.40 10
2019-05-29 Perforation 3729.30 3729.80 10
2019-05-29 Perforation 3714.60 3715.10 8
2019-05-29 Perforation 3699.90 3700.40 8
2019-05-30 Multi-Stage Fracture 3699.90 3773.80 0
2019-05-30 Perforation 3685.30 3685.80 14
2019-05-30 Perforation 3670.60 3671.10 12
2019-05-30 Perforation 3655.90 3656.40 10
2019-05-24 Perforation 5342.40 5342.90 12
2019-05-30 Perforation 3641.30 3641.80 10
2019-05-30 Perforation 3626.60 3627.10 8
2019-05-30 Perforation 3612.00 3612.50 8
2019-05-30 Multi-Stage Fracture 3612.00 3692.60 0
2019-05-30 Perforation 3597.30 3597.80 14
2019-05-30 Perforation 3582.60 3583.10 12
2019-05-30 Perforation 3568.00 3568.50 10
2019-05-30 Perforation 3553.30 3553.80 10
2019-05-30 Perforation 3538.60 3539.10 8
2019-05-30 Perforation 3524.00 3524.50 8
2019-05-24 Perforation 5327.70 5328.20 10
2019-05-30 Multi-Stage Fracture 3524.00 3604.60 0
2019-05-30 Perforation 3509.30 3509.80 14
2019-05-30 Perforation 3494.60 3495.10 12
2019-05-30 Perforation 3480.00 3480.50 10
2019-05-30 Perforation 3465.30 3465.80 8
2019-05-30 Perforation 3450.60 3451.10 8
2019-05-30 Perforation 3436.00 3436.50 8
2019-05-30 Multi-Stage Fracture 3436.00 3509.80 0
2019-05-31 Perforation 3421.30 3421.80 14
2019-05-31 Perforation 3406.60 3407.10 12
2019-05-24 Perforation 5313.00 5313.50 8
2019-05-31 Perforation 3392.00 3392.50 10
2019-05-31 Perforation 3377.30 3377.80 10
2019-05-31 Perforation 3362.70 3363.20 8
2019-05-31 Perforation 3348.00 3348.50 8
2019-05-31 Multi-Stage Fracture 3348.00 3428.60 0
2019-05-31 Perforation 3333.30 3333.80 14
2019-05-31 Perforation 3318.70 3319.20 12
2019-05-31 Perforation 3304.00 3304.50 10
2019-05-31 Perforation 3289.30 3289.80 10
2019-05-31 Perforation 3274.70 3275.20 8
2019-05-24 Perforation 5298.40 5298.90 8
2019-05-31 Perforation 3259.50 3260.00 8
2019-05-31 Multi-Stage Fracture 3260.00 3341.20 0
2019-05-24 Perforation 5282.70 5283.20 8
2019-05-23 Perforation 5503.70 5504.20 12
2019-05-24 Multi-Stage Fracture 5281.00 5365.40 0
2019-05-24 Perforation 5269.00 5269.50 12
2019-05-24 Perforation 5254.40 5254.90 12
2019-05-24 Perforation 5239.70 5240.20 10
2019-05-24 Perforation 5225.00 5225.50 8
2019-05-24 Perforation 5210.40 5210.90 8
2019-05-24 Perforation 5195.70 5196.20 8
2019-05-24 Multi-Stage Fracture 5195.70 5276.40 0
2019-05-25 Perforation 5181.10 5181.60 12
2019-05-25 Perforation 5166.40 5166.90 12
2019-05-23 Perforation 5489.00 5489.50 12
2019-05-25 Perforation 5151.70 5152.20 10
2019-05-25 Perforation 5137.10 5137.60 8
2019-05-25 Perforation 5122.40 5122.90 8
2019-05-25 Perforation 5107.70 5108.20 8
2019-05-25 Multi-Stage Fracture 5107.70 5188.40 0
2019-05-25 Perforation 5093.10 5093.60 12
2019-05-25 Perforation 5078.40 5078.90 12
2019-05-25 Perforation 5063.70 5064.20 10
2019-05-25 Perforation 5049.10 5049.60 8
2019-05-25 Perforation 5034.40 5034.90 8
2019-05-23 Perforation 5474.30 5474.80 12
2019-05-25 Perforation 5019.70 5020.20 8
2019-05-25 Multi-Stage Fracture 5019.70 5100.40 0
2019-05-25 Perforation 5005.10 5005.60 12
2019-05-25 Perforation 4990.40 4990.90 12
2019-05-25 Perforation 4975.70 4976.20 10
2019-05-25 Perforation 4961.10 4961.60 8
2019-05-25 Perforation 4946.40 4946.90 8
2019-05-25 Perforation 4931.80 4932.30 8
2019-05-25 Multi-Stage Fracture 4931.80 5012.40 0
2019-05-26 Perforation 4917.10 4917.60 12
2019-05-23 Perforation 5459.70 5460.20 12
2019-05-26 Perforation 4902.40 4902.90 12
2019-05-26 Perforation 4887.80 4888.30 10
2019-05-26 Perforation 4873.10 4873.60 8
2019-05-26 Perforation 4858.40 4858.90 8
2019-05-26 Perforation 4843.80 4844.30 8
2019-05-26 Multi-Stage Fracture 4843.80 4924.40 0
2019-05-26 Perforation 4829.10 4829.60 12
2019-05-26 Perforation 4814.40 4814.90 12
2019-05-26 Perforation 4799.80 4800.30 10
2019-05-26 Perforation 4785.10 4785.60 8
2019-05-23 Multi-Stage Fracture 5459.70 5533.00 0
2019-05-26 Perforation 4770.40 4770.90 8
2019-05-26 Perforation 4755.80 4756.30 8
2019-05-26 Multi-Stage Fracture 4755.80 4836.40 0
2019-05-26 Perforation 4741.10 4741.60 12
2019-05-26 Perforation 4726.50 4727.00 12
2019-05-26 Perforation 4711.80 4712.30 10
2019-05-26 Perforation 4697.10 4697.60 8
2019-05-26 Perforation 4682.50 4683.00 8
2019-05-26 Perforation 4667.80 4668.30 8
2019-05-26 Multi-Stage Fracture 4667.80 4748.90 0
2019-05-23 Perforation 5445.00 5445.50 10
2019-05-27 Perforation 4653.10 4653.60 12
2019-05-27 Perforation 4638.50 4639.00 12
2019-05-27 Perforation 4623.80 4624.30 10
2019-05-27 Perforation 4609.10 4609.60 8
2019-05-27 Perforation 4594.50 4595.00 8
2019-05-27 Perforation 4579.80 4580.30 8
2019-05-27 Multi-Stage Fracture 4579.80 4660.50 0
2019-05-27 Perforation 4565.10 4565.60 14
2019-05-27 Perforation 4550.50 4551.00 12
2019-05-27 Perforation 4535.80 4536.30 10
2019-05-23 Perforation 5430.30 5430.80 10
2019-05-27 Perforation 4521.10 4521.60 10
2019-05-27 Perforation 4506.50 4507.00 8
2019-05-27 Perforation 4494.80 4495.30 8
2019-05-27 Multi-Stage Fracture 4491.80 4572.50 0
2019-05-27 Perforation 4477.20 4477.70 14
2019-05-27 Perforation 4462.50 4463.00 12
2019-05-27 Perforation 4447.80 4448.30 10
2019-05-27 Perforation 4433.20 4433.70 10
2019-05-27 Perforation 4418.50 4419.00 8
2019-05-27 Perforation 4403.80 4404.30 8
2019-05-23 Perforation 5415.70 5416.20 10
2019-05-27 Multi-Stage Fracture 4403.80 4484.50 0
2019-05-27 Perforation 4389.20 4389.70 14
2019-05-27 Perforation 4374.50 4375.00 12
2019-05-27 Perforation 4359.80 4360.30 10
2019-05-27 Perforation 4345.20 4345.70 8
2019-05-27 Perforation 4330.50 4331.00 8
2019-05-27 Perforation 4315.80 4316.30 8
2019-05-28 Multi-Stage Fracture 4315.80 4396.50 0
2019-05-28 Perforation 4301.20 4301.70 12
2019-05-28 Perforation 4286.50 4287.00 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-23 2019-05-31 3,079 55,438 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.8267 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.2384 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.5653 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.1559 N/A
Water 7732-18-5 100 0.1559 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0084 N/A
Dibromoacetonitrile 3252-43-5 100 0.0084 N/A
Polyethylene Glycol 25322-68-3 100 0.0084 N/A
Sodium Bromide 7647-15-6 100 0.0084 N/A
Water 7732-18-5 100 0.0084 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0017 N/A
1-decanol 112-30-1 100 0.0017 N/A
1-octanol 111-87-5 100 0.0017 N/A
2-butoxy ethanol 111-76-2 100 0.0017 N/A
2-propanol 67-63-0 100 0.0017 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0017 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0017 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0017 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0017 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0017 N/A
Water 7732-18-5 100 0.0017 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier 2-Ethylhexanol 104-76-7 100 0.0013 N/A
Ethoxylated alcohol. branched 78330-19-5 100 0.0013 N/A
Ethoxylated alcohol. branched 78330-20-8 100 0.0013 N/A
Heavy Aromatic Naphtha 64742-94-5 100 0.0013 N/A
Isopropanol 67-63-0 100 0.0013 N/A
Methanol 67-56-1 100 0.0013 N/A
Naphthalene 91-20-3 100 0.0013 N/A
Organic Sulfonic Acid 10638 100 0.0013 N/A
Oxyalkylated Polymer 10638 100 0.0013 N/A
Polyalkylene glycol 10638 100 0.0013 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1517 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1517 N/A
Lecitihins. soya 8030-76-0 100 0.1517 N/A
polymer Trade Secret 100 0.1517 N/A
Water 7732-18-5 100 0.1517 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0027 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0207 N/A
Water 7732-18-5 100 0.0207 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-05-22 2019-05-31 Groundwater - Non-saline less than or equal to 150m deep 1453
2019-05-22 2019-05-31 Groundwater - Non-saline less than or equal to 150m deep 1119
2019-05-22 2019-05-23 Groundwater - Non-saline less than or equal to 150m deep 1327
2018-06-06 2018-06-19 Surface Water - River 51202

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1429 0.0 0.0 0.0
2020 2119 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-30 Lost Circulation 2467.00 2467.00
2019-01-30 Kick 2032.00 2032.00
2019-02-01 Lost Circulation 2467.00 2467.00
2019-06-01 No Incident Encountered 0.00 0.00
2019-05-15 No Incident Encountered 0.00 0.00
2019-06-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References