X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625191913020

Well Details

Well ID: 0625191913020
Loading map...
Location: 02/13-19-062-19W5/0
Location Alias: 02/13-19-62-19 W5M
Location Alias 2: 02/13-19-062-19 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 102 HZ KAYBOBS 13-19-62-19
Operator Name: Chevron Canada Limited
License Number: 0493383
License Date: 2019-01-10
License Status: Amended
Spud Date: 2019-06-08
Final Drill Date: 2019-10-09
Well Total Depth: 5055.00 m
Surface Hole Latitude: 54.377657
Surface Hole Longitude: -116.826565

For data sources see[1][2]

Well History

Date Event
2019-01-10 Obtained License
2019-06-08 Direction Drilling Operation Performed - Deviate
2019-06-08 Drill To LD
2019-06-09 Surface Casing Operation Performed
2019-07-26 Resumption
2019-07-27 Lost Circulation Occurred
2019-07-30 Intermediate Casing Operation Performed
2019-10-07 Drill To LD
2019-10-08 Direction Drilling Operation Performed - Horizontal
2019-10-09 Finished Drilling
2019-10-09 Well Log Performed
2019-10-09 Well Mode changed to Drilled and Cased
2019-10-10 Well Log Performed
2019-10-12 Production Casing Operation Performed
2019-10-12 Rig Released
2019-10-21 Perforation Treatment Performed - Jet Perforation
2019-10-28 Perforation Treatment Performed - Jet Perforation
2019-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-29 Perforation Treatment Performed - Jet Perforation
2019-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-30 Perforation Treatment Performed - Jet Perforation
2019-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-31 Perforation Treatment Performed - Jet Perforation
2019-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-01 Perforation Treatment Performed - Jet Perforation
2019-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-02 Perforation Treatment Performed - Jet Perforation
2019-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-03 Perforation Treatment Performed - Jet Perforation
2019-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-04 Perforation Treatment Performed - Jet Perforation
2019-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-05 Perforation Treatment Performed - Jet Perforation
2019-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-29 Well Began Production
2020-02-29 Well Fluid changed to Shale Gas Only
2020-02-29 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-07 Ensign Drilling Inc. 144 Drill To LD
2019-06-08 Ensign Drilling Inc. 144 Drill To LD
2019-07-26 Ensign Drilling Inc. 144 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-06-08 187.60 Deviate (5 - 79 degrees)
2019-10-08 3360.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-21 Perforation 4964.70 4965.20 12
2019-10-28 Perforation 4842.60 4843.10 10
2019-11-04 Perforation 3666.70 3667.20 14
2019-11-04 Perforation 3651.40 3651.90 10
2019-11-04 Perforation 3636.10 3636.60 10
2019-11-04 Perforation 3620.90 3621.40 8
2019-11-04 Multi-Stage Fracture 3620.90 3682.50 0
2019-11-04 Perforation 3605.90 3606.40 16
2019-11-04 Perforation 3590.30 3590.80 12
2019-11-04 Perforation 3575.10 3575.60 14
2019-11-04 Perforation 3559.80 3560.30 10
2019-11-04 Perforation 3544.50 3545.00 10
2019-10-28 Perforation 4827.30 4827.80 10
2019-11-04 Perforation 3529.30 3529.80 8
2019-11-04 Multi-Stage Fracture 3529.30 3590.80 0
2019-11-04 Perforation 3514.30 3514.80 16
2019-11-04 Perforation 3498.70 3499.20 12
2019-11-04 Perforation 3483.40 3483.90 14
2019-11-04 Perforation 3468.20 3468.70 10
2019-11-04 Perforation 3452.90 3453.40 10
2019-11-04 Perforation 3437.60 3438.10 8
2019-11-05 Multi-Stage Fracture 3437.60 3499.20 0
2019-11-05 Perforation 3422.60 3423.10 16
2019-10-28 Perforation 4812.00 4812.50 8
2019-11-05 Perforation 3407.10 3407.60 12
2019-11-05 Perforation 3391.80 3392.30 14
2019-11-05 Perforation 3376.50 3377.00 10
2019-11-05 Perforation 3361.30 3361.80 10
2019-11-05 Perforation 3346.00 3346.50 8
2019-11-05 Multi-Stage Fracture 3346.00 3407.60 0
2019-10-28 Multi-Stage Fracture 4812.00 4873.60 0
2019-10-28 Perforation 4797.00 4797.50 16
2019-10-28 Perforation 4781.50 4782.00 12
2019-10-28 Perforation 4766.20 4766.70 14
2019-10-28 Perforation 4750.90 4751.40 10
2019-10-28 Perforation 4735.70 4736.20 10
2019-10-28 Perforation 4719.40 4719.90 8
2019-10-21 Perforation 4949.50 4950.00 12
2019-10-29 Multi-Stage Fracture 4719.40 4782.00 0
2019-10-29 Perforation 4705.40 4705.90 16
2019-10-29 Perforation 4689.90 4690.40 12
2019-10-29 Perforation 4674.60 4675.10 14
2019-10-29 Perforation 4659.30 4659.80 10
2019-10-29 Perforation 4644.00 4644.50 10
2019-10-29 Perforation 4628.80 4629.30 8
2019-10-29 Multi-Stage Fracture 4628.80 4690.40 0
2019-10-29 Perforation 4613.80 4614.30 16
2019-10-29 Perforation 4598.20 4598.70 12
2019-10-21 Perforation 4934.20 4934.70 12
2019-10-29 Perforation 4583.00 4583.50 14
2019-10-29 Perforation 4567.70 4568.20 10
2019-10-29 Perforation 4552.40 4552.90 10
2019-10-29 Perforation 4537.10 4537.60 8
2019-10-30 Multi-Stage Fracture 4537.10 4598.70 0
2019-10-30 Perforation 4522.10 4522.60 16
2019-10-30 Perforation 4506.60 4507.10 12
2019-10-30 Perforation 4491.30 4491.80 14
2019-10-30 Perforation 4476.10 4476.60 10
2019-10-30 Perforation 4460.80 4461.30 10
2019-10-21 Perforation 4918.90 4919.40 12
2019-10-30 Perforation 4445.50 4446.00 8
2019-10-31 Multi-Stage Fracture 4445.50 4507.10 0
2019-10-31 Perforation 4430.50 4431.00 16
2019-10-31 Perforation 4415.00 4415.50 12
2019-10-31 Perforation 4399.70 4400.20 14
2019-10-31 Perforation 4384.40 4384.90 10
2019-10-31 Perforation 4369.20 4369.70 10
2019-10-31 Perforation 4353.90 4354.40 8
2019-11-01 Multi-Stage Fracture 4353.90 4415.50 0
2019-11-01 Perforation 4338.90 4339.40 16
2019-10-21 Perforation 4903.60 4904.10 12
2019-11-01 Perforation 4323.30 4323.80 12
2019-11-01 Perforation 4308.10 4308.60 14
2019-11-01 Perforation 4292.80 4293.30 10
2019-11-01 Perforation 4277.50 4278.00 10
2019-11-01 Perforation 4262.30 4262.80 8
2019-11-01 Multi-Stage Fracture 4262.30 4323.80 0
2019-11-01 Perforation 4247.30 4247.80 16
2019-11-01 Perforation 4231.70 4232.20 12
2019-11-01 Perforation 4216.40 4216.90 14
2019-11-01 Perforation 4201.20 4201.70 10
2019-10-28 Multi-Stage Fracture 4903.60 4950.00 0
2019-11-01 Perforation 4185.90 4186.40 10
2019-11-01 Perforation 4170.60 4171.10 8
2019-11-01 Multi-Stage Fracture 4170.60 4232.20 0
2019-11-01 Perforation 4155.60 4156.10 16
2019-11-01 Perforation 4140.10 4140.60 12
2019-11-01 Perforation 4124.80 4125.30 14
2019-11-01 Perforation 4109.60 4110.10 10
2019-11-01 Perforation 4094.30 4094.80 10
2019-11-01 Perforation 4079.00 4079.50 8
2019-11-02 Multi-Stage Fracture 4079.00 4140.60 0
2019-10-28 Perforation 4888.60 4889.10 12
2019-11-02 Perforation 4064.00 4064.50 16
2019-11-02 Perforation 4048.50 4049.00 12
2019-11-02 Perforation 4033.20 4033.70 14
2019-11-02 Perforation 4017.90 4018.40 10
2019-11-02 Perforation 4002.70 4003.20 10
2019-11-02 Perforation 3987.40 3987.90 8
2019-11-02 Multi-Stage Fracture 3987.40 4049.00 0
2019-11-03 Perforation 3972.40 3972.90 16
2019-11-03 Perforation 3956.80 3957.30 12
2019-11-03 Perforation 3941.60 3942.10 14
2019-10-28 Perforation 4873.10 4873.60 10
2019-11-03 Perforation 3926.30 3926.80 10
2019-11-03 Perforation 3911.00 3911.50 10
2019-11-03 Perforation 3895.80 3896.30 8
2019-11-03 Multi-Stage Fracture 3895.80 3957.30 0
2019-11-03 Perforation 3880.80 3881.30 16
2019-11-03 Perforation 3865.20 3865.70 12
2019-11-03 Perforation 3849.90 3850.40 14
2019-11-03 Perforation 3834.70 3835.20 10
2019-11-03 Perforation 3819.40 3819.90 10
2019-11-03 Perforation 3804.10 3804.60 8
2019-10-28 Perforation 4857.80 4858.30 10
2019-11-03 Multi-Stage Fracture 3804.10 3865.70 0
2019-11-04 Perforation 3789.10 3789.60 16
2019-11-04 Perforation 3773.60 3774.10 12
2019-11-04 Perforation 3758.30 3758.80 14
2019-11-04 Perforation 3743.00 3743.50 10
2019-11-04 Perforation 3727.80 3728.30 10
2019-11-04 Perforation 3712.50 3713.00 8
2019-11-04 Multi-Stage Fracture 3712.50 3774.10 0
2019-11-04 Perforation 3697.50 3698.00 16
2019-11-04 Perforation 3682.00 3682.50 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-28 2019-11-05 3,092 36,419 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.1144 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.8316 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.712 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.1314 N/A
Water 7732-18-5 100 0.1314 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0081 N/A
Dibromoacetonitrile 3252-43-5 100 0.0081 N/A
Polyethylene Glycol 25322-68-3 100 0.0081 N/A
Sodium Bromide 7647-15-6 100 0.0081 N/A
Water 7732-18-5 100 0.0081 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0015 N/A
1-decanol 112-30-1 100 0.0015 N/A
1-octanol 111-87-5 100 0.0015 N/A
2-butoxy ethanol 111-76-2 100 0.0015 N/A
2-propanol 67-63-0 100 0.0015 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0015 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0015 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0015 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0015 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0015 N/A
Water 7732-18-5 100 0.0015 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
FraCare NE-04 BJ Services Demulsifier 2-Ethylhexanol 104-76-7 100 0.0011 N/A
Ethoxylated alcohol. branched 78330-19-5 100 0.0011 N/A
Ethoxylated alcohol. branched 78330-20-8 100 0.0011 N/A
Heavy Aromatic Naphtha 64742-94-5 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
Naphthalene 91-20-3 100 0.0011 N/A
Organic Sulfonic Acid 10638 100 0.0011 N/A
Oxyalkylated Polymer 10638 100 0.0011 N/A
Polyalkylene glycol 10638 100 0.0011 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.15 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.15 N/A
Lecitihins. soya 8030-76-0 100 0.15 N/A
polymer Trade Secret 100 0.15 N/A
Water 7732-18-5 100 0.15 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0023 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.021 N/A
Water 7732-18-5 100 0.021 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 626 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-27 Lost Circulation 2170.00 2180.00
2020-01-18 No Incident Encountered 0.00 0.00

For data sources see[9]

References