X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625191404002

Well Details

Well ID: 0625191404002
Loading map...
Location: 00/04-14-062-19W5/2
Location Alias: 00/04-14-62-19 W5M
Location Alias 2: 00/04-14-062-19 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ FOXCK 4-14-62-19
Operator Name: Chevron Canada Limited
License Number: 0490798
License Date: 2018-09-06
License Status: Amended
Spud Date: 2019-01-25
Final Drill Date: 2019-02-26
Well Total Depth: 6086.00 m
Surface Hole Latitude: 54.370362
Surface Hole Longitude: -116.787367

For data sources see[1][2]

Well History

Date Event
2018-09-06 Obtained License
2019-01-25 Surface Casing Operation Performed
2019-02-09 Direction Drilling Operation Performed - Deviate
2019-02-10 Direction Drilling Operation Performed - Horizontal
2019-02-16 Intermediate Casing Operation Performed
2019-02-26 Finished Drilling
2019-02-26 Well Mode changed to Drilled and Cased
2019-02-27 Well Log Performed
2019-03-01 Production Casing Operation Performed
2019-03-01 Rig Released
2019-05-18 Perforation Treatment Performed - Jet Perforation
2019-05-23 Perforation Treatment Performed - Jet Perforation
2019-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-24 Perforation Treatment Performed - Jet Perforation
2019-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-25 Perforation Treatment Performed - Jet Perforation
2019-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-26 Perforation Treatment Performed - Jet Perforation
2019-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-27 Perforation Treatment Performed - Jet Perforation
2019-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-28 Perforation Treatment Performed - Jet Perforation
2019-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-29 Perforation Treatment Performed - Jet Perforation
2019-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-30 Perforation Treatment Performed - Jet Perforation
2019-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-31 Perforation Treatment Performed - Jet Perforation
2019-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-01 Perforation Treatment Performed - Jet Perforation
2019-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-07 Well Log Performed
2019-07-24 Well Began Production
2019-07-24 Well Fluid changed to Shale Gas Only
2019-07-24 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-02-09 519.10 Deviate (5 - 79 degrees)
2019-02-10 2042.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-18 Perforation 5997.10 5997.60 12
2019-05-23 Perforation 5878.00 5878.50 10
2019-05-28 Perforation 4731.50 4732.00 10
2019-05-28 Perforation 4716.60 4717.10 8
2019-05-28 Perforation 4701.70 4702.20 8
2019-05-28 Perforation 4686.80 4687.30 8
2019-05-28 Multi-Stage Fracture 4685.80 4768.70 0
2019-05-28 Perforation 4671.90 4672.40 14
2019-05-28 Perforation 4656.00 4656.50 12
2019-05-28 Perforation 4642.10 4642.60 10
2019-05-28 Perforation 4627.20 4627.70 10
2019-05-28 Perforation 4612.30 4612.80 8
2019-05-23 Perforation 5863.10 5863.60 10
2019-05-28 Perforation 4597.50 4598.00 8
2019-05-28 Multi-Stage Fracture 4597.50 4679.30 0
2019-05-28 Perforation 4582.60 4583.10 12
2019-05-28 Perforation 4567.70 4568.20 12
2019-05-28 Perforation 4552.80 4553.30 10
2019-05-28 Perforation 4537.90 4538.40 10
2019-05-28 Perforation 4523.00 4523.50 8
2019-05-28 Perforation 4508.10 4508.60 8
2019-05-28 Multi-Stage Fracture 4508.10 4590.00 0
2019-05-28 Perforation 4493.20 4493.70 14
2019-05-23 Perforation 5848.20 5848.70 10
2019-05-28 Perforation 4478.30 4478.80 12
2019-05-28 Perforation 4463.40 4463.90 10
2019-05-28 Perforation 4448.60 4449.10 8
2019-05-28 Perforation 4433.70 4434.20 8
2019-05-28 Perforation 4418.80 4419.30 8
2019-05-29 Multi-Stage Fracture 4418.80 4500.70 0
2019-05-29 Perforation 4403.90 4404.40 14
2019-05-29 Perforation 4389.00 4389.50 12
2019-05-29 Perforation 4374.10 4374.60 10
2019-05-29 Perforation 4359.20 4359.70 10
2019-05-23 Multi-Stage Fracture 5848.20 5930.10 0
2019-05-29 Perforation 4344.30 4344.80 8
2019-05-29 Perforation 4329.40 4329.90 8
2019-05-29 Multi-Stage Fracture 4329.40 4411.30 0
2019-05-29 Perforation 4314.50 4315.00 20
2019-05-29 Perforation 4299.70 4300.20 20
2019-05-29 Perforation 4284.80 4285.30 20
2019-05-29 Perforation 4269.90 4270.40 20
2019-05-29 Perforation 4255.00 4255.50 20
2019-05-29 Perforation 4240.10 4240.60 20
2019-05-29 Multi-Stage Fracture 4240.10 4322.50 0
2019-05-24 Perforation 5833.30 5833.80 14
2019-05-29 Perforation 4225.20 4225.70 14
2019-05-29 Perforation 4210.30 4210.80 12
2019-05-29 Perforation 4195.40 4195.90 10
2019-05-29 Perforation 4180.50 4181.00 10
2019-05-29 Perforation 4164.60 4165.10 8
2019-05-29 Perforation 4150.80 4151.30 8
2019-05-29 Multi-Stage Fracture 4150.80 4225.70 0
2019-05-30 Perforation 4135.90 4136.40 12
2019-05-30 Perforation 4121.00 4121.50 12
2019-05-30 Perforation 4106.10 4106.60 10
2019-05-24 Perforation 5818.40 5818.90 10
2019-05-30 Perforation 4091.20 4091.70 8
2019-05-30 Perforation 4076.30 4076.80 8
2019-05-30 Perforation 4061.40 4061.90 8
2019-05-30 Multi-Stage Fracture 4061.40 4143.30 0
2019-05-30 Perforation 4046.50 4047.00 12
2019-05-30 Perforation 4031.60 4032.10 12
2019-05-30 Perforation 4016.70 4017.20 10
2019-05-30 Perforation 4001.90 4002.40 8
2019-05-30 Perforation 3987.00 3987.50 8
2019-05-30 Perforation 3972.10 3972.60 8
2019-05-24 Perforation 5803.50 5804.00 10
2019-05-30 Multi-Stage Fracture 3972.10 4054.00 0
2019-05-30 Perforation 3957.20 3957.70 12
2019-05-30 Perforation 3942.30 3942.80 12
2019-05-30 Perforation 3927.40 3927.90 10
2019-05-30 Perforation 3912.50 3913.00 8
2019-05-30 Perforation 3897.60 3898.10 8
2019-05-30 Perforation 3882.70 3883.20 8
2019-05-30 Multi-Stage Fracture 3882.70 3957.70 0
2019-05-30 Perforation 3867.80 3868.30 12
2019-05-30 Perforation 3853.00 3853.50 12
2019-05-24 Perforation 5788.70 5789.20 8
2019-05-30 Perforation 3838.10 3838.60 10
2019-05-30 Perforation 3823.20 3823.70 8
2019-05-30 Perforation 3808.30 3808.80 8
2019-05-30 Perforation 3793.40 3793.90 8
2019-05-31 Multi-Stage Fracture 3793.40 3875.80 0
2019-05-31 Perforation 3778.50 3779.00 12
2019-05-31 Perforation 3763.60 3764.10 12
2019-05-31 Perforation 3747.70 3748.20 10
2019-05-31 Perforation 3733.80 3734.30 8
2019-05-31 Perforation 3718.90 3719.40 8
2019-05-24 Perforation 5773.80 5774.30 8
2019-05-31 Perforation 3704.00 3704.50 8
2019-05-31 Multi-Stage Fracture 3704.00 3785.90 0
2019-05-31 Perforation 3689.20 3689.70 12
2019-05-31 Perforation 3674.30 3674.80 12
2019-05-31 Perforation 3659.40 3659.90 10
2019-05-31 Perforation 3644.50 3645.00 8
2019-05-31 Perforation 3629.60 3630.10 8
2019-05-31 Perforation 3614.70 3615.20 8
2019-05-31 Multi-Stage Fracture 3614.70 3697.90 0
2019-05-31 Perforation 3599.80 3600.30 12
2019-05-24 Perforation 5758.90 5759.40 8
2019-05-31 Perforation 3584.90 3585.40 12
2019-05-31 Perforation 3570.00 3570.50 10
2019-05-31 Perforation 3555.20 3555.70 8
2019-05-31 Perforation 3540.30 3540.80 8
2019-05-31 Perforation 3525.40 3525.90 8
2019-05-31 Multi-Stage Fracture 3525.40 3607.30 0
2019-06-01 Perforation 3510.50 3511.00 20
2019-06-01 Perforation 3495.60 3496.10 20
2019-06-01 Perforation 3480.70 3481.20 20
2019-06-01 Perforation 3465.80 3466.30 20
2019-05-18 Perforation 5982.20 5982.70 12
2019-05-24 Multi-Stage Fracture 5758.90 5840.80 0
2019-06-01 Perforation 3450.90 3451.40 20
2019-06-01 Perforation 3436.00 3436.50 20
2019-06-01 Multi-Stage Fracture 3436.00 3517.90 0
2019-05-24 Perforation 5744.00 5744.50 14
2019-05-24 Perforation 5728.10 5728.60 10
2019-05-24 Perforation 5714.20 5714.70 10
2019-05-24 Perforation 5699.30 5699.80 8
2019-05-24 Perforation 5684.40 5684.90 8
2019-05-24 Perforation 5669.50 5670.00 8
2019-05-24 Multi-Stage Fracture 5669.50 5751.40 0
2019-05-25 Perforation 5654.60 5655.10 14
2019-05-25 Perforation 5639.80 5640.30 10
2019-05-18 Perforation 5967.30 5967.80 12
2019-05-25 Perforation 5624.90 5625.40 10
2019-05-25 Perforation 5610.00 5610.50 8
2019-05-25 Perforation 5595.10 5595.60 8
2019-05-25 Perforation 5580.20 5580.70 8
2019-05-25 Multi-Stage Fracture 5580.20 5662.10 0
2019-05-25 Perforation 5565.30 5565.80 14
2019-05-25 Perforation 5550.40 5550.90 10
2019-05-25 Perforation 5534.50 5535.00 10
2019-05-25 Perforation 5519.60 5520.10 8
2019-05-25 Perforation 5505.70 5506.20 8
2019-05-18 Perforation 5952.40 5952.90 12
2019-05-25 Perforation 5490.90 5491.40 8
2019-05-25 Multi-Stage Fracture 5490.90 5572.70 0
2019-05-25 Perforation 5476.00 5476.50 12
2019-05-25 Perforation 5461.10 5461.60 12
2019-05-25 Perforation 5446.20 5446.70 10
2019-05-25 Perforation 5431.30 5431.80 8
2019-05-25 Perforation 5416.40 5416.90 8
2019-05-25 Perforation 5401.50 5402.00 8
2019-05-25 Multi-Stage Fracture 5401.50 5483.40 0
2019-05-26 Perforation 5386.60 5387.10 12
2019-05-18 Perforation 5937.60 5938.10 12
2019-05-26 Perforation 5371.70 5372.20 12
2019-05-26 Perforation 5356.80 5357.30 10
2019-05-26 Perforation 5342.00 5342.50 8
2019-05-26 Perforation 5327.10 5327.60 8
2019-05-26 Perforation 5312.20 5312.70 8
2019-05-26 Multi-Stage Fracture 5312.20 5394.10 0
2019-05-26 Perforation 5297.30 5297.80 12
2019-05-26 Perforation 5282.40 5282.90 12
2019-05-26 Perforation 5267.50 5268.00 10
2019-05-26 Perforation 5252.60 5253.10 8
2019-05-23 Multi-Stage Fracture 5937.80 5997.10 0
2019-05-26 Perforation 5237.70 5238.20 8
2019-05-26 Perforation 5221.40 5221.90 8
2019-05-26 Multi-Stage Fracture 5221.80 5305.70 0
2019-05-26 Perforation 5207.90 5208.40 12
2019-05-26 Perforation 5192.10 5192.60 12
2019-05-26 Perforation 5178.20 5178.70 10
2019-05-26 Perforation 5163.30 5163.80 8
2019-05-26 Perforation 5148.40 5148.90 8
2019-05-26 Perforation 5133.50 5134.00 8
2019-05-26 Multi-Stage Fracture 5133.50 5215.40 0
2019-05-23 Perforation 5922.70 5923.20 10
2019-05-26 Perforation 5118.60 5119.10 12
2019-05-26 Perforation 5103.70 5104.20 12
2019-05-26 Perforation 5088.80 5089.30 10
2019-05-26 Perforation 5073.90 5074.40 8
2019-05-26 Perforation 5059.00 5059.50 8
2019-05-26 Perforation 5044.20 5044.70 8
2019-05-27 Multi-Stage Fracture 5044.20 5126.50 0
2019-05-27 Perforation 5029.30 5029.80 12
2019-05-27 Perforation 5014.40 5014.90 12
2019-05-27 Perforation 4999.50 5000.00 10
2019-05-23 Perforation 5907.80 5908.30 10
2019-05-27 Perforation 4983.60 4984.10 8
2019-05-27 Perforation 4969.70 4970.20 8
2019-05-27 Perforation 4954.80 4955.30 8
2019-05-27 Multi-Stage Fracture 4954.80 5036.70 0
2019-05-27 Perforation 4939.90 4940.40 12
2019-05-27 Perforation 4925.00 4925.50 12
2019-05-27 Perforation 4910.10 4910.60 10
2019-05-27 Perforation 4895.30 4895.80 8
2019-05-27 Perforation 4880.40 4880.90 8
2019-05-27 Perforation 4865.50 4866.00 8
2019-05-23 Perforation 5892.90 5893.40 10
2019-05-27 Multi-Stage Fracture 4865.60 4947.40 0
2019-05-27 Perforation 4850.60 4851.10 12
2019-05-27 Perforation 4835.70 4836.20 12
2019-05-27 Perforation 4820.80 4821.30 10
2019-05-27 Perforation 4805.90 4806.40 8
2019-05-27 Perforation 4791.00 4791.50 8
2019-05-27 Perforation 4776.10 4776.60 8
2019-05-27 Multi-Stage Fracture 4776.10 4858.00 0
2019-05-28 Perforation 4761.20 4761.70 12
2019-05-28 Perforation 4746.40 4746.90 12

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-23 2019-06-01 3,049 62,448 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.8461 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.2407 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.5392 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.1298 N/A
Water 7732-18-5 100 0.1298 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0085 N/A
Dibromoacetonitrile 3252-43-5 100 0.0085 N/A
Polyethylene Glycol 25322-68-3 100 0.0085 N/A
Sodium Bromide 7647-15-6 100 0.0085 N/A
Water 7732-18-5 100 0.0085 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0331 N/A
Methanol 67-56-1 100 0.0331 N/A
Non-hazardous Not Available 100 0.0331 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0014 N/A
1-decanol 112-30-1 100 0.0014 N/A
1-octanol 111-87-5 100 0.0014 N/A
2-butoxy ethanol 111-76-2 100 0.0014 N/A
2-propanol 67-63-0 100 0.0014 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0014 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0014 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0014 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0014 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0014 N/A
Water 7732-18-5 100 0.0014 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier 2-Ethylhexanol 104-76-7 100 0.0011 N/A
Ethoxylated alcohol. branched 78330-19-5 100 0.0011 N/A
Ethoxylated alcohol. branched 78330-20-8 100 0.0011 N/A
Heavy Aromatic Naphtha 64742-94-5 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
Naphthalene 91-20-3 100 0.0011 N/A
Organic Sulfonic Acid 10638 100 0.0011 N/A
Oxyalkylated Polymer 10638 100 0.0011 N/A
Polyalkylene glycol 10638 100 0.0011 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1501 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1501 N/A
Lecitihins. soya 8030-76-0 100 0.1501 N/A
polymer Trade Secret 100 0.1501 N/A
Water 7732-18-5 100 0.1501 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0022 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.021 N/A
Water 7732-18-5 100 0.021 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-05-22 2019-05-31 Groundwater - Non-saline less than or equal to 150m deep 1453
2019-05-22 2019-05-31 Groundwater - Non-saline less than or equal to 150m deep 1119
2018-06-06 2018-06-19 Surface Water - River 59422

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1520 0.0 0.0 0.0
2020 2109 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-26 No Incident Encountered 0.00 0.00
2019-06-04 No Incident Encountered 0.00 0.00
2019-06-07 No Incident Encountered 0.00 0.00

For data sources see[9]

References