X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625190804000

Well Details

Well ID: 0625190804000
Loading map...
Location: 00/04-08-062-19W5/0
Location Alias: 00/04-08-62-19 W5M
Location Alias 2: 00/04-08-062-19 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL HZ KAYBOBS 4-8-62-19
Operator Name: Shell Canada Limited
License Number: 0469272
License Date: 2014-08-21
License Status: Issued
Spud Date: 2014-11-03
Final Drill Date: 2015-01-22
Well Total Depth: 4603.00 m
Surface Hole Latitude: 54.358060
Surface Hole Longitude: -116.823987

For data sources see[1][2]

Well History

Date Event
2014-08-21 Obtained License
2014-11-06 Surface Casing Operation Performed
2014-11-15 Intermediate Casing Operation Performed
2014-11-20 Well Log Performed
2015-01-13 Direction Drilling Operation Performed - Deviate
2015-01-19 Direction Drilling Operation Performed - Horizontal
2015-01-22 Finished Drilling
2015-01-22 Well Log Performed
2015-01-22 Well Mode changed to Drilled and Cased
2015-01-24 Well Log Performed
2015-01-25 Production Casing Operation Performed
2015-01-28 Rig Released
2015-03-06 Perforation Treatment Performed - Jet Perforation
2015-03-10 Perforation Treatment Performed - Fractured
2015-03-10 Perforation Treatment Performed - Jet Perforation
2015-03-11 Perforation Treatment Performed - Fractured
2015-03-11 Perforation Treatment Performed - Jet Perforation
2015-03-12 Perforation Treatment Performed - Fractured
2015-03-12 Perforation Treatment Performed - Jet Perforation
2015-03-13 Perforation Treatment Performed - Fractured
2015-03-13 Perforation Treatment Performed - Jet Perforation
2015-03-14 Perforation Treatment Performed - Fractured
2015-03-15 Perforation Treatment Performed - Fractured
2015-03-15 Perforation Treatment Performed - Jet Perforation
2015-03-16 Perforation Treatment Performed - Fractured
2015-03-16 Perforation Treatment Performed - Jet Perforation
2015-03-17 Perforation Treatment Performed - Fractured
2015-03-17 Perforation Treatment Performed - Jet Perforation
2015-03-18 Perforation Treatment Performed - Fractured
2015-03-18 Perforation Treatment Performed - Jet Perforation
2015-03-19 Perforation Treatment Performed - Fractured
2015-03-19 Perforation Treatment Performed - Jet Perforation
2015-03-20 Perforation Treatment Performed - Fractured
2015-03-20 Perforation Treatment Performed - Jet Perforation
2015-03-22 Perforation Treatment Performed - Fractured
2015-03-22 Perforation Treatment Performed - Jet Perforation
2015-03-23 Perforation Treatment Performed - Fractured
2015-03-23 Perforation Treatment Performed - Jet Perforation
2015-03-23 Well Log Performed
2015-03-24 Perforation Treatment Performed - Fractured
2015-04-09 Well Began Production
2015-04-09 Well Fluid changed to Shale Gas Only
2015-04-09 Well Mode changed to Flowing
2016-01-13 Well Fluid changed to Shale Gas Only
2016-01-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-03 Nabors Drilling Limited C078 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-13 2624.50 Deviate (5 - 79 degrees)
2015-01-19 3294.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-06 Perforation 4535.20 4535.60 20
2015-03-10 Perforation 4415.00 4415.30 20
2015-03-10 Perforation 4400.00 4400.20 20
2015-03-11 Fracture 4400.00 4460.50 0
2015-03-11 Perforation 4385.00 4385.50 20
2015-03-11 Perforation 4370.00 4370.40 20
2015-03-11 Perforation 4355.00 4355.50 20
2015-03-11 Perforation 4340.00 4340.30 20
2015-03-11 Perforation 4325.00 4325.20 20
2015-03-12 Fracture 4325.00 4385.50 0
2015-03-12 Perforation 4310.00 4310.50 20
2015-03-06 Perforation 4520.00 4520.40 20
2015-03-12 Perforation 4295.00 4295.40 20
2015-03-12 Perforation 4280.00 4280.40 20
2015-03-12 Perforation 4265.00 4265.30 20
2015-03-12 Perforation 4250.00 4250.20 20
2015-03-13 Fracture 4250.00 4310.50 0
2015-03-13 Perforation 4235.00 4235.50 20
2015-03-13 Perforation 4220.00 4220.40 20
2015-03-13 Perforation 4205.00 4205.40 20
2015-03-13 Perforation 4190.00 4190.30 20
2015-03-13 Perforation 4177.00 4177.20 20
2015-03-06 Perforation 4505.00 4505.40 20
2015-03-14 Fracture 4177.00 4235.50 0
2015-03-15 Perforation 4160.00 4160.50 20
2015-03-15 Perforation 4144.00 4144.40 20
2015-03-15 Perforation 4130.00 4130.40 20
2015-03-15 Perforation 4115.00 4115.30 20
2015-03-15 Perforation 4100.00 4100.20 20
2015-03-15 Fracture 4100.00 4160.50 0
2015-03-16 Perforation 4085.00 4085.50 20
2015-03-16 Perforation 4070.00 4070.40 20
2015-03-16 Perforation 4055.00 4055.40 20
2015-03-06 Perforation 4490.00 4490.30 20
2015-03-16 Perforation 4040.00 4040.30 20
2015-03-16 Perforation 4025.00 4025.20 20
2015-03-16 Fracture 4025.00 4085.50 0
2015-03-16 Perforation 4010.00 4010.50 20
2015-03-16 Perforation 3995.00 3995.40 20
2015-03-16 Perforation 3980.00 3980.40 20
2015-03-16 Perforation 3965.00 3965.30 20
2015-03-16 Perforation 3950.00 3950.20 20
2015-03-17 Fracture 3950.00 4010.50 0
2015-03-17 Perforation 3935.00 3935.50 20
2015-03-06 Perforation 4475.00 4475.20 20
2015-03-17 Perforation 3919.00 3919.40 20
2015-03-17 Perforation 3907.00 3907.40 20
2015-03-17 Perforation 3889.00 3889.30 20
2015-03-17 Perforation 3875.00 3875.20 20
2015-03-18 Fracture 3875.00 3935.50 0
2015-03-18 Perforation 3860.00 3860.50 20
2015-03-18 Perforation 3845.00 3845.40 20
2015-03-18 Perforation 3830.00 3830.40 20
2015-03-18 Perforation 3815.00 3815.30 20
2015-03-18 Perforation 3800.00 3800.20 20
2015-03-10 Fracture 4475.00 4535.60 0
2015-03-18 Fracture 3800.00 3860.50 0
2015-03-18 Perforation 3785.00 3785.50 20
2015-03-18 Perforation 3770.00 3770.40 20
2015-03-18 Perforation 3755.00 3755.40 20
2015-03-18 Perforation 3740.00 3740.30 20
2015-03-18 Perforation 3725.00 3725.20 20
2015-03-19 Fracture 3725.00 3785.50 0
2015-03-19 Perforation 3710.00 3710.50 20
2015-03-19 Perforation 3695.00 3695.40 20
2015-03-19 Perforation 3681.00 3681.40 20
2015-03-10 Perforation 4460.00 4460.50 20
2015-03-19 Perforation 3666.00 3666.50 20
2015-03-19 Perforation 3649.00 3649.20 20
2015-03-20 Fracture 3649.00 3710.50 0
2015-03-20 Perforation 3635.00 3635.50 20
2015-03-20 Perforation 3620.00 3620.40 20
2015-03-20 Perforation 3605.00 3605.40 20
2015-03-20 Perforation 3590.00 3590.30 20
2015-03-20 Perforation 3575.00 3575.20 20
2015-03-22 Fracture 3575.00 3635.50 0
2015-03-22 Perforation 3560.00 3560.50 20
2015-03-10 Perforation 4445.00 4445.40 20
2015-03-22 Perforation 3546.00 3546.40 20
2015-03-22 Perforation 3529.00 3529.40 20
2015-03-22 Perforation 3515.00 3515.30 20
2015-03-22 Perforation 3500.00 3500.20 20
2015-03-22 Fracture 3500.00 3560.50 0
2015-03-23 Perforation 3484.00 3484.50 20
2015-03-23 Perforation 3470.00 3470.40 20
2015-03-23 Perforation 3455.00 3455.40 20
2015-03-23 Perforation 3440.00 3440.30 20
2015-03-23 Perforation 3425.00 3425.20 20
2015-03-10 Perforation 4430.00 4430.40 20
2015-03-23 Fracture 3425.00 3484.50 0
2015-03-23 Perforation 3410.00 3410.50 20
2015-03-23 Perforation 3395.00 3395.40 20
2015-03-23 Perforation 3380.00 3380.40 20
2015-03-23 Perforation 3365.00 3365.30 20
2015-03-23 Perforation 3348.00 3348.20 20
2015-03-24 Fracture 3348.00 3410.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-10 2015-03-24 3,131 310 N/A
2 2015-03-22 2015-03-22 3,131 0 N/A
3 2015-03-14 2015-03-24 3,131 0 N/A
4 2015-03-10 2015-03-13 3,131 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 90.6471 N/A
Hydrochloric acid 7647-01-0 100 1.1417 N/A
Water 7732-18-5 100 1.1417 N/A
SAND - COMMON WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 1.7412 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 5.6021 N/A
MC B-8510 Halliburton Bactericide/Biocide 2.2-Dibromo-3-dinitrilopropionamide 10222-01-2 100 0.0079 N/A
Dibromacetonitrile 3252-43-5 100 0.0079 N/A
Inert ingredient Not Available 100 0.0079 N/A
Proprietary ingredient Trade Secret 100 0.0079 N/A
Sodium bromide 7647-15-6 100 0.0079 N/A
OPTIFLO-III DELAYED RELEASE BREAKER Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.001 N/A
Crystalline silica. quartz 14808-60-7 100 0.001 N/A
Proprietary ingredient(s) Trade Secret 100 0.01 N/A
MO-67 Halliburton Buffer Inert ingredient(s) Not Available 100 0.0139 N/A
Sodium chloride 7647-14-5 100 0.0139 N/A
Sodium hydroxide 1310-73-2 100 0.0139 N/A
CL-22 UC Halliburton Crosslinker Inert ingredient(s) Not Available 100 0.01 N/A
Potassium formate 590-29-4 100 0.0105 N/A
Proprietary ingredient(s) Trade Secret 100 0.0105 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0528 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0528 N/A
Inert ingredient(s) Not Available 100 0.0528 N/A
Proprietary ingredient(s) Trade Secret 100 0.0543 N/A
Sodium chloride 7647-14-5 100 0.0528 N/A
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.0101 N/A
MX 2-2822 Halliburton Scale Inhibitor Inert ingredient Not Available 100 0 N/A
Methyl alcohol 67-56-1 100 0.0117 N/A
Phosphonate of a Diamine. Sodium Salt Not Available 100 0.0117 N/A
2 CERAMIC PROP Halliburton Crystalline silica. cristobalite 14464-46-1 100 0.891 N/A
Mullite 1302-93-8 100 0.891 N/A
Silica. amorphous - fumed 7631-86-9 100 0.891 N/A
3 SAND - CRC - 30/50. BULK. SK (101822155) Halliburton Crystalline silica. cristobalite 14464-46-1 100 1.2506 N/A
4 SAND - CRC - 40/70. BULK. SK (101822155) Halliburton Crystalline silica. quartz 14808-60-7 100 0.5966 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-09 2015-03-24 Surface Water - Lake 26840

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5532 0.0 0.0 0.0
2016 8062 0.0 0.0 0.0
2017 7345 0.0 0.0 0.0
2018 8045 0.0 0.0 0.0
2019 7294 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-28 No Incident Encountered 0.00 0.00
2015-04-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References