X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625182501002

Well Details

Well ID: 0625182501002
Loading map...
Location: 00/01-25-062-18W5/2
Location Alias: 00/01-25-62-18 W5M
Location Alias 2: 00/01-25-062-18 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 18
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY FOXCK 1-25-62-18
Operator Name: Paramount Resources Ltd.
License Number: 0156851
License Date: 1993-02-26
License Status: Abandoned
Spud Date: 1993-02-26
Final Drill Date: 1993-03-10
Well Total Depth: 1998.00 m
Surface Hole Latitude: 54.385198
Surface Hole Longitude: -116.556794

For data sources see[1][2]

Well History

Date Event
1993-02-26 Obtained License
1993-02-28 Surface Casing Operation Performed
1993-03-03 Direction Drilling Operation Performed - Deviate
1993-03-10 Finished Drilling
1993-03-10 Well Mode changed to Drilled and Cased
1993-03-11 Well Log Performed
1993-03-14 Drill Stem Test Performed
1993-03-16 Production Casing Operation Performed
1993-03-16 Rig Released
1993-03-21 Perforation Treatment Performed - Jet Perforation
1993-03-21 Well Log Performed
1993-03-24 Well Log Performed
1993-04-01 Well Began Production
1993-04-01 Well Fluid changed to Gas
1993-04-01 Well Mode changed to Flowing
1994-06-04 Well Log Performed
1994-06-07 Perforation Treatment Performed - Fractured
2008-10-22 Well Fluid changed to Gas
2008-10-22 Well Mode changed to Suspended
2019-02-14 Well Log Performed
2019-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-15 Perforation Treatment Performed - Jet Perforation
2019-02-15 Plug Back Performed
2019-02-15 Well Log Performed
2019-02-16 Perforation Treatment Performed - Cement Plug
2019-02-16 Perforation Treatment Performed - Cement Squeeze
2019-02-16 Plug Back Performed
2019-02-17 Perforation Treatment Performed - Jet Perforation
2019-02-17 Well Log Performed
2019-02-18 Perforation Treatment Performed - Cement Plug
2019-02-18 Perforation Treatment Performed - Cement Squeeze
2019-02-18 Plug Back Performed
2019-02-18 Well Fluid changed to Gas
2019-02-18 Well Mode changed to Abandoned Zone
2019-03-18 Well Abandoned
2019-03-18 Well Fluid changed to Gas
2019-03-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-03 1085.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-21 Perforation 1925.00 1944.50 13
2019-02-18 Cement Plug 330.00 340.00 0
1993-03-21 Perforation 1952.00 1963.00 13
1994-06-07 Fracture 1925.00 1944.50 0
2019-02-15 Packing Device Capped w/Cement 1904.00 1914.00 0
2019-02-15 Perforation 613.00 614.00 20
2019-02-16 Cement Squeeze 613.00 614.00 0
2019-02-16 Cement Plug 603.00 613.00 0
2019-02-17 Perforation 350.00 351.00 20
2019-02-18 Cement Squeeze 350.00 351.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6356 0.0 0.0 0.0
1994 4677 0.0 0.0 0.0
1995 4700 0.0 0.0 0.0
1997 2360 0.0 0.0 0.0
1998 6717 0.0 0.0 0.0
1999 7712 0.0 0.0 0.0
2000 8183 0.0 0.0 0.0
2001 8667 0.0 0.0 0.0
2002 8710 0.0 0.0 0.0
2003 8486 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8758 0.0 0.0 0.0
2006 8443 0.0 0.0 0.0
2007 5670 0.0 0.0 0.0
2008 1 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References