If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625102309003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.3773,"lon":-115.400666,"icon":""}]} |
Location: 00/09-23-062-10W5/3 | |
Location Alias: 00/09-23-62-10 W5M | |
Location Alias 2: 00/09-23-062-10 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 10 | |
Section: 23 | |
County/Municipality: Woodlands County | |
Well Name: CPEC CARIBOU 5-23-62-10 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0441336 | |
License Date: 2011-12-15 | |
License Status: Suspension | |
Spud Date: 2011-12-21 | |
Final Drill Date: 2012-02-03 | |
Well Total Depth: 3736.00 m | |
Surface Hole Latitude: 54.377300 | |
Surface Hole Longitude: -115.400666 |
Date | Event |
---|---|
2011-11-23 | Surface Casing Operation Performed |
2011-12-15 | Obtained License |
2012-01-18 | Direction Drilling Operation Performed - Deviate |
2012-01-20 | Well Log Performed |
2012-01-25 | Direction Drilling Operation Performed - Horizontal |
2012-01-28 | Intermediate Casing Operation Performed |
2012-02-03 | Finished Drilling |
2012-02-03 | Well Mode changed to Drilled and Cased |
2012-02-04 | Well Began Production |
2012-02-04 | Well Fluid changed to Crude Oil |
2012-02-04 | Well Mode changed to Pumping |
2012-02-05 | Rig Released |
2012-02-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-18 | 2129.40 | Deviate (5 - 79 degrees) |
2012-01-25 | 2631.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-17 | Open Hole/Barefoot Completion | 2631.00 | 3736.00 | 0 |
2012-02-20 | Acid Treatment | 3565.00 | 3625.00 | 0 |
2012-02-20 | Acid Treatment | 3385.00 | 3445.00 | 0 |
2012-02-21 | Acid Treatment | 3140.00 | 3205.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3863 | 0.0 | 0.0 | 0.0 |
2013 | 4281 | 0.0 | 0.0 | 0.0 |
2014 | 5473 | 0.0 | 0.0 | 0.0 |
2015 | 1239 | 0.0 | 0.0 | 0.0 |
2016 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[6]