If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625101701002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.370509,"lon":-115.475631,"icon":""}]} |
Location: 00/01-17-062-10W5/2 | |
Location Alias: 00/01-17-62-10 W5M | |
Location Alias 2: 00/01-17-062-10 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 10 | |
Section: 17 | |
County/Municipality: Woodlands County | |
Well Name: CPEC CARIBOU 4-20-62-10 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0441941 | |
License Date: 2011-12-22 | |
License Status: Suspension | |
Spud Date: 2011-12-30 | |
Final Drill Date: 2012-01-28 | |
Well Total Depth: 4372.00 m | |
Surface Hole Latitude: 54.370509 | |
Surface Hole Longitude: -115.475631 |
Date | Event |
---|---|
2011-12-22 | Obtained License |
2012-01-14 | Direction Drilling Operation Performed - Deviate |
2012-01-17 | Direction Drilling Operation Performed - Horizontal |
2012-01-20 | Intermediate Casing Operation Performed |
2012-01-28 | Finished Drilling |
2012-01-28 | Well Mode changed to Drilled and Cased |
2012-01-31 | Liner Casing Operation Performed |
2012-02-01 | Well Began Production |
2012-02-01 | Well Fluid changed to Crude Oil |
2012-02-01 | Well Mode changed to Pumping |
2012-02-02 | Rig Released |
2012-02-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-09 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-14 | 2237.50 | Deviate (5 - 79 degrees) |
2012-01-17 | 2707.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-09 | Multi-Stage Fracture | 2816.90 | 2817.00 | 0 |
2012-02-09 | Multi-Stage Fracture | 3803.90 | 3804.00 | 0 |
2012-02-09 | Multi-Stage Fracture | 3910.30 | 3910.40 | 0 |
2012-02-09 | Multi-Stage Fracture | 4019.20 | 4019.30 | 0 |
2012-02-09 | Multi-Stage Fracture | 4126.80 | 4126.90 | 0 |
2012-02-09 | Multi-Stage Fracture | 4236.30 | 4236.40 | 0 |
2012-02-09 | Multi-Stage Fracture | 4345.00 | 4345.10 | 0 |
2012-02-09 | Open Hole/Barefoot Completion | 4350.00 | 4372.00 | 0 |
2012-02-09 | Multi-Stage Fracture | 2930.40 | 2930.50 | 0 |
2012-02-09 | Multi-Stage Fracture | 3036.50 | 3036.60 | 0 |
2012-02-09 | Multi-Stage Fracture | 3151.70 | 3151.80 | 0 |
2012-02-09 | Multi-Stage Fracture | 3260.10 | 3260.20 | 0 |
2012-02-09 | Multi-Stage Fracture | 3369.00 | 3369.10 | 0 |
2012-02-09 | Multi-Stage Fracture | 3478.60 | 3478.70 | 0 |
2012-02-09 | Multi-Stage Fracture | 3587.40 | 3587.50 | 0 |
2012-02-09 | Multi-Stage Fracture | 3695.40 | 3695.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6499 | 0.0 | 0.0 | 0.0 |
2013 | 7099 | 0.0 | 0.0 | 0.0 |
2014 | 5214 | 0.0 | 0.0 | 0.0 |
2015 | 4159 | 0.0 | 0.0 | 0.0 |
2016 | 262 | 0.0 | 0.0 | 0.0 |
For data sources see[6]