If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625101512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.35549,"lon":-115.425681,"icon":""}]} |
Location: 00/12-15-062-10W5/0 | |
Location Alias: 00/12-15-62-10 W5M | |
Location Alias 2: 00/12-15-062-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 10 | |
Section: 15 | |
County/Municipality: Woodlands County | |
Well Name: CPEC CARIBOU 12-15-62-10 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0420096 | |
License Date: 2010-04-27 | |
License Status: Suspension | |
Spud Date: 2010-07-06 | |
Final Drill Date: 2010-07-19 | |
Well Total Depth: 2550.00 m | |
Surface Hole Latitude: 54.355490 | |
Surface Hole Longitude: -115.425681 |
Date | Event |
---|---|
2010-04-27 | Obtained License |
2010-07-07 | Surface Casing Operation Performed |
2010-07-08 | Direction Drilling Operation Performed - Deviate |
2010-07-10 | Direction Drilling Operation Performed - Horizontal |
2010-07-12 | Intermediate Casing Operation Performed |
2010-07-12 | Well Log Performed |
2010-07-18 | Liner Casing Operation Performed |
2010-07-19 | Finished Drilling |
2010-07-19 | Rig Released |
2010-07-19 | Well Mode changed to Drilled and Cased |
2010-08-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-08-14 | Well Log Performed |
2010-08-19 | Well Began Production |
2010-08-19 | Well Fluid changed to Crude Oil |
2010-08-19 | Well Mode changed to Pumping |
2015-07-01 | Well Fluid changed to Crude Oil |
2015-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-07-08 | 1193.70 | Deviate (5 - 79 degrees) |
2010-07-10 | 1683.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-06 | Hydra Jet Perforation | 2498.00 | 2500.00 | 17 |
2010-08-06 | Hydra Jet Perforation | 2488.00 | 2490.00 | 17 |
2010-08-06 | Hydra Jet Perforation | 2358.00 | 2360.00 | 17 |
2010-08-06 | Hydra Jet Perforation | 2098.00 | 2100.00 | 17 |
2010-08-06 | Hydra Jet Perforation | 1858.00 | 1860.00 | 17 |
2010-08-06 | Hydra Jet Perforation | 1755.00 | 1757.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2779 | 0.0 | 0.0 | 0.0 |
2011 | 6371 | 0.0 | 0.0 | 0.0 |
2012 | 3862 | 0.0 | 0.0 | 0.0 |
For data sources see[6]