X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624250810000

Well Details

Well ID: 0624250810000
Loading map...
Location: 00/10-08-062-25W4/0
Location Alias: 00/10-08-62-25 W4M
Location Alias 2: 00/10-08-062-25 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 25
Section: 08
County/Municipality: Westlock County
Well Name: DORSET HOME DAPP 10-8-62-25
Operator Name: Baytex Energy Ltd.
License Number: 0047346
License Date: 1973-09-21
License Status: RecCertified
Spud Date: 1973-09-28
Final Drill Date: 1973-10-03
Well Total Depth: 976.60 m
Surface Hole Latitude: 54.351002
Surface Hole Longitude: -113.707872

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-09-21 Obtained License
1973-09-30 Drill Stem Test Performed
1973-10-01 Drill Stem Test Performed
1973-10-02 Drill Stem Test Performed
1973-10-03 Finished Drilling
1973-10-03 Well Mode changed to Drilled and Cased
1973-10-05 Production Casing Operation Performed
1973-12-05 Perforation Treatment Performed - Jet Perforation
1973-12-06 Perforation Treatment Performed - Jet Perforation
1973-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-08 Perforation Treatment Performed - Jet Perforation
1973-12-12 Perforation Treatment Performed - Cement Squeeze
1973-12-13 Perforation Treatment Performed - Jet Perforation
1976-02-18 Well Began Production
1976-02-18 Well Fluid changed to Gas
1976-02-18 Well Mode changed to Flowing
1976-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-12-08 Perforation Treatment Performed - Jet Perforation
1976-12-09 Perforation Treatment Performed - Jet Perforation
1976-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-15 Well Fluid changed to Gas
1976-12-15 Well Mode changed to Suspended
1983-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-10 Well Abandoned
1983-10-10 Well Fluid changed to Gas
1983-10-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-12-05 Perforation 874.20 875.40 7
1976-12-09 Perforation 653.50 654.70 7
1976-12-10 Acid Treatment 653.50 677.00 0
1976-12-12 Acid Treatment 653.50 677.00 0
1983-10-10 Packing Device Capped w/Cement 641.00 649.00 0
1973-12-06 Perforation 875.40 876.60 7
1973-12-07 Acid Treatment 874.20 876.60 0
1973-12-08 Perforation 888.50 889.70 7
1973-12-12 Cement Squeeze 874.20 876.60 0
1973-12-13 Perforation 874.20 876.60 7
1976-12-08 Packing Device Capped w/Cement 868.70 868.70 0
1976-12-08 Perforation 676.40 677.00 7
1976-12-09 Perforation 660.20 662.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5234 0.0 0.0 0.0

For data sources see[5]

References