X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624171716000

Well Details

Well ID: 0624171716000
Loading map...
Location: 00/16-17-062-17W4/0
Location Alias: 00/16-17-62-17 W4M
Location Alias 2: 00/16-17-062-17 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 17
Section: 17
County/Municipality: Smoky Lake County
Well Name: CONOCO FIGURELK 16-17-62-17
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0132389
License Date: 1988-02-19
License Status: RecCertified
Spud Date: 1988-02-29
Final Drill Date: 1988-03-02
Well Total Depth: 692.00 m
Surface Hole Latitude: 54.366931
Surface Hole Longitude: -112.506387

For data sources see[1][2]

Well History

Date Event
1988-02-19 Obtained License
1988-03-01 Surface Casing Operation Performed
1988-03-02 Finished Drilling
1988-03-02 Well Log Performed
1988-03-03 Drill Stem Test Performed
1988-03-04 Production Casing Operation Performed
1988-03-04 Rig Released
1988-03-08 Perforation Treatment Performed - Open-Hole Completion
1988-03-09 Well Mode changed to Drilled and Cased
1988-10-27 Well Began Production
1988-10-27 Well Fluid changed to Gas
1988-10-27 Well Mode changed to Flowing
1989-06-17 Perforation Treatment Performed - Jet Perforation
1989-06-17 Well Fluid changed to Gas
1989-06-17 Well Mode changed to Flowing
1989-07-17 Perforation Treatment Performed - Fractured
1989-07-17 Well Fluid changed to Gas
1989-07-17 Well Mode changed to Suspended
1991-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-11 Plug Back Performed
1992-04-11 Well Fluid changed to Gas
1992-04-11 Well Mode changed to Abandoned Zone
1992-04-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-08 Open Hole/Barefoot Completion 690.00 692.00 0
1989-06-17 Perforation 551.00 555.00 13
1989-07-17 Fracture 551.00 555.00 0
1991-10-04 Acid Treatment 690.00 692.00 0
1991-10-05 Acid Treatment 690.00 692.00 0
1992-04-11 Packing Device Capped w/Cement 652.00 660.00 0
1992-04-11 Packing Device Capped w/Cement 537.00 545.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 290 0.0 0.0 0.0
1989 72 0.0 0.0 0.0

For data sources see[5]

References