X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624171615003

Well Details

Well ID: 0624171615003
Loading map...
Location: 00/15-16-062-17W4/3
Location Alias: 00/15-16-62-17 W4M
Location Alias 2: 00/15-16-062-17 W4/03
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 17
Section: 16
County/Municipality: Smoky Lake County
Well Name: ACL FIGURE LAKE 15-16-62-17
Operator Name: Paramount Resources Ltd.
License Number: 0141028
License Date: 1989-09-22
License Status: Amended
Spud Date: 1989-12-02
Final Drill Date: 1989-12-04
Well Total Depth: 686.00 m
Surface Hole Latitude: 54.366951
Surface Hole Longitude: -112.482643

For data sources see[1][2]

Well History

Date Event
1989-09-22 Obtained License
1989-12-03 Surface Casing Operation Performed
1989-12-04 Finished Drilling
1989-12-04 Well Log Performed
1989-12-04 Well Mode changed to Drilled and Cased
1989-12-05 Drill Stem Test Performed
1989-12-06 Production Casing Operation Performed
1989-12-06 Rig Released
1990-03-04 Well Log Performed
1990-03-07 Perforation Treatment Performed - Open-Hole Completion
1990-03-08 Perforation Treatment Performed - Jet Perforation
1990-03-08 Well Log Performed
1995-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-31 Perforation Treatment Performed - Jet Perforation
1995-10-31 Plug Back Performed
1995-12-01 Well Began Production
1995-12-01 Well Fluid changed to Gas
1995-12-01 Well Mode changed to Flowing
2018-12-31 Well Fluid changed to Gas
2018-12-31 Well Mode changed to Suspended
2020-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-07 Plug Back Performed
2020-02-07 Well Fluid changed to Gas
2020-02-07 Well Mode changed to Abandoned Zone
2020-02-08 Perforation Treatment Performed - Cement Plug
2020-02-08 Perforation Treatment Performed - Cement Squeeze
2020-02-08 Perforation Treatment Performed - Jet Perforation
2020-02-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-07 Open Hole/Barefoot Completion 683.50 686.00 0
2020-02-08 Perforation 235.00 236.00 12
1990-03-08 Perforation 547.50 551.00 19
1995-10-31 Packing Device Capped w/Cement 670.00 678.00 0
1995-10-31 Perforation 651.00 652.00 13
1995-10-31 Perforation 663.00 664.00 13
2020-02-07 Packing Device Capped w/Cement 638.00 646.00 0
2020-02-07 Packing Device Capped w/Cement 535.00 543.00 0
2020-02-08 Cement Squeeze 235.00 236.00 0
2020-02-08 Cement Plug 220.00 230.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 744 0.0 0.0 0.0
1996 8778 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8752 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8756 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8675 0.0 0.0 0.0
2004 8740 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8751 0.0 0.0 0.0
2008 8781 0.0 0.0 0.0
2009 8619 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 7024 0.0 0.0 0.0
2013 6277 0.0 0.0 0.0
2014 4495 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 5981 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References