X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624160410000

Well Details

Well ID: 0624160410000
Loading map...
Location: 00/10-04-062-16W4/0
Location Alias: 00/10-04-62-16 W4M
Location Alias 2: 00/10-04-062-16 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 16
Section: 04
County/Municipality: Smoky Lake County
Well Name: ACL EDWAND 10-4-62-16
Operator Name: Paramount Resources Ltd.
License Number: 0122721
License Date: 1986-02-27
License Status: Abandoned
Spud Date: 1986-03-07
Final Drill Date: 1986-03-13
Well Total Depth: 744.00 m
Surface Hole Latitude: 54.333850
Surface Hole Longitude: -112.335472

For data sources see[1][2]

Well History

Date Event
1986-02-27 Obtained License
1986-03-08 Surface Casing Operation Performed
1986-03-09 Lost Circulation Occurred
1986-03-11 Kick Occurred
1986-03-12 Well Log Performed
1986-03-13 Finished Drilling
1986-03-13 Well Log Performed
1986-03-14 Drill Stem Test Performed
1986-03-15 Production Casing Operation Performed
1986-03-15 Rig Released
1986-03-18 Well Log Performed
1986-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-19 Perforation Treatment Performed - Jet Perforation
1986-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-20 Perforation Treatment Performed - Jet Perforation
1986-03-20 Plug Back Performed
1986-12-19 Well Log Performed
1986-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-20 Plug Back Performed
1986-12-21 Perforation Treatment Performed - Jet Perforation
1987-01-08 Well Mode changed to Drilled and Cased
1996-02-01 Well Began Production
1996-02-01 Well Fluid changed to Gas
1996-02-01 Well Mode changed to Flowing
1998-10-30 Well Fluid changed to Gas
1998-10-30 Well Mode changed to Suspended
1999-02-09 Well Fluid changed to Gas
1999-02-09 Well Mode changed to Flowing
1999-10-27 Well Fluid changed to Gas
1999-10-27 Well Mode changed to Suspended
2003-01-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-02 Perforation Treatment Performed - Jet Perforation
2003-01-02 Plug Back Performed
2003-01-02 Well Fluid changed to Gas
2003-01-02 Well Mode changed to Abandoned Zone
2003-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-03 Perforation Treatment Performed - Jet Perforation
2003-01-03 Plug Back Performed
2003-01-03 Well Log Performed
2003-01-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-04 Plug Back Performed
2003-01-04 Well Abandoned
2003-01-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-19 Perforation 705.00 706.00 7
2003-01-02 Perforation 532.50 533.50 17
2003-01-03 Packing Device Capped w/Cement 523.00 531.00 0
2003-01-03 Perforation 491.00 492.00 17
2003-01-04 Packing Device Capped w/Cement 482.00 490.00 0
1986-03-19 Acid Treatment 705.00 706.00 0
1986-03-20 Packing Device Capped w/Cement 695.00 703.00 0
1986-03-20 Perforation 651.00 653.00 7
1986-03-20 Perforation 656.00 658.00 7
1986-03-20 Acid Treatment 651.00 658.00 0
1986-12-20 Packing Device Capped w/Cement 640.00 648.00 0
1986-12-21 Perforation 583.50 584.50 7
2003-01-02 Packing Device Capped w/Cement 574.00 582.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3877 0.0 0.0 0.0
1997 3722 0.0 0.0 0.0
1998 2985 0.0 0.0 0.0
1999 2392 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-03-09 Lost Circulation 630.00 687.00
1986-03-11 Kick 472.00 472.00

For data sources see[6]

References