X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624093416002

Well Details

Well ID: 0624093416002
Loading map...
Location: 00/16-34-062-09W4/2
Location Alias: 00/16-34-62-09 W4M
Location Alias 2: 00/16-34-062-09 W4/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 09
Section: 34
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: BAYTEX 16B MANN LAKE 16-34-62-9
Operator Name: Baytex Energy Ltd.
License Number: 0191704
License Date: 1996-09-25
License Status: Issued
Spud Date: 1996-10-06
Final Drill Date: 1996-10-10
Well Total Depth: 482.00 m
Surface Hole Latitude: 54.410900
Surface Hole Longitude: -111.258169

For data sources see[1][2]

Well History

Date Event
1996-09-25 Obtained License
1996-10-08 Surface Casing Operation Performed
1996-10-10 Finished Drilling
1996-10-10 Well Log Performed
1996-10-10 Well Mode changed to Drilled and Cased
1996-10-11 Production Casing Operation Performed
1996-10-11 Rig Released
1996-10-23 Well Log Performed
1996-10-30 Perforation Treatment Performed - Jet Perforation
1996-10-30 Well Log Performed
1997-11-12 Perforation Treatment Performed - Jet Perforation
2005-03-02 Perforation Treatment Performed - Jet Perforation
2005-03-02 Well Log Performed
2005-04-01 Well Began Production
2005-04-01 Well Fluid changed to Crude Bitumen
2005-04-01 Well Mode changed to Pumping
2006-06-04 Perforation Treatment Performed - Jet Perforation
2006-06-05 Perforation Treatment Performed - Casing Patch (Over Perfs)
2010-03-31 Well Fluid changed to Crude Bitumen
2010-03-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-30 Perforation 398.00 399.50 69
1997-11-12 Perforation 398.00 403.50 26
2005-03-02 Perforation 376.00 380.00 26
2005-03-02 Perforation 364.00 370.00 26
2006-06-04 Perforation 398.00 403.50 26
2006-06-05 Casing Patch 364.00 380.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3745 0.0 0.0 0.0
2006 2634 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[5]

References