If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624033411020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.408737,"lon":-110.373649,"icon":""}]} |
Location: 02/11-34-062-03W4/0 | |
Location Alias: 02/11-34-62-03 W4M | |
Location Alias 2: 02/11-34-062-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 03 | |
Section: 34 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: CPG 102 KENT 11-34-62-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0207720 | |
License Date: 1997-10-29 | |
License Status: Suspension | |
Spud Date: 1998-03-01 | |
Final Drill Date: 1998-03-03 | |
Well Total Depth: 410.00 m | |
Surface Hole Latitude: 54.408737 | |
Surface Hole Longitude: -110.373649 |
Date | Event |
---|---|
1997-10-29 | Obtained License |
1998-03-02 | Surface Casing Operation Performed |
1998-03-03 | Finished Drilling |
1998-03-03 | Production Casing Operation Performed |
1998-03-03 | Rig Released |
1998-03-03 | Well Mode changed to Drilled and Cased |
1998-03-07 | Well Log Performed |
1998-03-08 | Perforation Treatment Performed - Jet Perforation |
1999-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-03-03 | Perforation Treatment Performed - Jet Perforation |
1999-03-03 | Plug Back Performed |
2008-01-10 | Well Began Production |
2008-01-10 | Well Fluid changed to Gas |
2008-01-10 | Well Mode changed to Flowing |
2017-06-01 | Well Fluid changed to Gas |
2017-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-03-08 | Perforation | 375.00 | 376.00 | 13 |
1999-03-03 | Packing Device Capped w/Cement | 362.00 | 370.00 | 0 |
1999-03-03 | Perforation | 276.30 | 279.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 6830 | 0.0 | 0.0 | 0.0 |
2009 | 8228 | 0.0 | 0.0 | 0.0 |
2010 | 8485 | 0.0 | 0.0 | 0.0 |
2011 | 7949 | 0.0 | 0.0 | 0.0 |
2012 | 8602 | 0.0 | 0.0 | 0.0 |
2013 | 8385 | 0.0 | 0.0 | 0.0 |
2014 | 8267 | 0.0 | 0.0 | 0.0 |
2015 | 8526 | 0.0 | 0.0 | 0.0 |
2016 | 5847 | 0.0 | 0.0 | 0.0 |
For data sources see[5]