X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616042011000

Well Details

Well ID: 0616042011000
Loading map...
Location: 00/11-20-061-04W6/0
Location Alias: 00/11-20-61-04 W6M
Location Alias 2: 00/11-20-061-04 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 04
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: CDN-SUP ET AL PRAIRIER 11-20-61-4
Operator Name: ExxonMobil Canada Resources Company
License Number: 0074026
License Date: 1979-01-19
License Status: Abandoned
Spud Date: 1979-02-08
Final Drill Date: 1980-02-18
Well Total Depth: 3385.00 m
Surface Hole Latitude: 54.293431
Surface Hole Longitude: -118.566585

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-19 Obtained License
1979-03-15 Drill Stem Test Performed
1979-03-16 Drill Stem Test Performed
1980-02-18 Finished Drilling
1980-02-19 Well Log Performed
1980-02-21 Drill Stem Test Performed
1980-02-24 Drill Stem Test Performed
1980-02-27 Production Casing Operation Performed
1980-02-28 Well Mode changed to Drilled and Cased
1980-12-16 Perforation Treatment Performed - Jet Perforation
1981-01-22 Perforation Treatment Performed - Fractured
1981-01-27 Perforation Treatment Performed - Jet Perforation
1981-01-28 Perforation Treatment Performed - Fractured
1981-01-28 Perforation Treatment Performed - Jet Perforation
1981-01-31 Perforation Treatment Performed - Cement Squeeze
1981-01-31 Perforation Treatment Performed - Jet Perforation
1981-02-03 Perforation Treatment Performed - Fractured
1981-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-05 Perforation Treatment Performed - Jet Perforation
1981-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-08 Perforation Treatment Performed - Cement Squeeze
1981-02-08 Perforation Treatment Performed - Jet Perforation
1981-02-09 Perforation Treatment Performed - Cement Squeeze
1981-02-09 Perforation Treatment Performed - Jet Perforation
1981-02-10 Perforation Treatment Performed - Cement Squeeze
1981-02-10 Perforation Treatment Performed - Jet Perforation
1981-02-11 Perforation Treatment Performed - Cement Squeeze
1981-02-14 Perforation Treatment Performed - Jet Perforation
1981-02-16 Perforation Treatment Performed - Cement Squeeze
1981-02-24 Perforation Treatment Performed - Jet Perforation
1981-02-25 Perforation Treatment Performed - Fractured
1981-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-04 Perforation Treatment Performed - Fractured
1981-03-04 Perforation Treatment Performed - Jet Perforation
1981-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-08 Perforation Treatment Performed - Fractured
1981-03-12 Perforation Treatment Performed - Fractured
1981-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-18 Well Abandoned
1981-03-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-16 Perforation 3245.00 3255.00 7
1981-02-04 Packing Device Capped w/Cement 3208.00 3218.00 0
1981-02-05 Perforation 2803.00 2808.00 13
1981-02-08 Packing Device Capped w/Cement 2779.00 2789.00 0
1981-02-08 Perforation 2136.00 2137.00 13
1981-02-08 Cement Squeeze 2136.00 2137.00 0
1981-02-09 Cement Squeeze 2136.00 2137.00 0
1981-02-09 Perforation 2100.00 2101.00 13
1981-02-10 Cement Squeeze 2100.00 2101.00 0
1981-02-10 Perforation 2071.00 2072.00 13
1981-02-11 Cement Squeeze 2071.00 2072.00 0
1981-01-22 Fracture 3245.00 3255.00 0
1981-02-14 Perforation 2110.50 2112.00 13
1981-02-14 Perforation 2115.80 2119.00 13
1981-02-16 Cement Squeeze 2100.00 2101.00 0
1981-02-24 Perforation 2110.50 2112.00 13
1981-02-24 Perforation 2115.80 2117.40 13
1981-02-25 Fracture 2110.50 2117.40 0
1981-03-02 Packing Device Capped w/Cement 2089.00 2097.00 0
1981-03-04 Perforation 2084.00 2085.50 13
1981-03-04 Fracture 2084.00 2085.50 0
1981-03-05 Acid Treatment 2084.00 2085.50 0
1981-01-27 Perforation 3245.00 3254.70 7
1981-03-06 Acid Treatment 2084.00 2085.50 0
1981-03-08 Fracture 2084.00 2085.50 0
1981-03-12 Fracture 2084.00 2085.50 0
1981-03-18 Packing Device Capped w/Cement 2055.00 2065.00 0
1981-01-28 Perforation 3245.00 3254.70 7
1981-01-28 Fracture 3245.00 3254.70 0
1981-01-31 Cement Squeeze 3245.00 3254.70 0
1981-01-31 Perforation 3224.50 3231.00 3
1981-01-31 Perforation 3232.80 3235.10 12
1981-02-03 Fracture 3224.50 3235.10 0

For data sources see[4]



References