If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616030306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.244044,"lon":-118.367266,"icon":""}]} |
Location: 00/06-03-061-03W6/0 | |
Location Alias: 00/06-03-61-03 W6M | |
Location Alias 2: 00/06-03-061-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 03 | |
Section: 03 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MOBIL ET AL LATOR 6-3-61-3 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0075054 | |
License Date: 1979-03-23 | |
License Status: RecCertified | |
Spud Date: 1979-04-08 | |
Final Drill Date: 1979-07-11 | |
Well Total Depth: 3304.80 m | |
Surface Hole Latitude: 54.244044 | |
Surface Hole Longitude: -118.367266 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-03-23 | Obtained License |
1979-04-08 | Lost Circulation Occurred |
1979-07-11 | Finished Drilling |
1979-07-11 | Well Log Performed |
1979-07-14 | Drill Stem Test Performed |
1979-07-16 | Drill Stem Test Performed |
1979-07-18 | Drill Stem Test Performed |
1979-09-27 | Perforation Treatment Performed - Jet Perforation |
1979-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-09-30 | Perforation Treatment Performed - Fractured |
1979-09-30 | Perforation Treatment Performed - Jet Perforation |
1979-10-01 | Drill Stem Test Performed |
1979-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-10-02 | Perforation Treatment Performed - Jet Perforation |
1979-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-10-05 | Perforation Treatment Performed - Jet Perforation |
1979-10-08 | Perforation Treatment Performed - Jet Perforation |
1979-10-09 | Drill Stem Test Performed |
1979-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-10-11 | Drill Stem Test Performed |
1979-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-11-17 | Perforation Treatment Performed - Jet Perforation |
1979-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-11-26 | Perforation Treatment Performed - Fractured |
1979-12-16 | Perforation Treatment Performed - Cement Plug |
1979-12-16 | Well Abandoned |
1979-12-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-09-27 | Perforation | 3263.00 | 3268.00 | 7 |
1979-10-02 | Perforation | 2616.00 | 2619.00 | 7 |
1979-10-02 | Perforation | 2624.50 | 2626.50 | 7 |
1979-10-02 | Perforation | 2631.00 | 2638.00 | 7 |
1979-10-04 | Acid Treatment | 2606.00 | 2638.00 | 0 |
1979-10-05 | Packing Device Capped w/Cement | 2582.00 | 2590.00 | 0 |
1979-10-05 | Perforation | 2098.00 | 2100.00 | 7 |
1979-10-05 | Perforation | 2210.00 | 2211.00 | 7 |
1979-10-08 | Perforation | 2177.00 | 2182.00 | 13 |
1979-10-09 | Acid Treatment | 2098.00 | 2211.00 | 0 |
1979-11-08 | Packing Device Capped w/Cement | 2168.00 | 2173.00 | 0 |
1979-09-27 | Perforation | 3278.00 | 3282.00 | 7 |
1979-11-17 | Perforation | 2148.00 | 2151.00 | 7 |
1979-11-18 | Acid Treatment | 2148.00 | 2151.00 | 0 |
1979-11-26 | Fracture | 2148.00 | 2151.00 | 0 |
1979-12-16 | Cement Plug | 2028.00 | 2125.00 | 0 |
1979-09-27 | Perforation | 3285.00 | 3288.00 | 7 |
1979-09-28 | Acid Treatment | 3263.00 | 3288.00 | 0 |
1979-09-30 | Packing Device Capped w/Cement | 3247.00 | 3255.00 | 0 |
1979-09-30 | Perforation | 2805.00 | 2825.00 | 13 |
1979-09-30 | Fracture | 2805.00 | 2825.00 | 0 |
1979-10-02 | Packing Device Capped w/Cement | 2787.00 | 2795.00 | 0 |
1979-10-02 | Perforation | 2606.00 | 2609.00 | 7 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-04-08 | Lost Circulation | 41.20 | 41.20 |
For data sources see[5]