X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616021310000

Well Details

Well ID: 0616021310000
Loading map...
Location: 00/10-13-061-02W6/0
Location Alias: 00/10-13-61-02 W6M
Location Alias 2: 00/10-13-061-02 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 02
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: DOME ET AL LATOR 10-13-61-2
Operator Name: BP Canada Energy Group ULC
License Number: 0076723
License Date: 1979-07-04
License Status: RecCertified
Spud Date: 1979-07-23
Final Drill Date: 1979-09-17
Well Total Depth: 3190.00 m
Surface Hole Latitude: 54.278768
Surface Hole Longitude: -118.157070

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-04 Obtained License
1979-07-23 Lost Circulation Occurred
1979-07-25 Lost Circulation Occurred
1979-09-17 Finished Drilling
1979-09-23 Production Casing Operation Performed
1979-10-08 Perforation Treatment Performed - Jet Perforation
1979-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-18 Perforation Treatment Performed - Jet Perforation
1979-10-25 Perforation Treatment Performed - Fractured
1979-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-22 Perforation Treatment Performed - Jet Perforation
1979-11-24 Perforation Treatment Performed - Cement Squeeze
1979-11-28 Perforation Treatment Performed - Cement Squeeze
1979-12-03 Perforation Treatment Performed - Jet Perforation
1979-12-07 Perforation Treatment Performed - Fractured
1980-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-13 Perforation Treatment Performed - Cement Plug
1980-08-13 Well Abandoned
1980-08-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-08 Perforation 3148.00 3154.00 7
1979-12-03 Perforation 2132.00 2141.00 7
1979-12-03 Perforation 2125.00 2127.00 7
1979-12-07 Fracture 2125.00 2141.00 0
1980-08-06 Packing Device Capped w/Cement 2120.00 2120.00 0
1980-08-13 Cement Plug 1550.00 1628.50 0
1979-10-17 Packing Device Capped w/Cement 3141.00 3141.00 0
1979-10-18 Perforation 2705.00 2710.00 7
1979-10-25 Fracture 2705.00 2710.00 0
1979-11-22 Packing Device Capped w/Cement 2700.00 2700.00 0
1979-11-22 Perforation 2156.00 2156.50 16
1979-11-22 Perforation 2117.00 2117.50 16
1979-11-24 Cement Squeeze 2156.00 2156.50 0
1979-11-28 Cement Squeeze 2117.00 2117.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-07-23 Lost Circulation 28.00 28.00
1979-07-25 Lost Circulation 230.00 230.00

For data sources see[5]

References