If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616012208002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.299915,"lon":-118.074878,"icon":""}]} |
Location: 00/08-22-061-01W6/2 | |
Location Alias: 00/08-22-61-01 W6M | |
Location Alias 2: 00/08-22-061-01 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 01 | |
Section: 22 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE ET AL HZ WANYAN 8-22-61-1 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0434930 | |
License Date: 2011-07-06 | |
License Status: Amended | |
Spud Date: 2011-08-27 | |
Final Drill Date: 2011-10-18 | |
Well Total Depth: 4950.00 m | |
Surface Hole Latitude: 54.299915 | |
Surface Hole Longitude: -118.074878 |
Date | Event |
---|---|
2011-07-06 | Obtained License |
2011-09-13 | Well Log Performed |
2011-09-19 | Direction Drilling Operation Performed - Horizontal |
2011-09-19 | Well Log Performed |
2011-09-27 | Intermediate Casing Operation Performed |
2011-09-27 | Well Log Performed |
2011-10-17 | Well Log Performed |
2011-10-18 | Finished Drilling |
2011-10-18 | Well Mode changed to Drilled and Cased |
2011-10-21 | Liner Casing Operation Performed |
2011-10-21 | Rig Released |
2011-10-29 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-01 | Well Began Production |
2011-11-01 | Well Fluid changed to Crude Oil |
2011-11-01 | Well Mode changed to Pumping |
2013-12-01 | Well Fluid changed to Crude Oil |
2013-12-01 | Well Mode changed to Suspended |
2014-03-01 | Well Fluid changed to Crude Oil |
2014-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-19 | 2860.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-29 | Open Hole/Barefoot Completion | 4944.50 | 4950.00 | 0 |
2011-10-31 | Multi-Stage Fracture | 4062.20 | 4062.30 | 0 |
2011-10-31 | Multi-Stage Fracture | 3964.00 | 3964.10 | 0 |
2011-10-31 | Multi-Stage Fracture | 3866.10 | 3866.20 | 0 |
2011-10-31 | Multi-Stage Fracture | 3754.50 | 3754.60 | 0 |
2011-11-01 | Multi-Stage Fracture | 3654.50 | 3654.60 | 0 |
2011-11-01 | Multi-Stage Fracture | 3541.50 | 3541.60 | 0 |
2011-11-01 | Multi-Stage Fracture | 3428.10 | 3428.20 | 0 |
2011-11-01 | Multi-Stage Fracture | 3329.90 | 3330.00 | 0 |
2011-10-30 | Multi-Stage Fracture | 4919.90 | 4922.40 | 0 |
2011-10-30 | Multi-Stage Fracture | 4807.30 | 4807.40 | 0 |
2011-10-30 | Multi-Stage Fracture | 4707.20 | 4707.30 | 0 |
2011-10-31 | Multi-Stage Fracture | 4607.30 | 4607.40 | 0 |
2011-10-31 | Multi-Stage Fracture | 4495.40 | 4495.50 | 0 |
2011-10-31 | Multi-Stage Fracture | 4383.60 | 4383.70 | 0 |
2011-10-31 | Multi-Stage Fracture | 4271.90 | 4272.00 | 0 |
2011-10-31 | Multi-Stage Fracture | 4173.70 | 4173.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 864 | 0.0 | 0.0 | 0.0 |
2012 | 4991 | 0.0 | 0.0 | 0.0 |
2014 | 1560 | 0.0 | 0.0 | 0.0 |
2015 | 1536 | 0.0 | 0.0 | 0.0 |
2016 | 73 | 0.0 | 0.0 | 0.0 |
2017 | 192 | 0.0 | 0.0 | 0.0 |
2018 | 192 | 0.0 | 0.0 | 0.0 |
2019 | 168 | 0.0 | 0.0 | 0.0 |
2020 | 264 | 0.0 | 0.0 | 0.0 |
For data sources see[6]