X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616012208002

Well Details

Well ID: 0616012208002
Loading map...
Location: 00/08-22-061-01W6/2
Location Alias: 00/08-22-61-01 W6M
Location Alias 2: 00/08-22-061-01 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 01
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE ET AL HZ WANYAN 8-22-61-1
Operator Name: Cequence Energy Ltd.
License Number: 0434930
License Date: 2011-07-06
License Status: Amended
Spud Date: 2011-08-27
Final Drill Date: 2011-10-18
Well Total Depth: 4950.00 m
Surface Hole Latitude: 54.299915
Surface Hole Longitude: -118.074878

For data sources see[1][2]

Well History

Date Event
2011-07-06 Obtained License
2011-09-13 Well Log Performed
2011-09-19 Direction Drilling Operation Performed - Horizontal
2011-09-19 Well Log Performed
2011-09-27 Intermediate Casing Operation Performed
2011-09-27 Well Log Performed
2011-10-17 Well Log Performed
2011-10-18 Finished Drilling
2011-10-18 Well Mode changed to Drilled and Cased
2011-10-21 Liner Casing Operation Performed
2011-10-21 Rig Released
2011-10-29 Perforation Treatment Performed - Open-Hole Completion
2011-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-01 Well Began Production
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Mode changed to Pumping
2013-12-01 Well Fluid changed to Crude Oil
2013-12-01 Well Mode changed to Suspended
2014-03-01 Well Fluid changed to Crude Oil
2014-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-19 2860.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-29 Open Hole/Barefoot Completion 4944.50 4950.00 0
2011-10-31 Multi-Stage Fracture 4062.20 4062.30 0
2011-10-31 Multi-Stage Fracture 3964.00 3964.10 0
2011-10-31 Multi-Stage Fracture 3866.10 3866.20 0
2011-10-31 Multi-Stage Fracture 3754.50 3754.60 0
2011-11-01 Multi-Stage Fracture 3654.50 3654.60 0
2011-11-01 Multi-Stage Fracture 3541.50 3541.60 0
2011-11-01 Multi-Stage Fracture 3428.10 3428.20 0
2011-11-01 Multi-Stage Fracture 3329.90 3330.00 0
2011-10-30 Multi-Stage Fracture 4919.90 4922.40 0
2011-10-30 Multi-Stage Fracture 4807.30 4807.40 0
2011-10-30 Multi-Stage Fracture 4707.20 4707.30 0
2011-10-31 Multi-Stage Fracture 4607.30 4607.40 0
2011-10-31 Multi-Stage Fracture 4495.40 4495.50 0
2011-10-31 Multi-Stage Fracture 4383.60 4383.70 0
2011-10-31 Multi-Stage Fracture 4271.90 4272.00 0
2011-10-31 Multi-Stage Fracture 4173.70 4173.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 864 0.0 0.0 0.0
2012 4991 0.0 0.0 0.0
2014 1560 0.0 0.0 0.0
2015 1536 0.0 0.0 0.0
2016 73 0.0 0.0 0.0
2017 192 0.0 0.0 0.0
2018 192 0.0 0.0 0.0
2019 168 0.0 0.0 0.0
2020 264 0.0 0.0 0.0

For data sources see[6]

References