X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615271101000

Well Details

Well ID: 0615271101000
Loading map...
Location: 00/01-11-061-27W5/0
Location Alias: 00/01-11-61-27 W5M
Location Alias 2: 00/01-11-061-27 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 27
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE ET AL HZ WANYAN 1-11-61-27
Operator Name: Cequence Energy Ltd.
License Number: 0436952
License Date: 2011-09-20
License Status: Issued
Spud Date: 2011-12-10
Final Drill Date: 2012-01-17
Well Total Depth: 5027.00 m
Surface Hole Latitude: 54.268842
Surface Hole Longitude: -117.944982

For data sources see[1][2]

Well History

Date Event
2011-09-20 Obtained License
2011-12-15 Surface Casing Operation Performed
2011-12-24 Direction Drilling Operation Performed - Horizontal
2011-12-31 Well Log Performed
2012-01-01 Well Log Performed
2012-01-02 Intermediate Casing Operation Performed
2012-01-17 Finished Drilling
2012-01-19 Liner Casing Operation Performed
2012-01-21 Rig Released
2012-01-21 Well Mode changed to Drilled and Cased
2012-01-28 Perforation Treatment Performed - Open-Hole Completion
2012-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-05 Well Began Production
2012-02-05 Well Fluid changed to Gas
2012-02-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-24 2865.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-28 Open Hole/Barefoot Completion 5016.50 5027.00 0
2012-01-31 Multi-Stage Fracture 4163.60 4163.70 0
2012-01-31 Multi-Stage Fracture 4049.80 4049.90 0
2012-01-31 Multi-Stage Fracture 3936.10 3936.20 0
2012-01-31 Multi-Stage Fracture 3795.20 3795.30 0
2012-01-31 Multi-Stage Fracture 3654.70 3654.80 0
2012-02-01 Multi-Stage Fracture 3526.90 3527.00 0
2012-02-01 Multi-Stage Fracture 3385.60 3385.70 0
2012-02-01 Multi-Stage Fracture 3272.90 3273.00 0
2012-01-29 Multi-Stage Fracture 4978.80 4979.90 0
2012-01-29 Multi-Stage Fracture 4890.80 4890.90 0
2012-01-29 Multi-Stage Fracture 4791.20 4791.30 0
2012-01-29 Multi-Stage Fracture 4690.80 4690.90 0
2012-01-29 Multi-Stage Fracture 4578.20 4578.30 0
2012-01-30 Multi-Stage Fracture 4491.40 4491.50 0
2012-01-30 Multi-Stage Fracture 4391.00 4391.10 0
2012-01-30 Multi-Stage Fracture 4277.20 4277.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6696 0.0 0.0 0.0
2013 6852 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 3600 0.0 0.0 0.0
2016 6360 0.0 0.0 0.0
2017 7613 0.0 0.0 0.0
2018 5424 0.0 0.0 0.0
2019 8184 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References