X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615263505002

Well Details

Well ID: 0615263505002
Loading map...
Location: 00/05-35-061-26W5/2
Location Alias: 00/05-35-61-26 W5M
Location Alias 2: 00/05-35-061-26 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 5-35-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0438637
License Date: 2011-11-09
License Status: Suspension
Spud Date: 2011-12-01
Final Drill Date: 2012-01-11
Well Total Depth: 4916.00 m
Surface Hole Latitude: 54.327794
Surface Hole Longitude: -117.827393

For data sources see[1][2]

Well History

Date Event
2011-11-09 Obtained License
2011-12-19 Direction Drilling Operation Performed - Horizontal
2011-12-28 Intermediate Casing Operation Performed
2012-01-11 Finished Drilling
2012-01-11 Well Log Performed
2012-01-11 Well Mode changed to Drilled and Cased
2012-01-13 Liner Casing Operation Performed
2012-01-14 Rig Released
2012-02-04 Perforation Treatment Performed - Open-Hole Completion
2012-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-05 Well Began Production
2012-02-05 Well Fluid changed to Gas
2012-02-05 Well Mode changed to Flowing
2012-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-31 Well Fluid changed to Gas
2017-03-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-19 2594.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-04 Open Hole/Barefoot Completion 4910.30 4916.00 0
2012-02-06 Multi-Stage Fracture 4151.40 4151.50 0
2012-02-06 Multi-Stage Fracture 4079.40 4079.50 0
2012-02-06 Multi-Stage Fracture 3994.60 3994.70 0
2012-02-07 Multi-Stage Fracture 3922.70 3922.80 0
2012-02-07 Multi-Stage Fracture 3851.20 3851.30 0
2012-02-07 Multi-Stage Fracture 3622.10 3779.30 0
2012-02-07 Multi-Stage Fracture 3340.80 3537.00 0
2012-02-08 Multi-Stage Fracture 3046.30 3242.30 0
2012-02-05 Multi-Stage Fracture 4887.50 4887.60 0
2012-02-05 Multi-Stage Fracture 4814.20 4814.30 0
2012-02-05 Multi-Stage Fracture 4715.50 4715.60 0
2012-02-05 Multi-Stage Fracture 4616.90 4617.00 0
2012-02-05 Multi-Stage Fracture 4518.40 4818.50 0
2012-02-05 Multi-Stage Fracture 4419.70 4419.80 0
2012-02-06 Multi-Stage Fracture 4308.30 4308.40 0
2012-02-06 Multi-Stage Fracture 4222.90 4223.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4458 0.0 0.0 0.0
2013 8592 0.0 0.0 0.0
2014 8467 0.0 0.0 0.0
2015 4151 0.0 0.0 0.0
2016 96 0.0 0.0 0.0

For data sources see[6]

References