X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615262705000

Well Details

Well ID: 0615262705000
Loading map...
Location: 00/05-27-061-26W5/0
Location Alias: 00/05-27-61-26 W5M
Location Alias 2: 00/05-27-061-26 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 15-15 HZ SIMON 5-27-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0470904
License Date: 2014-10-27
License Status: Issued
Spud Date: 2014-11-13
Final Drill Date: 2014-12-10
Well Total Depth: 5251.00 m
Surface Hole Latitude: 54.281813
Surface Hole Longitude: -117.808359

For data sources see[1][2]

Well History

Date Event
2014-10-27 Obtained License
2014-11-17 Surface Casing Operation Performed
2014-11-21 Direction Drilling Operation Performed - Deviate
2014-12-02 Intermediate Casing Operation Performed
2014-12-03 Direction Drilling Operation Performed - Horizontal
2014-12-07 Well Log Performed
2014-12-09 Well Log Performed
2014-12-10 Finished Drilling
2014-12-10 Well Log Performed
2014-12-14 Liner Casing Operation Performed
2014-12-14 Rig Released
2014-12-14 Well Mode changed to Drilled and Cased
2015-02-05 Perforation Treatment Performed - Open-Hole Completion
2015-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-17 Well Began Production
2015-02-17 Well Fluid changed to Gas
2015-02-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-15 Canelson Drilling Inc. 18 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-21 2108.50 Deviate (5 - 79 degrees)
2014-12-03 3096.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-05 Open Hole/Barefoot Completion 5245.00 5251.00 0
2015-02-11 Multi-Stage Fracture 4585.20 4585.30 0
2015-02-11 Multi-Stage Fracture 4500.60 4500.70 0
2015-02-11 Multi-Stage Fracture 4416.50 4416.60 0
2015-02-11 Multi-Stage Fracture 4332.40 4332.50 0
2015-02-11 Multi-Stage Fracture 4248.00 4248.10 0
2015-02-11 Multi-Stage Fracture 4163.90 4164.00 0
2015-02-11 Multi-Stage Fracture 4080.40 4080.50 0
2015-02-11 Multi-Stage Fracture 3996.90 3997.00 0
2015-02-11 Multi-Stage Fracture 3916.10 3916.20 0
2015-02-11 Multi-Stage Fracture 3833.00 3833.10 0
2015-02-11 Multi-Stage Fracture 5223.30 5223.40 0
2015-02-11 Multi-Stage Fracture 3751.70 3751.80 0
2015-02-11 Multi-Stage Fracture 3667.50 3667.60 0
2015-02-11 Multi-Stage Fracture 3584.50 3584.60 0
2015-02-12 Multi-Stage Fracture 3502.00 3502.10 0
2015-02-12 Multi-Stage Fracture 3418.10 3418.20 0
2015-02-12 Multi-Stage Fracture 3333.60 3333.70 0
2015-02-12 Multi-Stage Fracture 3252.50 3252.60 0
2015-02-12 Multi-Stage Fracture 3157.30 3157.40 0
2015-02-11 Multi-Stage Fracture 5137.40 5137.50 0
2015-02-11 Multi-Stage Fracture 5066.10 5066.20 0
2015-02-11 Multi-Stage Fracture 4994.40 4994.50 0
2015-02-11 Multi-Stage Fracture 4923.00 4923.10 0
2015-02-11 Multi-Stage Fracture 4838.30 4838.40 0
2015-02-11 Multi-Stage Fracture 4754.50 4754.60 0
2015-02-11 Multi-Stage Fracture 4669.90 4670.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-11 2015-02-12 2,946 8,435 N/A
2 2015-02-11 2015-02-11 2,946 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 76.7547 N/A
20/40 SB Excel Calfrac Quartz 14808-60-7 100 3.3795 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 15.5126 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.3902 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0152 N/A
Water 7732-18-5 100 0.0155 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0687 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0741 N/A
Isopropanol 67-63-0 100 0.0746 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0741 N/A
Triethylene glycol 112-27-6 100 0.0746 N/A
Water 7732-18-5 100 0.0744 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 2.6747 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0828 N/A
2 30/50 Prime Plus Calfrac Quartz 14808-60-7 100 2.3837 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-21 2014-09-27 Surface Water - River 8792

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7265 0.0 0.0 0.0
2016 8172 0.0 0.0 0.0
2017 8159 0.0 0.0 0.0
2018 6648 0.0 0.0 0.0
2019 6785 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-14 No Incident Encountered 0.00 0.00
2015-02-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References