X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615262109002

Well Details

Well ID: 0615262109002
Loading map...
Location: 00/09-21-061-26W5/2
Location Alias: 00/09-21-61-26 W5M
Location Alias 2: 00/09-21-061-26 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 7-29 HZ SIMON 9-21-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0448769
License Date: 2012-09-27
License Status: Amended
Spud Date: 2013-01-13
Final Drill Date: 2013-02-23
Well Total Depth: 5431.00 m
Surface Hole Latitude: 54.302076
Surface Hole Longitude: -117.859874

For data sources see[1][2]

Well History

Date Event
2012-09-27 Obtained License
2013-01-29 Direction Drilling Operation Performed - Horizontal
2013-02-06 Intermediate Casing Operation Performed
2013-02-23 Finished Drilling
2013-02-23 Well Mode changed to Drilled and Cased
2013-02-24 Liner Casing Operation Performed
2013-02-26 Rig Released
2013-03-01 Perforation Treatment Performed - Open-Hole Completion
2013-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-13 Well Began Production
2013-03-13 Well Fluid changed to Gas
2013-03-13 Well Mode changed to Flowing
2013-03-20 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-01-29 3035.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-01 Open Hole/Barefoot Completion 5420.50 5431.00 0
2013-03-10 Multi-Stage Fracture 4752.90 4753.00 0
2013-03-11 Multi-Stage Fracture 4668.10 4668.20 0
2013-03-11 Multi-Stage Fracture 4583.30 4583.40 0
2013-03-11 Multi-Stage Fracture 4485.10 4485.20 0
2013-03-11 Multi-Stage Fracture 4400.20 4400.30 0
2013-03-11 Multi-Stage Fracture 4315.50 4315.60 0
2013-03-11 Multi-Stage Fracture 4230.70 4230.80 0
2013-03-11 Multi-Stage Fracture 4145.80 4145.90 0
2013-03-11 Multi-Stage Fracture 4060.90 4061.00 0
2013-03-11 Multi-Stage Fracture 3976.10 3976.20 0
2013-03-10 Multi-Stage Fracture 5405.30 5412.30 0
2013-03-11 Multi-Stage Fracture 3891.30 3891.40 0
2013-03-11 Multi-Stage Fracture 3806.40 3806.50 0
2013-03-11 Multi-Stage Fracture 3721.50 3721.60 0
2013-03-11 Multi-Stage Fracture 3636.90 3637.00 0
2013-03-11 Multi-Stage Fracture 3552.20 3552.30 0
2013-03-11 Multi-Stage Fracture 3454.30 3454.40 0
2013-03-11 Multi-Stage Fracture 3369.60 3369.70 0
2013-03-11 Multi-Stage Fracture 3284.80 3284.90 0
2013-03-11 Multi-Stage Fracture 3200.10 3200.20 0
2013-03-10 Multi-Stage Fracture 5347.00 5347.10 0
2013-03-10 Multi-Stage Fracture 5262.10 5262.20 0
2013-03-10 Multi-Stage Fracture 5177.30 5177.40 0
2013-03-10 Multi-Stage Fracture 5092.40 5092.50 0
2013-03-10 Multi-Stage Fracture 5007.50 5007.60 0
2013-03-10 Multi-Stage Fracture 4922.60 4922.70 0
2013-03-10 Multi-Stage Fracture 4837.70 4837.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-10 2013-03-11 2,984 8,015 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.1512 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 1.3557 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 10.8376 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.4106 N/A
Tolcide PS75LT Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0123 N/A
Water 7732-18-5 100 0.0131 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0783 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0902 N/A
Ethoxylated phenolic resin 8300 100 0.0917 N/A
Isobutyl ketone 8300 100 0.0903 N/A
Non-Hazardous Ingredients Trade Secret 100 0.106 N/A
Organic acid salts 1 8300 100 0.0902 N/A
Organic acid salts 2 8300 100 0.0915 N/A
Organic acid salts 3 8300 100 0.0917 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 3.6777 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0775 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-19 2013-03-11 Groundwater - Non-saline less than or equal to 150m deep 400
2013-02-19 2013-02-19 Recycled Fracturing Water (treated at well site) 1200
2013-02-21 2013-02-28 Recycled Fracturing Water (treated at well site) 1231
2013-02-28 2013-03-01 Recycled Fracturing Water (treated at well site) 60
2013-02-26 2013-02-26 Recycled Fracturing Water (treated at well site) 30
2013-03-01 2013-03-11 Surface Water - River 902
2013-02-19 2013-03-10 Surface Water - River 466
2013-03-01 2013-03-10 Recycled Fracturing Water (treated at well site) 30
2013-02-20 2013-02-20 Recycled Fracturing Water (treated at well site) 27
2013-03-02 2013-03-11 Oilfield Produced Water 157
2013-02-21 2013-03-10 Recycled Fracturing Water (treated at well site) 417
2013-02-21 2013-03-03 Recycled Fracturing Water (treated at well site) 3038
2013-03-01 2013-03-08 Recycled Fracturing Water (treated at well site) 57

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3694 0.0 0.0 0.0
2014 7789 0.0 0.0 0.0
2015 4782 0.0 0.0 0.0
2016 3768 0.0 0.0 0.0
2017 4032 0.0 0.0 0.0
2018 2376 0.0 0.0 0.0
2019 24 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-26 No Incident Encountered 0.00 0.00
2013-03-26 No Incident Encountered 0.00 0.00

For data sources see[9]

References