X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615262108000

Well Details

Well ID: 0615262108000
Loading map...
Location: 00/08-21-061-26W5/0
Location Alias: 00/08-21-61-26 W5M
Location Alias 2: 00/08-21-061-26 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 7-29 HZ SIMON 8-21-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0448769
License Date: 2012-09-27
License Status: Amended
Spud Date: 2012-11-01
Final Drill Date: 2012-11-26
Well Total Depth: 5546.00 m
Surface Hole Latitude: 54.302076
Surface Hole Longitude: -117.859874

For data sources see[1][2]

Well History

Date Event
2012-09-27 Obtained License
2012-11-04 Surface Casing Operation Performed
2012-11-05 Direction Drilling Operation Performed - Deviate
2012-11-15 Intermediate Casing Operation Performed
2012-11-16 Direction Drilling Operation Performed - Horizontal
2012-11-16 Well Log Performed
2012-11-26 Finished Drilling
2012-11-26 Well Log Performed
2012-11-26 Well Mode changed to Drilled and Cased
2012-11-30 Rig Released
2012-12-03 Well Log Performed
2012-12-07 Perforation Treatment Performed - Open-Hole Completion
2012-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-08 Well Began Production
2012-12-08 Well Fluid changed to Gas
2012-12-08 Well Mode changed to Flowing
2012-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-06 Well Log Performed
2013-02-04 Plug Back Performed
2014-02-28 Well Fluid changed to Gas
2014-02-28 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-01 Canelson Drilling Inc. 19 N/A Drill To LD
2013-01-13 Canelson Drilling Inc. 19 5671 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-05 696.50 Deviate (5 - 79 degrees)
2012-11-05 696.50 Deviate (5 - 79 degrees)
2012-11-16 3047.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-07 Open Hole/Barefoot Completion 5531.30 5546.00 0
2012-12-10 Multi-Stage Fracture 4824.90 4825.00 0
2012-12-11 Multi-Stage Fracture 4739.70 4739.80 0
2012-12-12 Multi-Stage Fracture 4286.70 4286.80 0
2012-12-12 Multi-Stage Fracture 4187.90 4188.00 0
2012-12-12 Multi-Stage Fracture 4089.40 4089.50 0
2012-12-12 Multi-Stage Fracture 3977.50 3977.60 0
2012-12-12 Multi-Stage Fracture 3865.50 3865.60 0
2012-12-12 Multi-Stage Fracture 3753.40 3753.50 0
2012-12-12 Multi-Stage Fracture 3628.00 3628.10 0
2012-12-12 Multi-Stage Fracture 3529.80 3529.90 0
2012-12-08 Multi-Stage Fracture 5493.50 5495.10 0
2012-12-12 Multi-Stage Fracture 3295.80 3295.90 0
2012-12-12 Multi-Stage Fracture 3183.70 3183.80 0
2012-12-12 Multi-Stage Fracture 3071.60 3071.70 0
2012-12-08 Multi-Stage Fracture 5421.70 5421.80 0
2012-12-09 Multi-Stage Fracture 5336.40 5336.50 0
2012-12-09 Multi-Stage Fracture 5251.10 5251.20 0
2012-12-09 Multi-Stage Fracture 5165.90 5166.00 0
2012-12-10 Multi-Stage Fracture 5080.70 5080.80 0
2012-12-10 Multi-Stage Fracture 4995.40 4995.50 0
2012-12-10 Multi-Stage Fracture 4910.10 4910.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 351 0.0 0.0 0.0
2013 24 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-01 No Incident Encountered 0.00 0.00
2013-01-08 No Incident Encountered 0.00 0.00
2013-02-06 No Incident Encountered 0.00 0.00

For data sources see[8]

References