X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615223601020

Well Details

Well ID: 0615223601020
Loading map...
Location: 02/01-36-061-22W5/0
Location Alias: 02/01-36-61-22 W5M
Location Alias 2: 02/01-36-061-22 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 22
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 102/HZ KAYBOBS 1-36-61-22
Operator Name: Chevron Canada Limited
License Number: 0438560
License Date: 2011-11-04
License Status: Amended
Spud Date: 2012-05-27
Final Drill Date: 2012-06-28
Well Total Depth: 5010.00 m
Surface Hole Latitude: 54.303719
Surface Hole Longitude: -117.140577

For data sources see[1][2]

Well History

Date Event
2011-11-04 Obtained License
2012-05-29 Surface Casing Operation Performed
2012-05-30 Well Log Performed
2012-05-31 Direction Drilling Operation Performed - Deviate
2012-06-19 Direction Drilling Operation Performed - Horizontal
2012-06-22 Intermediate Casing Operation Performed
2012-06-24 Well Log Performed
2012-06-28 Finished Drilling
2012-06-28 Well Mode changed to Drilled and Cased
2012-06-29 Well Log Performed
2012-07-01 Well Log Performed
2012-07-02 Liner Casing Operation Performed
2012-07-05 Rig Released
2012-08-09 Well Log Performed
2012-09-02 Perforation Treatment Performed - Jet Perforation
2012-09-23 Perforation Treatment Performed - Fractured
2012-09-25 Perforation Treatment Performed - Jet Perforation
2012-09-26 Perforation Treatment Performed - Fractured
2012-09-28 Perforation Treatment Performed - Jet Perforation
2012-09-28 Well Log Performed
2012-09-29 Perforation Treatment Performed - Fractured
2012-10-01 Perforation Treatment Performed - Jet Perforation
2012-10-01 Well Log Performed
2012-10-02 Perforation Treatment Performed - Fractured
2012-10-02 Perforation Treatment Performed - Jet Perforation
2012-10-02 Well Log Performed
2012-10-03 Perforation Treatment Performed - Fractured
2012-10-03 Perforation Treatment Performed - Jet Perforation
2012-10-03 Well Log Performed
2012-10-04 Perforation Treatment Performed - Jet Perforation
2012-10-05 Perforation Treatment Performed - Fractured
2012-10-05 Perforation Treatment Performed - Jet Perforation
2012-10-05 Well Log Performed
2012-10-06 Perforation Treatment Performed - Fractured
2012-10-06 Perforation Treatment Performed - Jet Perforation
2012-10-06 Well Log Performed
2013-03-28 Well Began Production
2013-03-28 Well Fluid changed to Shale Gas Only
2013-03-28 Well Mode changed to Flowing
2019-12-31 Well Fluid changed to Shale Gas Only
2019-12-31 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-27 Jomax Drilling (1988) Limited 7E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-31 592.40 Deviate (5 - 79 degrees)
2012-06-19 3619.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-02 Perforation 4897.00 4898.00 20
2012-10-02 Perforation 4502.00 4503.00 20
2012-10-02 Fracture 4557.00 4558.00 0
2012-10-02 Fracture 4502.00 4503.00 0
2012-10-03 Perforation 4461.00 4462.50 20
2012-10-03 Perforation 4408.00 4409.50 20
2012-10-03 Fracture 4461.00 4462.50 0
2012-10-03 Fracture 4408.00 4409.50 0
2012-10-03 Perforation 4359.00 4360.00 20
2012-10-03 Perforation 4309.00 4310.00 20
2012-10-03 Fracture 4359.00 4360.00 0
2012-09-23 Fracture 4897.00 4898.00 0
2012-10-03 Fracture 4309.00 4310.00 0
2012-10-04 Perforation 4196.00 4197.50 20
2012-10-05 Fracture 4196.00 4197.50 0
2012-10-05 Perforation 4138.00 4139.00 20
2012-10-05 Perforation 4094.00 4095.00 20
2012-10-05 Fracture 4138.00 4139.00 0
2012-10-05 Fracture 4094.00 4095.00 0
2012-10-06 Perforation 4024.00 4025.00 20
2012-10-06 Perforation 3979.00 3980.00 20
2012-10-06 Perforation 3935.00 3936.00 20
2012-09-25 Perforation 4854.00 4855.00 20
2012-10-06 Fracture 4024.00 4025.00 0
2012-10-06 Fracture 3979.00 3980.00 0
2012-10-06 Fracture 3935.00 3936.00 0
2012-09-26 Fracture 4854.00 4855.00 0
2012-09-28 Perforation 4807.00 4808.00 20
2012-09-29 Fracture 4807.00 4808.00 0
2012-10-01 Perforation 4629.00 4630.50 20
2012-10-02 Fracture 4629.00 4630.50 0
2012-10-02 Perforation 4557.00 4558.00 20

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5297 0.0 0.0 0.0
2014 5283 0.0 0.0 0.0
2015 6895 0.0 0.0 0.0
2016 5354 0.0 0.0 0.0
2017 4982 0.0 0.0 0.0
2018 2544 0.0 0.0 0.0
2019 3335 0.0 0.0 0.0
2020 348 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-28 No Incident Encountered 0.00 0.00
2012-11-25 No Incident Encountered 0.00 0.00

For data sources see[8]

References