X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615220805000

Well Details

Well ID: 0615220805000
Loading map...
Location: 00/05-08-061-22W5/0
Location Alias: 00/05-08-61-22 W5M
Location Alias 2: 00/05-08-061-22 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 22
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL BIGSTONE 5-8-61-22
Operator Name: Paramount Resources Ltd.
License Number: 0018174
License Date: 1959-11-24
License Status: Abandoned
Spud Date: 1959-12-06
Final Drill Date: 1960-03-10
Well Total Depth: 3460.40 m
Surface Hole Latitude: 54.259908
Surface Hole Longitude: -117.273696

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-24 Obtained License
1960-01-05 Drill Stem Test Performed
1960-01-06 Drill Stem Test Performed
1960-01-21 Drill Stem Test Performed
1960-02-19 Drill Stem Test Performed
1960-02-26 Drill Stem Test Performed
1960-03-01 Production Casing Operation Performed
1960-03-08 Drill Stem Test Performed
1960-03-10 Drill Stem Test Performed
1960-03-10 Finished Drilling
1960-07-05 Well Mode changed to Drilled and Cased
1974-11-16 Perforation Treatment Performed - Jet Perforation
1974-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-07 Well Began Production
1976-01-07 Well Fluid changed to Gas
1976-01-07 Well Mode changed to Flowing
1976-04-01 Well Fluid changed to Gas
1976-04-01 Well Mode changed to Suspended
1978-08-10 Well Fluid changed to Gas
1978-08-10 Well Mode changed to Flowing
1984-08-20 Well Log Performed
1984-08-24 Well Log Performed
1984-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-13 Perforation Treatment Performed - Jet Perforation
1994-09-13 Well Log Performed
1994-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-14 Plug Back Performed
1994-09-14 Well Fluid changed to Gas
1994-09-14 Well Mode changed to Abandoned Zone
1994-09-15 Well Log Performed
1994-09-17 Perforation Treatment Performed - Jet Perforation
1994-10-09 Well Log Performed
1994-10-13 Perforation Treatment Performed - Jet Perforation
1994-10-13 Well Log Performed
1994-10-14 Well Log Performed
1994-10-15 Perforation Treatment Performed - Cement Squeeze
1994-10-16 Perforation Treatment Performed - Jet Perforation
1994-10-17 Perforation Treatment Performed - Jet Perforation
1994-10-17 Well Log Performed
1994-10-18 Perforation Treatment Performed - Cement Squeeze
1994-10-18 Perforation Treatment Performed - Jet Perforation
1994-10-19 Well Log Performed
1994-10-21 Perforation Treatment Performed - Cement Squeeze
1994-10-31 Perforation Treatment Performed - Cement Squeeze
1994-10-31 Perforation Treatment Performed - Jet Perforation
1994-11-02 Well Log Performed
1994-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-03 Perforation Treatment Performed - Jet Perforation
1994-11-10 Perforation Treatment Performed - Fractured
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-12-01 Perforation Treatment Performed - Jet Perforation
1994-12-01 Well Log Performed
1996-12-06 Well Log Performed
1996-12-07 Perforation Treatment Performed - Jet Perforation
1996-12-14 Perforation Treatment Performed - Remedial Casing
1996-12-21 Perforation Treatment Performed - Jet Perforation
1997-01-08 Perforation Treatment Performed - Fractured
2010-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-24 Plug Back Performed
2010-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-13 Plug Back Performed
2010-03-15 Perforation Treatment Performed - Jet Perforation
2010-03-16 Perforation Treatment Performed - Cement Plug
2010-03-16 Perforation Treatment Performed - Jet Perforation
2010-03-16 Perforation Treatment Performed - Remedial Casing
2010-03-17 Perforation Treatment Performed - Cement Plug
2010-03-17 Perforation Treatment Performed - Remedial Casing
2010-03-18 Perforation Treatment Performed - Cement Plug
2010-03-18 Perforation Treatment Performed - Jet Perforation
2010-03-18 Perforation Treatment Performed - Remedial Casing
2010-03-19 Perforation Treatment Performed - Cement Plug
2010-03-19 Perforation Treatment Performed - Jet Perforation
2010-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-11-16 Perforation 3408.00 3411.00 7
1994-10-16 Perforation 2380.00 2381.00 18
1994-10-17 Perforation 2428.30 2429.30 17
1994-10-18 Cement Squeeze 2428.30 2429.30 0
1994-10-18 Cement Squeeze 2447.00 2448.00 0
1994-10-18 Perforation 2401.20 2402.20 18
1994-10-21 Cement Squeeze 2380.00 2381.00 0
1994-10-31 Cement Squeeze 2508.00 2509.00 0
1994-10-31 Perforation 2447.00 2448.00 18
1994-10-31 Cement Squeeze 2447.00 2448.00 0
1994-11-03 Packing Device Capped w/Cement 2505.00 2507.00 0
1974-11-19 Acid Treatment 3408.00 3411.00 0
1994-11-03 Perforation 2476.20 2486.20 18
1994-11-10 Fracture 2476.20 2486.20 0
1994-11-30 Perforation 2417.00 2429.30 18
1994-12-01 Perforation 2401.20 2408.50 18
1996-12-07 Perforation 466.00 467.00 13
1996-12-14 Remedial Casing Cementing 466.00 467.00 0
1996-12-21 Perforation 2401.20 2408.50 17
1996-12-21 Perforation 2417.00 2429.30 17
1997-01-08 Fracture 2401.20 2429.30 0
2010-02-24 Packing Device Capped w/Cement 2370.00 2384.00 0
1984-08-26 Packing Device Capped w/Cement 3278.00 3375.00 0
2010-03-13 Packing Device Capped w/Cement 2363.00 2371.00 0
2010-03-15 Perforation 2090.00 2091.00 17
2010-03-16 Remedial Casing Cementing 2090.00 2091.00 0
2010-03-16 Perforation 1945.00 1946.00 17
2010-03-16 Cement Plug 2068.00 2087.00 0
2010-03-17 Cement Plug 1923.00 1942.00 0
2010-03-17 Remedial Casing Cementing 1945.00 1946.00 0
2010-03-18 Perforation 1650.00 1651.00 17
2010-03-18 Cement Plug 1608.00 1646.00 0
2010-03-18 Remedial Casing Cementing 1650.00 1651.00 0
1984-09-13 Perforation 3408.00 3411.00 7
2010-03-19 Perforation 567.00 568.00 17
2010-03-19 Cement Plug 529.50 597.00 0
2010-03-21 Packing Device Capped w/Cement 455.00 463.00 0
1994-09-14 Packing Device Capped w/Cement 3237.00 3245.00 0
1994-09-17 Perforation 2476.20 2486.20 13
1994-10-13 Perforation 2508.00 2509.00 18
1994-10-13 Perforation 2447.00 2448.00 18
1994-10-15 Cement Squeeze 2476.20 2486.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 267 0.0 0.0 0.0
1979 229 0.0 0.0 0.0
1980 119 0.0 0.0 0.0
1982 2403 0.0 0.0 0.0
1983 3381 0.0 0.0 0.0
1984 2660 0.0 0.0 0.0
1985 758 0.0 0.0 0.0
1994 15 0.0 0.0 0.0

For data sources see[5]

References