If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615210916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.265289,"lon":-117.082016,"icon":""}]} |
Location: 00/16-09-061-21W5/0 | |
Location Alias: 00/16-09-61-21 W5M | |
Location Alias 2: 00/16-09-061-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 21 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CDN-SUP KAYBOBS 16-9-61-21 | |
Operator Name: ExxonMobil Canada Resources Company | |
License Number: 0087017 | |
License Date: 1980-11-13 | |
License Status: Abandoned | |
Spud Date: 1980-11-18 | |
Final Drill Date: 1980-12-08 | |
Well Total Depth: 2473.00 m | |
Surface Hole Latitude: 54.265289 | |
Surface Hole Longitude: -117.082016 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-13 | Obtained License |
1980-12-08 | Finished Drilling |
1980-12-10 | Drill Stem Test Performed |
1980-12-11 | Drill Stem Test Performed |
1980-12-12 | Drill Stem Test Performed |
1980-12-13 | Production Casing Operation Performed |
1981-03-07 | Perforation Treatment Performed - Jet Perforation |
1981-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-20 | Perforation Treatment Performed - Cement Squeeze |
1981-03-22 | Perforation Treatment Performed - Jet Perforation |
1981-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-05-19 | Perforation Treatment Performed - Cement Squeeze |
1981-05-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1981-05-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-05-27 | Perforation Treatment Performed - Cement Squeeze |
1981-05-27 | Perforation Treatment Performed - Jet Perforation |
1981-05-27 | Well Mode changed to Drilled and Cased |
1984-11-16 | Well Began Production |
1984-11-16 | Well Fluid changed to Gas |
1984-11-16 | Well Mode changed to Flowing |
1990-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-04-30 | Well Fluid changed to Gas |
1997-04-30 | Well Mode changed to Suspended |
2001-11-12 | Perforation Treatment Performed - Cement Squeeze |
2001-11-12 | Perforation Treatment Performed - Jet Perforation |
2001-11-12 | Well Log Performed |
2001-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-12-15 | Well Fluid changed to Gas |
2001-12-15 | Well Mode changed to Abandoned |
2001-12-18 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-03-07 | Perforation | 2397.00 | 2399.00 | 13 |
1981-05-25 | Acid Treatment | 2397.00 | 2398.00 | 0 |
1981-05-27 | Cement Squeeze | 2397.00 | 2398.00 | 0 |
1981-05-27 | Perforation | 2383.00 | 2386.00 | 6 |
1990-09-24 | Acid Treatment | 2383.00 | 2386.00 | 0 |
1990-09-25 | Acid Treatment | 2383.00 | 2385.00 | 0 |
2001-11-12 | Perforation | 393.00 | 394.00 | 17 |
2001-11-12 | Cement Squeeze | 393.00 | 394.00 | 0 |
2001-11-13 | Packing Device Capped w/Cement | 275.00 | 400.00 | 0 |
1981-03-07 | Perforation | 2400.00 | 2403.00 | 13 |
1981-03-14 | Acid Treatment | 2397.00 | 2403.00 | 0 |
1981-03-20 | Cement Squeeze | 2397.00 | 2403.00 | 0 |
1981-03-22 | Perforation | 2397.00 | 2399.00 | 13 |
1981-03-23 | Acid Treatment | 2397.00 | 2399.00 | 0 |
1981-05-19 | Cement Squeeze | 2397.00 | 2399.00 | 0 |
1981-05-22 | Hydra Jet Perforation | 2397.00 | 2398.00 | 0 |
1981-05-23 | Acid Treatment | 2397.00 | 2398.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 624 | 0.0 | 0.0 | 0.0 |
1985 | 382 | 0.0 | 0.0 | 0.0 |
1987 | 1337 | 0.0 | 0.0 | 0.0 |
1988 | 390 | 0.0 | 0.0 | 0.0 |
1989 | 203 | 0.0 | 0.0 | 0.0 |
1990 | 36 | 0.0 | 0.0 | 0.0 |
1991 | 5477 | 0.0 | 0.0 | 0.0 |
1992 | 4366 | 0.0 | 0.0 | 0.0 |
1993 | 6498 | 0.0 | 0.0 | 0.0 |
1994 | 7661 | 0.0 | 0.0 | 0.0 |
1995 | 5729 | 0.0 | 0.0 | 0.0 |
1996 | 6029 | 0.0 | 0.0 | 0.0 |
1997 | 2748 | 0.0 | 0.0 | 0.0 |
For data sources see[5]