X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615202110000

Well Details

Well ID: 0615202110000
Loading map...
Location: 00/10-21-061-20W5/0
Location Alias: 00/10-21-61-20 W5M
Location Alias 2: 00/10-21-061-20 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT KAYBOBS 10-21-61-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0098145
License Date: 1982-10-21
License Status: Suspension
Spud Date: 1982-10-22
Final Drill Date: 1982-11-29
Well Total Depth: 3327.50 m
Surface Hole Latitude: 54.293721
Surface Hole Longitude: -116.933315

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-21 Obtained License
1982-11-07 Drill Stem Test Performed
1982-11-29 Finished Drilling
1982-12-03 Production Casing Operation Performed
1982-12-20 Perforation Treatment Performed - Jet Perforation
1982-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-04 Perforation Treatment Performed - Jet Perforation
1983-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-28 Perforation Treatment Performed - Cement Squeeze
1983-01-31 Perforation Treatment Performed - Cement Squeeze
1983-02-08 Perforation Treatment Performed - Fractured
1983-02-08 Perforation Treatment Performed - Open-Hole Completion
1983-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-02 Well Mode changed to Drilled and Cased
1993-05-08 Perforation Treatment Performed - Jet Perforation
1993-10-25 Well Began Production
1993-10-25 Well Fluid changed to Gas
1993-10-25 Well Mode changed to Flowing
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-20 Perforation 3301.00 3305.00 13
1993-05-08 Perforation 2088.50 2095.50 13
1982-12-27 Acid Treatment 3301.00 3305.00 0
1983-01-04 Perforation 3312.00 3315.00 13
1983-01-06 Acid Treatment 3312.00 3315.00 0
1983-01-28 Cement Squeeze 3301.00 3315.00 0
1983-01-31 Cement Squeeze 3301.00 3315.00 0
1983-02-08 Open Hole/Barefoot Completion 3323.00 3327.50 0
1983-02-08 Fracture 3323.00 3327.50 0
1983-03-02 Packing Device Capped w/Cement 3282.00 3290.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1325 0.0 0.0 0.0
1994 7243 0.0 0.0 0.0
1995 8263 0.0 0.0 0.0
1996 8177 0.0 0.0 0.0
1997 7707 0.0 0.0 0.0
1998 6578 0.0 0.0 0.0
1999 7585 0.0 0.0 0.0
2000 8629 0.0 0.0 0.0
2001 8531 0.0 0.0 0.0
2002 2949 0.0 0.0 0.0
2003 8012 0.0 0.0 0.0
2004 8460 0.0 0.0 0.0
2005 6834 0.0 0.0 0.0
2006 8466 0.0 0.0 0.0
2007 8716 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 7471 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8279 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 3551 0.0 0.0 0.0

For data sources see[5]

References