If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615200908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.260998,"lon":-116.928755,"icon":""}]} |
Location: 00/08-09-061-20W5/0 | |
Location Alias: 00/08-09-61-20 W5M | |
Location Alias 2: 00/08-09-061-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 20 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ACL KAYBOBS 8-9-61-20 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0138748 | |
License Date: 1989-02-13 | |
License Status: Issued | |
Spud Date: 1989-02-21 | |
Final Drill Date: 1989-03-12 | |
Well Total Depth: 2250.00 m | |
Surface Hole Latitude: 54.260998 | |
Surface Hole Longitude: -116.928755 |
Date | Event |
---|---|
1989-02-13 | Obtained License |
1989-02-24 | Surface Casing Operation Performed |
1989-02-25 | Direction Drilling Operation Performed - Deviate |
1989-03-12 | Finished Drilling |
1989-03-12 | Well Mode changed to Drilled and Cased |
1989-03-15 | Well Log Performed |
1989-03-16 | Well Log Performed |
1989-03-17 | Well Log Performed |
1989-03-18 | Production Casing Operation Performed |
1989-03-18 | Rig Released |
1989-12-16 | Well Log Performed |
1989-12-18 | Well Log Performed |
1989-12-19 | Perforation Treatment Performed - Jet Perforation |
1990-01-17 | Perforation Treatment Performed - Fractured |
1990-11-15 | Well Began Production |
1990-11-15 | Well Fluid changed to Gas |
1990-11-15 | Well Mode changed to Flowing |
1996-07-05 | Well Log Performed |
1996-07-07 | Perforation Treatment Performed - Jet Perforation |
1996-07-07 | Well Fluid changed to Gas |
1996-07-07 | Well Mode changed to Flowing |
1996-07-10 | Perforation Treatment Performed - Fractured |
1996-07-14 | Well Log Performed |
1996-07-19 | Perforation Treatment Performed - Chemical Squeeze |
2004-01-01 | Well Fluid changed to Gas |
2004-01-01 | Well Mode changed to Pumping |
2005-11-10 | Well Log Performed |
2005-11-11 | Well Log Performed |
2005-11-12 | Perforation Treatment Performed - Jet Perforation |
2005-11-13 | Perforation Treatment Performed - Fractured |
2006-03-30 | Well Fluid changed to Gas |
2006-03-30 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1989-02-25 | 400.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-12-19 | Perforation | 2168.00 | 2168.50 | 13 |
1996-07-19 | Chemical Squeeze | 2114.00 | 2119.00 | 0 |
2005-11-12 | Perforation | 1899.00 | 1901.00 | 20 |
2005-11-12 | Perforation | 1906.00 | 1907.00 | 20 |
2005-11-13 | Fracture | 1899.00 | 1907.00 | 0 |
1989-12-19 | Perforation | 2169.00 | 2170.00 | 13 |
1989-12-19 | Perforation | 2170.50 | 2172.00 | 13 |
1989-12-19 | Perforation | 2173.00 | 2174.20 | 13 |
1989-12-19 | Perforation | 2175.00 | 2177.20 | 13 |
1990-01-17 | Fracture | 2168.00 | 2177.20 | 0 |
1996-07-07 | Perforation | 2114.00 | 2115.00 | 18 |
1996-07-07 | Perforation | 2116.00 | 2119.00 | 18 |
1996-07-10 | Fracture | 2114.00 | 2119.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 853 | 0.0 | 0.0 | 0.0 |
1991 | 7385 | 0.0 | 0.0 | 0.0 |
1992 | 6899 | 0.0 | 0.0 | 0.0 |
1993 | 8470 | 0.0 | 0.0 | 0.0 |
1994 | 8430 | 0.0 | 0.0 | 0.0 |
1995 | 8307 | 0.0 | 0.0 | 0.0 |
1996 | 7878 | 0.0 | 0.0 | 0.0 |
1997 | 8422 | 0.0 | 0.0 | 0.0 |
1998 | 8330 | 0.0 | 0.0 | 0.0 |
1999 | 8590 | 0.0 | 0.0 | 0.0 |
2000 | 8584 | 0.0 | 0.0 | 0.0 |
2001 | 8601 | 0.0 | 0.0 | 0.0 |
2002 | 8162 | 0.0 | 0.0 | 0.0 |
2003 | 8371 | 0.0 | 0.0 | 0.0 |
2004 | 7362 | 0.0 | 0.0 | 0.0 |
2005 | 7267 | 0.0 | 0.0 | 0.0 |
2006 | 3971 | 0.0 | 0.0 | 0.0 |
2007 | 7016 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8215 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 7987 | 0.0 | 0.0 | 0.0 |
2013 | 8231 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8346 | 0.0 | 0.0 | 0.0 |
2016 | 6193 | 0.0 | 0.0 | 0.0 |
2017 | 6823 | 0.0 | 0.0 | 0.0 |
2018 | 4222 | 0.0 | 0.0 | 0.0 |
2019 | 4865 | 0.0 | 0.0 | 0.0 |
2020 | 266 | 0.0 | 0.0 | 0.0 |
For data sources see[6]