X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615200204020

Well Details

Well ID: 0615200204020
Loading map...
Location: 02/04-02-061-20W5/0
Location Alias: 02/04-02-61-20 W5M
Location Alias 2: 02/04-02-061-20 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL 102 HZ KAYBOBS 4-2-61-20
Operator Name: Paramount Resources Ltd.
License Number: 0470246
License Date: 2014-09-26
License Status: Amended
Spud Date: 2014-10-14
Final Drill Date: 2014-10-30
Well Total Depth: 3493.00 m
Surface Hole Latitude: 54.246361
Surface Hole Longitude: -116.871252

For data sources see[1][2]

Well History

Date Event
2014-09-26 Obtained License
2014-10-16 Surface Casing Operation Performed
2014-10-17 Direction Drilling Operation Performed - Deviate
2014-10-22 Direction Drilling Operation Performed - Horizontal
2014-10-22 Well Log Performed
2014-10-23 Well Log Performed
2014-10-24 Intermediate Casing Operation Performed
2014-10-24 Well Log Performed
2014-10-30 Finished Drilling
2014-10-30 Well Log Performed
2014-10-30 Well Mode changed to Drilled and Cased
2014-10-31 Perforation Treatment Performed - Jet Perforation
2014-11-02 Liner Casing Operation Performed
2014-11-02 Perforation Treatment Performed - Open-Hole Completion
2014-11-03 Rig Released
2014-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-19 Well Fluid changed to Gas
2014-11-19 Well Mode changed to Testing
2014-12-01 Well Fluid changed to Gas
2014-12-01 Well Mode changed to Test Completed
2015-04-10 Well Began Production
2015-04-10 Well Fluid changed to Gas
2015-04-10 Well Mode changed to Flowing
2015-08-07 Well Fluid changed to Gas
2015-08-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-14 Nabors Drilling Limited 21 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-17 543.00 Deviate (5 - 79 degrees)
2014-10-22 2453.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-31 Perforation 2122.00 2128.00 20
2014-11-18 Multi-Stage Fracture 2870.50 2870.60 0
2014-11-19 Multi-Stage Fracture 2805.00 2805.10 0
2014-11-19 Multi-Stage Fracture 2711.30 2711.40 0
2014-11-19 Multi-Stage Fracture 2632.00 2632.10 0
2014-11-19 Multi-Stage Fracture 2540.90 2541.00 0
2014-11-02 Open Hole/Barefoot Completion 3475.00 3493.00 0
2014-11-18 Multi-Stage Fracture 3470.30 3470.40 0
2014-11-18 Multi-Stage Fracture 3399.30 3399.40 0
2014-11-18 Multi-Stage Fracture 3310.60 3310.70 0
2014-11-18 Multi-Stage Fracture 3242.80 3242.90 0
2014-11-18 Multi-Stage Fracture 3137.20 3137.30 0
2014-11-18 Multi-Stage Fracture 3042.30 3042.40 0
2014-11-18 Multi-Stage Fracture 2935.20 2935.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-18 2014-11-19 2,195 1,087 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 41.4528 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 22.9813 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.4596 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0402 N/A
Methanol 67-56-1 100 0.0402 N/A
Water 7732-18-5 100 0.0402 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0057 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0912 N/A
FP-13L Baker Hughes Defoamer Tributyl phosphate 126-73-8 100 0.0014 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 34.6444 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1774 N/A
Oxyalkylated alcohol 9014 100 0.1774 N/A
Petroleum distillates 64742-47-8 100 0.1774 N/A
Polyacrylate 9014 100 0.1774 N/A
FAW-26 Baker Hughes Surfactant 1-Butoxy-2-propanol 5131-66-8 100 0.1456 N/A
Diethanolamine 111-42-2 100 0.1457 N/A
Ethanol 64-17-5 100 0.1456 N/A
Methanol 67-56-1 100 0.1456 N/A
Polyoxyalkylene sulfate 68891-29-2 100 0.1456 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-13 2014-11-14 Surface Water - River 410
2014-11-12 2014-11-13 Surface Water - Runoff 770

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 119 0.0 0.0 0.0
2015 6191 0.0 0.0 0.0
2016 8203 0.0 0.0 0.0
2017 7722 0.0 0.0 0.0
2018 7959 0.0 0.0 0.0
2019 8279 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-03 No Incident Encountered 0.00 0.00
2014-12-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References