X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615183602000

Well Details

Well ID: 0615183602000
Loading map...
Location: 00/02-36-061-18W5/0
Location Alias: 00/02-36-61-18 W5M
Location Alias 2: 00/02-36-061-18 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 18
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT HZ FOXCK 2-36-61-18
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0418465
License Date: 2010-02-10
License Status: Issued
Spud Date: 2010-03-20
Final Drill Date: 2010-04-07
Well Total Depth: 3267.00 m
Surface Hole Latitude: 54.324040
Surface Hole Longitude: -116.573067

For data sources see[1][2]

Well History

Date Event
2010-02-10 Obtained License
2010-03-23 Surface Casing Operation Performed
2010-03-26 Direction Drilling Operation Performed - Horizontal
2010-04-07 Finished Drilling
2010-04-07 Well Log Performed
2010-04-07 Well Mode changed to Drilled and Cased
2010-04-08 Well Log Performed
2010-04-17 Production Casing Operation Performed
2010-04-17 Rig Released
2010-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-06-24 Perforation Treatment Performed - Open-Hole Completion
2010-07-25 Well Began Production
2010-07-25 Well Fluid changed to Gas
2010-07-25 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-26 1723.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-24 Open Hole/Barefoot Completion 3266.00 3267.00 0
2010-06-24 Multi-Stage Fracture 2360.20 2360.30 0
2010-06-24 Multi-Stage Fracture 2296.20 2296.30 0
2010-06-24 Multi-Stage Fracture 2222.70 2222.80 0
2010-06-24 Multi-Stage Fracture 3216.70 3216.80 0
2010-06-24 Multi-Stage Fracture 3130.90 3131.00 0
2010-06-24 Multi-Stage Fracture 3012.60 3012.70 0
2010-06-24 Multi-Stage Fracture 2915.50 2915.60 0
2010-06-24 Multi-Stage Fracture 2818.80 2818.90 0
2010-06-24 Multi-Stage Fracture 2710.60 2710.70 0
2010-06-24 Multi-Stage Fracture 2579.30 2579.40 0
2010-06-24 Multi-Stage Fracture 2503.90 2504.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3807 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8015 0.0 0.0 0.0
2013 7609 0.0 0.0 0.0
2014 7347 0.0 0.0 0.0
2015 8098 0.0 0.0 0.0
2016 8241 0.0 0.0 0.0
2017 5593 0.0 0.0 0.0
2018 3279 0.0 0.0 0.0
2019 6988 0.0 0.0 0.0
2020 1955 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-06-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References