X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615050908002

Well Details

Well ID: 0615050908002
Loading map...
Location: 00/08-09-061-05W5/2
Location Alias: 00/08-09-61-05 W5M
Location Alias 2: 00/08-09-061-05 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 05
Section: 09
County/Municipality: County of Barrhead No. 11
Well Name: WLEC NEERLND 8-9-61-5
Operator Name: West Lake Energy Corp.
License Number: 0200714
License Date: 1997-04-28
License Status: Suspension
Spud Date: 1997-06-01
Final Drill Date: 1997-06-06
Well Total Depth: 1225.50 m
Surface Hole Latitude: 54.261985
Surface Hole Longitude: -114.681752

For data sources see[1][2]

Well History

Date Event
1997-04-28 Obtained License
1997-06-01 Lost Circulation Occurred
1997-06-02 Direction Drilling Operation Performed - Deviate
1997-06-02 Surface Casing Operation Performed
1997-06-06 Finished Drilling
1997-06-06 Well Log Performed
1997-06-06 Well Mode changed to Drilled and Cased
1997-06-07 Drill Stem Test Performed
1997-06-08 Drill Stem Test Performed
1997-06-08 Well Log Performed
1997-06-09 Production Casing Operation Performed
1997-06-09 Rig Released
1997-07-22 Perforation Treatment Performed - Open-Hole Completion
1997-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-24 Well Log Performed
1997-07-25 Perforation Treatment Performed - Jet Perforation
1997-07-25 Well Log Performed
1997-07-26 Perforation Treatment Performed - Acid Wash - No Pressure
1997-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-28 Plug Back Performed
1997-07-28 Well Log Performed
1997-07-29 Perforation Treatment Performed - Acid Wash - No Pressure
1997-09-16 Well Began Production
1997-09-16 Well Fluid changed to Gas
1997-09-16 Well Mode changed to Flowing
1997-10-15 Well Log Performed
1998-03-22 Perforation Treatment Performed - Jet Perforation
1999-05-01 Well Fluid changed to Gas
1999-05-01 Well Mode changed to Flowing
1999-05-02 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-02 211.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-22 Open Hole/Barefoot Completion 1224.00 1225.50 0
1998-03-22 Perforation 1192.00 1194.70 13
1997-07-23 Acid Treatment 1224.00 1225.50 0
1997-07-25 Perforation 1207.00 1210.00 14
1997-07-25 Perforation 1211.50 1213.00 14
1997-07-25 Perforation 1216.00 1217.00 14
1997-07-25 Perforation 1218.00 1219.00 14
1997-07-26 Acid Wash 1216.00 1219.00 0
1997-07-28 Packing Device Capped w/Cement 1217.50 1220.50 0
1997-07-29 Acid Wash 1207.00 1213.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2358 0.0 0.0 0.0
1998 1847 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-06-01 Lost Circulation 182.00 198.00

For data sources see[7]

References