X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614223407000

Well Details

Well ID: 0614223407000
Loading map...
Location: 00/07-34-061-22W4/0
Location Alias: 00/07-34-61-22 W4M
Location Alias 2: 00/07-34-061-22 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 22
Section: 34
County/Municipality: Thorhild County
Well Name: CCOL ABEE 7-34-61-22
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0039485
License Date: 1970-12-31
License Status: RecCertified
Spud Date: 1971-01-06
Final Drill Date: 1971-01-12
Well Total Depth: 926.30 m
Surface Hole Latitude: 54.316073
Surface Hole Longitude: -113.207011

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-12-31 Obtained License
1971-01-12 Finished Drilling
1971-01-15 Drill Stem Test Performed
1971-01-16 Production Casing Operation Performed
1971-01-17 Well Mode changed to Drilled and Cased
1975-03-05 Well Mode changed to Drilled and Cased
1975-03-08 Perforation Treatment Performed - Jet Perforation
1976-11-19 Well Began Production
1976-11-19 Well Fluid changed to Gas
1976-11-19 Well Mode changed to Flowing
1979-04-01 Well Fluid changed to Gas
1979-04-01 Well Mode changed to Suspended
1979-11-08 Perforation Treatment Performed - Jet Perforation
1979-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-09 Perforation Treatment Performed - Cement Squeeze
1979-11-12 Perforation Treatment Performed - Jet Perforation
1979-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-24 Well Abandoned
1983-08-24 Well Fluid changed to Gas
1983-08-24 Well Mode changed to Abandoned
1983-08-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-08 Perforation 728.50 729.10 7
1979-11-08 Perforation 790.00 792.00 7
1979-11-09 Acid Treatment 728.50 792.00 0
1979-11-09 Cement Squeeze 728.50 792.00 0
1979-11-12 Perforation 728.50 729.10 7
1979-11-15 Acid Treatment 728.50 729.10 0
1983-08-24 Packing Device Capped w/Cement 713.00 721.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1015 0.0 0.0 0.0
1977 8247 0.0 0.0 0.0
1978 8157 0.0 0.0 0.0
1979 1816 0.0 0.0 0.0
1980 3957 0.0 0.0 0.0

For data sources see[5]

References