X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614223307002

Well Details

Well ID: 0614223307002
Loading map...
Location: 00/07-33-061-22W4/2
Location Alias: 00/07-33-61-22 W4M
Location Alias 2: 00/07-33-061-22 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 22
Section: 33
County/Municipality: Thorhild County
Well Name: CCOL THUMPER ABEE 7-33-61-22
Operator Name: Canadian Natural Resources Limited
License Number: 0055082
License Date: 1975-09-24
License Status: RecCertified
Spud Date: 1975-10-06
Final Drill Date: 1975-10-09
Well Total Depth: 870.80 m
Surface Hole Latitude: 54.316137
Surface Hole Longitude: -113.232025

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-24 Obtained License
1975-10-09 Finished Drilling
1975-10-09 Well Mode changed to Drilled and Cased
1975-10-10 Drill Stem Test Performed
1975-10-11 Production Casing Operation Performed
1975-12-08 Perforation Treatment Performed - Jet Perforation
1975-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-12-13 Perforation Treatment Performed - Jet Perforation
1975-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-12-14 Perforation Treatment Performed - Jet Perforation
1975-12-16 Perforation Treatment Performed - Acid Wash - No Pressure
1975-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-08 Perforation Treatment Performed - Jet Perforation
1976-11-19 Well Began Production
1976-11-19 Well Fluid changed to Gas
1976-11-19 Well Mode changed to Flowing
1977-11-08 Perforation Treatment Performed - Condensate Squeeze
1977-12-09 Well Fluid changed to Gas
1977-12-09 Well Mode changed to Suspended
1982-06-21 Perforation Treatment Performed - Cement Squeeze
1999-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-08 Perforation Treatment Performed - Jet Perforation
1999-08-08 Plug Back Performed
1999-08-08 Well Log Performed
1999-08-09 Perforation Treatment Performed - Cement Plug
1999-08-09 Perforation Treatment Performed - Remedial Casing
1999-08-10 Well Abandoned
1999-08-10 Well Fluid changed to Gas
1999-08-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-08 Perforation 826.00 826.90 7
1975-12-21 Acid Treatment 774.20 776.90 0
1976-01-08 Perforation 734.90 736.70 7
1977-11-08 Condensate Squeeze 734.90 736.70 0
1982-06-21 Cement Squeeze 734.90 736.70 0
1999-08-08 Packing Device Capped w/Cement 759.00 767.00 0
1999-08-08 Packing Device Capped w/Cement 722.00 730.00 0
1999-08-08 Perforation 230.00 231.00 13
1999-08-09 Remedial Casing Cementing 230.00 231.00 0
1999-08-09 Cement Plug 201.00 233.00 0
1975-12-10 Acid Treatment 826.00 826.90 0
1975-12-13 Packing Device Capped w/Cement 810.80 818.40 0
1975-12-13 Perforation 797.10 797.70 7
1975-12-13 Perforation 798.30 800.10 7
1975-12-14 Packing Device Capped w/Cement 781.80 789.40 0
1975-12-14 Perforation 774.20 775.40 7
1975-12-14 Perforation 776.00 776.90 7
1975-12-16 Acid Wash 774.20 776.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1000 0.0 0.0 0.0
1977 1567 0.0 0.0 0.0
1981 0 0.0 0.0 0.0

For data sources see[5]

References