X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614222910002

Well Details

Well ID: 0614222910002
Loading map...
Location: 00/10-29-061-22W4/2
Location Alias: 00/10-29-61-22 W4M
Location Alias 2: 00/10-29-061-22 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 22
Section: 29
County/Municipality: Thorhild County
Well Name: IDC ABEE 10-29-61-22
Operator Name: Inland Development Company Ltd
License Number: 0051140
License Date: 1974-09-12
License Status: Issued
Spud Date: 1974-09-13
Final Drill Date: 1975-06-12
Well Total Depth: 844.30 m
Surface Hole Latitude: 54.308440
Surface Hole Longitude: -113.257955

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-09-12 Obtained License
1975-06-12 Finished Drilling
1975-06-12 Well Mode changed to Drilled and Cased
1975-06-14 Drill Stem Test Performed
1975-06-14 Well Log Performed
1975-06-17 Production Casing Operation Performed
1976-01-22 Perforation Treatment Performed - Jet Perforation
1976-01-23 Perforation Treatment Performed - Cement Squeeze
1976-01-24 Perforation Treatment Performed - Cement Squeeze
1976-01-24 Perforation Treatment Performed - Jet Perforation
1976-01-25 Perforation Treatment Performed - Cement Squeeze
1976-01-25 Perforation Treatment Performed - Jet Perforation
1976-01-29 Perforation Treatment Performed - Jet Perforation
1976-02-02 Perforation Treatment Performed - Acid Wash - No Pressure
1976-02-03 Perforation Treatment Performed - Jet Perforation
1976-02-05 Perforation Treatment Performed - Jet Perforation
1976-11-19 Well Began Production
1976-11-19 Well Fluid changed to Gas
1976-11-19 Well Mode changed to Flowing
1982-12-13 Well Fluid changed to Gas
1982-12-13 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-22 Perforation 818.10 819.30 7
1976-02-03 Perforation 773.60 775.40 7
1976-02-05 Perforation 730.30 732.70 7
1976-01-23 Cement Squeeze 818.10 819.30 0
1976-01-24 Perforation 776.60 777.80 7
1976-01-24 Cement Squeeze 776.60 777.80 0
1976-01-25 Perforation 734.60 735.80 7
1976-01-25 Cement Squeeze 734.60 735.80 0
1976-01-29 Perforation 814.40 817.50 7
1976-02-02 Acid Wash 814.40 817.50 0
1976-02-03 Perforation 769.30 772.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 990 0.0 0.0 0.0
1977 8307 0.0 0.0 0.0
1978 7667 0.0 0.0 0.0
1979 4744 0.0 0.0 0.0
1980 8564 0.0 0.0 0.0
1981 7213 0.0 0.0 0.0
1982 4931 0.0 0.0 0.0
1983 330 0.0 0.0 0.0

For data sources see[5]

References