X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614200608002

Well Details

Well ID: 0614200608002
Loading map...
Location: 00/08-06-061-20W4/2
Location Alias: 00/08-06-61-20 W4M
Location Alias 2: 00/08-06-061-20 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 20
Section: 06
County/Municipality: Thorhild County
Well Name: ACL HOLLOW 8-6-61-20
Operator Name: Paramount Resources Ltd.
License Number: 0140723
License Date: 1989-08-23
License Status: Abandoned
Spud Date: 1989-08-26
Final Drill Date: 1989-08-28
Well Total Depth: 755.00 m
Surface Hole Latitude: 54.243307
Surface Hole Longitude: -112.977949

For data sources see[1][2]

Well History

Date Event
1989-08-23 Obtained License
1989-08-27 Surface Casing Operation Performed
1989-08-28 Finished Drilling
1989-08-28 Well Log Performed
1989-08-28 Well Mode changed to Drilled and Cased
1989-08-29 Drill Stem Test Performed
1989-08-30 Production Casing Operation Performed
1989-08-30 Rig Released
1989-09-16 Perforation Treatment Performed - Jet Perforation
1989-09-16 Perforation Treatment Performed - Remedial Casing
1989-09-19 Perforation Treatment Performed - Jet Perforation
1993-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-10 Perforation Treatment Performed - Jet Perforation
1993-11-10 Plug Back Performed
1993-11-10 Well Began Production
1993-11-10 Well Fluid changed to Gas
1993-11-10 Well Mode changed to Flowing
1994-08-08 Well Fluid changed to Gas
1994-08-08 Well Mode changed to Suspended
1995-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-16 Plug Back Performed
1995-10-16 Well Abandoned
1995-10-16 Well Fluid changed to Gas
1995-10-16 Well Mode changed to Abandoned
1996-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-09-16 Perforation 475.00 476.00 13
1989-09-16 Remedial Casing Cementing 475.00 476.00 0
1989-09-19 Perforation 736.50 738.00 13
1993-11-10 Packing Device Capped w/Cement 723.00 731.00 0
1993-11-10 Perforation 701.00 702.50 13
1995-10-16 Packing Device Capped w/Cement 687.00 695.00 0
1996-02-26 Packing Device Capped w/Cement 670.00 678.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1213 0.0 0.0 0.0
1994 3400 0.0 0.0 0.0

For data sources see[5]

References