X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614152208002

Well Details

Well ID: 0614152208002
Loading map...
Location: 00/08-22-061-15W4/2
Location Alias: 00/08-22-61-15 W4M
Location Alias 2: 00/08-22-061-15 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 15
Section: 22
County/Municipality: Smoky Lake County
Well Name: CNRL EDWAND 8-22-61-15
Operator Name: Canadian Natural Resources Limited
License Number: 0088601
License Date: 1981-01-28
License Status: Suspension
Spud Date: 1981-02-17
Final Drill Date: 1981-02-19
Well Total Depth: 660.90 m
Surface Hole Latitude: 54.286146
Surface Hole Longitude: -112.155167

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-28 Obtained License
1981-02-19 Finished Drilling
1981-02-19 Well Mode changed to Drilled and Cased
1981-02-20 Drill Stem Test Performed
1981-02-21 Drill Stem Test Performed
1981-02-21 Production Casing Operation Performed
1982-04-10 Perforation Treatment Performed - Jet Perforation
1983-03-13 Perforation Treatment Performed - Open-Hole Completion
1983-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-21 Perforation Treatment Performed - Jet Perforation
1984-02-25 Perforation Treatment Performed - Jet Perforation
1985-05-03 Well Began Production
1985-05-03 Well Fluid changed to Gas
1985-05-03 Well Mode changed to Flowing
1998-06-22 Well Log Performed
2001-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-22 Perforation Treatment Performed - Jet Perforation
2001-08-22 Plug Back Performed
2001-08-22 Well Fluid changed to Gas
2001-08-22 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-04-10 Perforation 603.00 609.00 13
1983-03-13 Open Hole/Barefoot Completion 611.00 660.90 0
1983-03-15 Packing Device Capped w/Cement 590.00 590.00 0
1984-02-21 Perforation 530.50 532.00 13
1984-02-25 Perforation 491.50 494.50 13
2001-08-22 Packing Device Capped w/Cement 472.00 480.00 0
2001-08-22 Perforation 450.00 451.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2156 0.0 0.0 0.0
1986 2579 0.0 0.0 0.0
1987 3611 0.0 0.0 0.0
1988 2130 0.0 0.0 0.0
1989 276 0.0 0.0 0.0
1990 4483 0.0 0.0 0.0
1991 2065 0.0 0.0 0.0
1992 4534 0.0 0.0 0.0
1993 6334 0.0 0.0 0.0
1994 8220 0.0 0.0 0.0
1995 8719 0.0 0.0 0.0
1996 6542 0.0 0.0 0.0
1997 3573 0.0 0.0 0.0
1998 3619 0.0 0.0 0.0

For data sources see[5]

References