X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614133010000

Well Details

Well ID: 0614133010000
Loading map...
Location: 00/10-30-061-13W4/0
Location Alias: 00/10-30-61-13 W4M
Location Alias 2: 00/10-30-061-13 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 13
Section: 30
County/Municipality: Smoky Lake County
Well Name: BANKENO ET AL CORRIN 10-30-61-13
Operator Name: Canadian Natural Resources Limited
License Number: 0127580
License Date: 1987-07-27
License Status: RecCertified
Spud Date: 1987-08-05
Final Drill Date: 1987-08-07
Well Total Depth: 651.00 m
Surface Hole Latitude: 54.304436
Surface Hole Longitude: -111.936216

For data sources see[1][2]

Well History

Date Event
1987-07-27 Obtained License
1987-08-05 Surface Casing Operation Performed
1987-08-07 Finished Drilling
1987-08-07 Well Log Performed
1987-08-08 Drill Stem Test Performed
1987-08-08 Production Casing Operation Performed
1987-08-09 Rig Released
1987-09-01 Perforation Treatment Performed - Jet Perforation
1987-09-01 Well Log Performed
1987-09-01 Well Mode changed to Drilled and Cased
1987-11-20 Well Began Production
1987-11-20 Well Fluid changed to Gas
1987-11-20 Well Mode changed to Flowing
1995-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-19 Perforation Treatment Performed - Jet Perforation
1995-10-19 Perforation Treatment Performed - Remedial Casing
1995-10-19 Plug Back Performed
1995-12-01 Well Fluid changed to Gas
1995-12-01 Well Mode changed to Suspended
1997-04-15 Well Abandoned
1997-04-15 Well Fluid changed to Gas
1997-04-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-09-01 Perforation 576.00 579.00 13
1987-09-01 Perforation 566.50 573.00 13
1995-10-19 Packing Device Capped w/Cement 545.50 553.50 0
1995-10-19 Perforation 225.00 226.00 13
1995-10-19 Acid Treatment 225.00 226.00 0
1995-10-19 Remedial Casing Cementing 225.00 226.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 231 0.0 0.0 0.0
1988 4605 0.0 0.0 0.0
1989 8162 0.0 0.0 0.0
1990 8758 0.0 0.0 0.0
1991 8323 0.0 0.0 0.0
1992 8691 0.0 0.0 0.0
1993 8678 0.0 0.0 0.0
1994 3154 0.0 0.0 0.0

For data sources see[5]

References