X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614132907000

Well Details

Well ID: 0614132907000
Loading map...
Location: 00/07-29-061-13W4/0
Location Alias: 00/07-29-61-13 W4M
Location Alias 2: 00/07-29-061-13 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 13
Section: 29
County/Municipality: Smoky Lake County
Well Name: BANKENO AMOCO SPEDDEN 7-29-61-13
Operator Name: Canadian Natural Resources Limited
License Number: 0062509
License Date: 1977-02-01
License Status: RecCertified
Spud Date: 1977-02-03
Final Drill Date: 1977-02-06
Well Total Depth: 627.90 m
Surface Hole Latitude: 54.303630
Surface Hole Longitude: -111.911535

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-01 Obtained License
1977-02-05 Drill Stem Test Performed
1977-02-06 Finished Drilling
1977-02-07 Drill Stem Test Performed
1977-02-08 Production Casing Operation Performed
1977-08-23 Well Mode changed to Drilled and Cased
1988-12-08 Well Log Performed
1988-12-20 Perforation Treatment Performed - Jet Perforation
1988-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-21 Well Log Performed
1988-12-22 Perforation Treatment Performed - Jet Perforation
1989-06-15 Well Began Production
1989-06-15 Well Fluid changed to Gas
1989-06-15 Well Mode changed to Flowing
1994-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-21 Perforation Treatment Performed - Jet Perforation
1994-07-21 Plug Back Performed
1994-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-22 Perforation Treatment Performed - Jet Perforation
1994-07-22 Perforation Treatment Performed - Remedial Casing
1994-07-22 Plug Back Performed
1994-07-22 Well Fluid changed to Gas
1994-07-22 Well Mode changed to Abandoned
1994-11-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-12-20 Perforation 557.70 559.70 13
1988-12-21 Acid Treatment 557.70 559.70 0
1988-12-22 Perforation 550.00 554.10 13
1994-07-21 Packing Device Capped w/Cement 537.00 545.00 0
1994-07-21 Perforation 298.00 299.00 13
1994-07-22 Packing Device Capped w/Cement 280.00 288.00 0
1994-07-22 Perforation 207.00 208.00 13
1994-07-22 Remedial Casing Cementing 207.00 208.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 3839 0.0 0.0 0.0
1990 5997 0.0 0.0 0.0
1991 5737 0.0 0.0 0.0
1992 1517 0.0 0.0 0.0

For data sources see[5]

References