X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614072514002

Well Details

Well ID: 0614072514002
Loading map...
Location: 00/14-25-061-07W4/2
Location Alias: 00/14-25-61-07 W4M
Location Alias 2: 00/14-25-061-07 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 07
Section: 25
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CRESCENT POINT FORSYTH 14-25-61-7
Operator Name: Crescent Point Energy Corp.
License Number: 0144474
License Date: 1990-06-15
License Status: Abandoned
Spud Date: 1990-06-16
Final Drill Date: 1990-06-17
Well Total Depth: 459.00 m
Surface Hole Latitude: 54.308884
Surface Hole Longitude: -110.918482

For data sources see[1][2]

Well History

Date Event
1990-06-15 Obtained License
1990-06-17 Finished Drilling
1990-06-17 Surface Casing Operation Performed
1990-06-17 Well Mode changed to Drilled and Cased
1990-06-18 Well Log Performed
1990-06-19 Drill Stem Test Performed
1990-06-20 Production Casing Operation Performed
1990-06-20 Rig Released
1991-11-29 Well Log Performed
1991-12-01 Perforation Treatment Performed - Jet Perforation
1992-12-01 Well Began Production
1992-12-01 Well Fluid changed to Gas
1992-12-01 Well Mode changed to Flowing
1995-01-21 Perforation Treatment Performed - Jet Perforation
1995-01-21 Well Fluid changed to Gas
1995-01-21 Well Log Performed
1995-01-21 Well Mode changed to Flowing
2000-07-01 Well Structure changed to Commingled
2015-09-16 Well Log Performed
2015-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-17 Plug Back Performed
2015-09-17 Well Log Performed
2015-09-17 Well Mode changed to Abandoned Zone
2015-09-17 Well Structure changed to Commingled
2015-09-18 Well Log Performed
2015-09-21 Perforation Treatment Performed - Jet Perforation
2015-09-21 Well Log Performed
2015-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-22 Perforation Treatment Performed - Cement Squeeze
2015-09-22 Plug Back Performed
2015-09-23 Perforation Treatment Performed - Jet Perforation
2015-09-23 Well Log Performed
2015-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-24 Perforation Treatment Performed - Cement Squeeze
2015-09-24 Plug Back Performed
2015-09-28 Perforation Treatment Performed - Jet Perforation
2015-09-28 Well Log Performed
2015-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-29 Perforation Treatment Performed - Cement Squeeze
2015-09-29 Plug Back Performed
2015-09-30 Perforation Treatment Performed - Jet Perforation
2015-09-30 Well Log Performed
2015-10-01 Perforation Treatment Performed - Cement Plug
2015-10-01 Perforation Treatment Performed - Cement Squeeze
2015-10-01 Plug Back Performed
2016-01-13 Perforation Treatment Performed - Jet Perforation
2016-01-13 Well Log Performed
2016-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-14 Perforation Treatment Performed - Cement Squeeze
2016-01-14 Plug Back Performed
2016-02-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-12-01 Perforation 304.00 305.00 13
2015-09-22 Packing Device Capped w/Cement 236.00 245.50 0
2015-09-23 Perforation 218.50 219.50 17
2015-09-24 Packing Device Capped w/Cement 200.00 215.00 0
2015-09-24 Cement Squeeze 218.50 219.50 0
2015-09-28 Perforation 187.00 188.30 17
2015-09-29 Cement Squeeze 187.00 188.30 0
2015-09-29 Packing Device Capped w/Cement 180.00 184.00 0
2015-09-30 Perforation 165.50 166.80 17
2015-10-01 Cement Squeeze 165.50 166.80 0
2015-10-01 Cement Plug 145.00 184.00 0
1991-12-01 Perforation 320.00 322.00 13
2016-01-13 Perforation 135.50 137.50 17
2016-01-14 Cement Squeeze 135.50 137.50 0
2016-01-14 Packing Device Capped w/Cement 123.00 133.00 0
1991-12-01 Perforation 321.50 321.60 13
1995-01-21 Perforation 347.00 348.00 20
1995-01-21 Perforation 354.00 355.00 20
2015-09-17 Packing Device Capped w/Cement 333.00 341.00 0
2015-09-17 Packing Device Capped w/Cement 288.80 297.00 0
2015-09-21 Perforation 251.00 253.00 17
2015-09-22 Cement Squeeze 251.00 253.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 742 0.0 0.0 0.0
1993 7153 0.0 0.0 0.0
1994 1084 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References