X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614062802002

Well Details

Well ID: 0614062802002
Loading map...
Location: 00/02-28-061-06W4/2
Location Alias: 00/02-28-61-06 W4M
Location Alias 2: 00/02-28-061-06 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 06
Section: 28
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CPEC FORSYTH 2-28-61-6
Operator Name: Crescent Point Energy Corp.
License Number: 0158339
License Date: 1993-05-18
License Status: Suspension
Spud Date: 1993-05-31
Final Drill Date: 1993-06-02
Well Total Depth: 453.00 m
Surface Hole Latitude: 54.299928
Surface Hole Longitude: -110.839657

For data sources see[1][2]

Well History

Date Event
1993-05-18 Obtained License
1993-06-01 Surface Casing Operation Performed
1993-06-02 Finished Drilling
1993-06-02 Well Log Performed
1993-06-02 Well Mode changed to Drilled and Cased
1993-06-03 Drill Stem Test Performed
1993-06-03 Production Casing Operation Performed
1993-06-03 Rig Released
1993-06-18 Perforation Treatment Performed - Jet Perforation
1993-06-18 Well Log Performed
1997-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-14 Perforation Treatment Performed - Jet Perforation
1997-08-14 Plug Back Performed
1997-08-14 Well Log Performed
2001-02-24 Perforation Treatment Performed - Jet Perforation
2001-03-29 Well Began Production
2001-03-29 Well Fluid changed to Gas
2001-03-29 Well Mode changed to Flowing
2001-12-01 Well Fluid changed to Gas
2001-12-01 Well Mode changed to Suspended
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Flowing
2016-12-31 Well Fluid changed to Gas
2016-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-18 Perforation 337.00 337.70 13
2001-02-24 Perforation 243.00 245.50 13
2001-02-24 Perforation 271.00 272.00 13
2001-02-24 Perforation 274.00 275.00 13
2001-02-24 Perforation 277.00 278.00 13
2001-02-24 Perforation 312.00 313.00 13
2001-02-24 Perforation 315.50 316.50 13
1997-08-14 Packing Device Capped w/Cement 317.00 325.00 0
1997-08-14 Perforation 315.50 316.50 13
1997-08-14 Perforation 312.00 313.00 13
1997-08-14 Perforation 277.00 278.50 13
1997-08-14 Perforation 274.00 275.00 13
1997-08-14 Perforation 271.00 272.00 13
1997-08-14 Perforation 243.00 245.50 13
1997-08-14 Perforation 231.00 232.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5875 0.0 0.0 0.0
2002 5792 0.0 0.0 0.0
2003 8010 0.0 0.0 0.0
2004 6277 0.0 0.0 0.0
2005 8244 0.0 0.0 0.0
2006 8328 0.0 0.0 0.0
2007 6749 0.0 0.0 0.0
2008 3504 0.0 0.0 0.0
2009 2708 0.0 0.0 0.0
2010 6084 0.0 0.0 0.0
2011 4659 0.0 0.0 0.0
2012 5138 0.0 0.0 0.0
2013 4637 0.0 0.0 0.0
2014 5082 0.0 0.0 0.0
2015 5020 0.0 0.0 0.0

For data sources see[5]

References