X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614062802000

Well Details

Well ID: 0614062802000
Loading map...
Location: 00/02-28-061-06W4/0
Location Alias: 00/02-28-61-06 W4M
Location Alias 2: 00/02-28-061-06 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 06
Section: 28
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CPEC FORSYTH 2-28-61-6
Operator Name: Crescent Point Energy Corp.
License Number: 0158339
License Date: 1993-05-18
License Status: Suspension
Spud Date: 1993-05-31
Final Drill Date: 1993-06-02
Well Total Depth: 453.00 m
Surface Hole Latitude: 54.299928
Surface Hole Longitude: -110.839657

For data sources see[1][2]

Well History

Date Event
1993-05-18 Obtained License
1993-06-01 Surface Casing Operation Performed
1993-06-02 Finished Drilling
1993-06-02 Well Log Performed
1993-06-02 Well Mode changed to Drilled and Cased
1993-06-03 Drill Stem Test Performed
1993-06-03 Production Casing Operation Performed
1993-06-03 Rig Released
1993-06-18 Perforation Treatment Performed - Jet Perforation
1993-06-18 Well Log Performed
1994-11-16 Well Began Production
1994-11-16 Well Fluid changed to Gas
1994-11-16 Well Mode changed to Flowing
1994-12-01 Well Fluid changed to Gas
1994-12-01 Well Mode changed to Suspended
1997-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-14 Perforation Treatment Performed - Jet Perforation
1997-08-14 Plug Back Performed
1997-08-14 Well Fluid changed to Gas
1997-08-14 Well Log Performed
1997-08-14 Well Mode changed to Abandoned Zone
2001-02-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-18 Perforation 337.00 337.70 13
2001-02-24 Perforation 243.00 245.50 13
2001-02-24 Perforation 271.00 272.00 13
2001-02-24 Perforation 274.00 275.00 13
2001-02-24 Perforation 277.00 278.00 13
2001-02-24 Perforation 312.00 313.00 13
2001-02-24 Perforation 315.50 316.50 13
1997-08-14 Packing Device Capped w/Cement 317.00 325.00 0
1997-08-14 Perforation 315.50 316.50 13
1997-08-14 Perforation 312.00 313.00 13
1997-08-14 Perforation 277.00 278.50 13
1997-08-14 Perforation 274.00 275.00 13
1997-08-14 Perforation 271.00 272.00 13
1997-08-14 Perforation 243.00 245.50 13
1997-08-14 Perforation 231.00 232.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 693 0.0 0.0 0.0

For data sources see[5]

References