X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614050611C00

Well Details

Well ID: 0614050611C00
Loading map...
Location: C0/11-06-061-05W4/0
Location Alias: C0/11-06-61-05 W4M
Location Alias 2: C0/11-06-061-05 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 05
Section: 06
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CPEC BVILLE 11-6-61-5
Operator Name: Crescent Point Energy Corp.
License Number: 0007862
License Date: 1954-03-25
License Status: Abandoned
Spud Date: 1954-03-26
Final Drill Date: 1954-03-30
Well Total Depth: 365.80 m
Surface Hole Latitude: 54.248879
Surface Hole Longitude: -110.747326

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-03-25 Obtained License
1954-03-30 Finished Drilling
1954-03-30 Production Casing Operation Performed
1954-03-30 Well Mode changed to Drilled and Cased
1954-04-01 Perforation Treatment Performed - Bullet Perforation
1954-07-11 Well Began Production
1954-07-11 Well Fluid changed to Gas
1954-07-11 Well Mode changed to Pumping
1957-02-22 Well Fluid changed to Gas
1957-02-22 Well Mode changed to Suspended
1960-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-02-13 Perforation Treatment Performed - Jet Perforation
1960-09-30 Well Fluid changed to Gas
1960-09-30 Well Mode changed to Flowing
2002-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-16 Perforation Treatment Performed - Jet Perforation
2002-03-16 Plug Back Performed
2002-03-16 Well Fluid changed to Gas
2002-03-16 Well Mode changed to Abandoned Zone
2002-03-17 Perforation Treatment Performed - Jet Perforation
2002-03-18 Perforation Treatment Performed - Jet Perforation
2002-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-19 Plug Back Performed
2002-06-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-04-01 Bullet Perforation 332.20 335.30 7
1954-04-01 Bullet Perforation 350.50 352.00 7
1960-02-10 Packing Device Capped w/Cement 317.00 317.00 0
1960-02-13 Perforation 308.20 309.10 13
2002-03-16 Packing Device Capped w/Cement 289.00 304.00 0
2002-03-16 Perforation 220.00 220.90 99
2002-03-17 Perforation 218.00 218.90 99
2002-03-18 Perforation 210.00 211.00 14
2002-03-19 Packing Device Capped w/Cement 180.00 216.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 2808 0.0 0.0 0.0
1970 5232 0.0 0.0 0.0
1971 7295 0.0 0.0 0.0
1972 2712 0.0 0.0 0.0
1973 3696 0.0 0.0 0.0
1974 2978 0.0 0.0 0.0
1975 3480 0.0 0.0 0.0
1976 3063 0.0 0.0 0.0
1977 3287 0.0 0.0 0.0
1978 3159 0.0 0.0 0.0
1979 3850 0.0 0.0 0.0
1980 2640 0.0 0.0 0.0
1981 3576 0.0 0.0 0.0
1982 3072 0.0 0.0 0.0
1983 2472 0.0 0.0 0.0
1984 2958 0.0 0.0 0.0
1985 3028 0.0 0.0 0.0
1986 3286 0.0 0.0 0.0
1987 2705 0.0 0.0 0.0
1988 2232 0.0 0.0 0.0
1989 2832 0.0 0.0 0.0
1990 3114 0.0 0.0 0.0
1991 3732 0.0 0.0 0.0
1992 2554 0.0 0.0 0.0
1993 4800 0.0 0.0 0.0
1994 3729 0.0 0.0 0.0
1995 4030 0.0 0.0 0.0
1996 3918 0.0 0.0 0.0
1997 2798 0.0 0.0 0.0
1998 7717 0.0 0.0 0.0
1999 8520 0.0 0.0 0.0
2000 8363 0.0 0.0 0.0
2001 7734 0.0 0.0 0.0

For data sources see[5]

References