If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0614042509002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.307746,"lon":-110.457884,"icon":""}]} |
Location: 00/09-25-061-04W4/2 | |
Location Alias: 00/09-25-61-04 W4M | |
Location Alias 2: 00/09-25-061-04 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 4 | |
Range: 04 | |
Section: 25 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: BAYTEX 9D KENT 9-25-61-4 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0242181 | |
License Date: 2000-09-18 | |
License Status: Suspension | |
Spud Date: 2000-09-22 | |
Final Drill Date: 2000-09-23 | |
Well Total Depth: 374.00 m | |
Surface Hole Latitude: 54.307746 | |
Surface Hole Longitude: -110.457884 |
Date | Event |
---|---|
2000-09-18 | Obtained License |
2000-09-22 | Surface Casing Operation Performed |
2000-09-23 | Finished Drilling |
2000-09-23 | Well Log Performed |
2000-09-23 | Well Mode changed to Drilled and Cased |
2000-09-24 | Production Casing Operation Performed |
2000-09-24 | Rig Released |
2000-10-06 | Perforation Treatment Performed - Jet Perforation |
2005-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-20 | Plug Back Performed |
2005-10-21 | Perforation Treatment Performed - Jet Perforation |
2005-10-21 | Well Log Performed |
2005-10-22 | Well Began Production |
2005-10-22 | Well Fluid changed to Crude Bitumen |
2005-10-22 | Well Mode changed to Pumping |
2010-10-31 | Well Fluid changed to Crude Bitumen |
2010-10-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-10-06 | Perforation | 333.00 | 339.00 | 26 |
2005-10-20 | Packing Device Capped w/Cement | 339.70 | 367.00 | 0 |
2005-10-21 | Perforation | 315.00 | 319.00 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1656 | 0.0 | 0.0 | 0.0 |
2007 | 1536 | 0.0 | 0.0 | 0.0 |
2008 | 1126 | 0.0 | 0.0 | 0.0 |
For data sources see[5]