X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606082314000

Well Details

Well ID: 0606082314000
Loading map...
Location: 00/14-23-060-08W6/0
Location Alias: 00/14-23-60-08 W6M
Location Alias 2: 00/14-23-060-08 W6/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 08
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: MOBIL GULF SHELL COPTON 14-23-60-8
Operator Name: ExxonMobil Canada Ltd.
License Number: 0068988
License Date: 1978-03-27
License Status: Re-Entered
Spud Date: 1978-10-29
Final Drill Date: 1979-04-18
Well Total Depth: 5002.00 m
Surface Hole Latitude: 54.208740
Surface Hole Longitude: -119.087057

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-27 Obtained License
1978-12-11 Drill Stem Test Performed
1979-02-11 Drill Stem Test Performed
1979-02-14 Drill Stem Test Performed
1979-02-16 Drill Stem Test Performed
1979-04-18 Finished Drilling
1979-04-29 Liner Casing Operation Performed
1979-05-05 Perforation Treatment Performed - Jet Perforation
1979-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-08 Drill Stem Test Performed
1979-05-09 Drill Stem Test Performed
1979-05-11 Drill Stem Test Performed
1979-05-12 Drill Stem Test Performed
1979-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-13 Perforation Treatment Performed - Acid Wash - No Pressure
1979-05-13 Perforation Treatment Performed - Jet Perforation
1979-05-14 Drill Stem Test Performed
1979-05-16 Drill Stem Test Performed
1979-05-16 Perforation Treatment Performed - Jet Perforation
1979-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-19 Perforation Treatment Performed - Jet Perforation
1979-05-20 Drill Stem Test Performed
1979-05-21 Drill Stem Test Performed
1979-05-23 Perforation Treatment Performed - Jet Perforation
1979-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-05-26 Perforation Treatment Performed - Jet Perforation
1979-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-28 Drill Stem Test Performed
1979-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-30 Perforation Treatment Performed - Jet Perforation
1979-05-31 Drill Stem Test Performed
1979-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-06-01 Perforation Treatment Performed - Jet Perforation
1979-06-02 Drill Stem Test Performed
1979-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-06-06 Well Abandoned
1979-06-06 Well Mode changed to Abandoned
1979-12-13 Drill Stem Test Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-05 Perforation 4709.00 4749.00 6
1979-05-23 Perforation 4192.00 4212.00 6
1979-05-24 Acid Treatment 4192.00 4212.00 0
1979-05-26 Packing Device Capped w/Cement 4150.00 4150.00 0
1979-05-26 Perforation 3864.00 3872.00 6
1979-05-26 Perforation 3876.00 3883.00 6
1979-05-27 Acid Treatment 3864.00 3883.00 0
1979-05-29 Packing Device Capped w/Cement 3850.00 3850.00 0
1979-05-30 Perforation 3739.00 3750.00 6
1979-05-30 Acid Treatment 3739.00 3750.00 0
1979-06-01 Packing Device Capped w/Cement 3715.00 3715.00 0
1979-05-07 Acid Treatment 4709.00 4749.00 0
1979-06-01 Perforation 3233.00 3244.00 6
1979-06-02 Acid Treatment 3233.00 3244.00 0
1979-06-03 Packing Device Capped w/Cement 3225.00 3225.00 0
1979-05-13 Perforation 4669.00 4688.70 7
1979-05-13 Acid Wash 4669.00 4688.70 0
1979-05-13 Acid Treatment 4669.00 4688.70 0
1979-05-16 Perforation 4662.00 4695.00 6
1979-05-18 Packing Device Capped w/Cement 4658.00 4658.00 0
1979-05-19 Perforation 4553.00 4592.00 6
1979-05-19 Acid Treatment 4553.00 4592.00 0

For data sources see[4]



References