X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605210211003

Well Details

Well ID: 0605210211003
Loading map...
Location: 00/11-02-060-21W5/3
Location Alias: 00/11-02-60-21 W5M
Location Alias 2: 00/11-02-060-21 W5/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 21
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT FIR 11-2-60-21
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0055695
License Date: 1975-11-04
License Status: Suspension
Spud Date: 1975-11-18
Final Drill Date: 1998-07-19
Well Total Depth: 3328.00 m
Surface Hole Latitude: 54.162451
Surface Hole Longitude: -117.041077

For data sources see[1][2]

Well History

Date Event
1975-11-04 Obtained License
1976-03-01 Perforation Treatment Performed - Jet Perforation
1976-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-02 Perforation Treatment Performed - Jet Perforation
1976-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-31 Perforation Treatment Performed - Cement Squeeze
1998-07-17 Direction Drilling Operation Performed - Deviate
1998-07-19 Finished Drilling
1998-07-19 Well Mode changed to Drilled and Cased
1998-07-20 Well Log Performed
1998-07-21 Liner Casing Operation Performed
1998-07-21 Perforation Treatment Performed - Open-Hole Completion
1998-07-21 Perforation Treatment Performed - Slotted Liner or Casing
1998-07-22 Well Log Performed
1998-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-30 Rig Released
1998-08-12 Perforation Treatment Performed - Jet Perforation
1998-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-02 Well Began Production
1998-09-02 Well Fluid changed to Gas
1998-09-02 Well Mode changed to Flowing
1999-09-03 Well Log Performed
1999-09-05 Perforation Treatment Performed - Casing Patch (Over Perfs)
1999-09-05 Well Log Performed
2006-06-12 Well Log Performed
2008-07-15 Well Log Performed
2009-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-10 Plug Back Performed
2009-08-10 Well Fluid changed to Gas
2009-08-10 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-07-17 3186.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-01 Perforation 2544.50 2548.40 7
1998-08-12 Perforation 3319.00 3325.00 14
1998-08-14 Acid Treatment 3316.90 3328.00 0
1999-09-05 Casing Patch 2544.50 2556.70 0
2009-08-10 Packing Device Capped w/Cement 3126.00 3134.00 0
2009-08-10 Packing Device Capped w/Cement 2530.00 2538.00 0
1976-03-02 Acid Treatment 2544.50 2548.40 0
1976-03-02 Perforation 2549.30 2553.60 7
1976-03-02 Perforation 2554.80 2556.70 7
1976-03-04 Acid Treatment 2544.50 2556.70 0
1982-03-31 Cement Squeeze 2544.50 2556.70 0
1998-07-21 Slotted Liner 3316.90 3320.80 0
1998-07-21 Open Hole/Barefoot Completion 3320.80 3328.00 0
1998-07-28 Acid Treatment 3316.90 3328.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1762 0.0 0.0 0.0
1999 6812 0.0 0.0 0.0
2000 7882 0.0 0.0 0.0
2001 4471 0.0 0.0 0.0
2002 8008 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 4821 0.0 0.0 0.0
2005 6045 0.0 0.0 0.0
2006 7074 0.0 0.0 0.0
2007 8423 0.0 0.0 0.0
2008 7319 0.0 0.0 0.0
2009 5831 0.0 0.0 0.0

For data sources see[6]

References