X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605202804000

Well Details

Well ID: 0605202804000
Loading map...
Location: 00/04-28-060-20W5/0
Location Alias: 00/04-28-60-20 W5M
Location Alias 2: 00/04-28-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL ET AL HZ KAYBOBS 4-28-60-20
Operator Name: Paramount Resources Ltd.
License Number: 0438566
License Date: 2011-11-04
License Status: Issued
Spud Date: 2011-12-19
Final Drill Date: 2012-01-11
Well Total Depth: 3655.00 m
Surface Hole Latitude: 54.213987
Surface Hole Longitude: -116.920784

For data sources see[1][2]

Well History

Date Event
2011-11-04 Obtained License
2011-12-21 Surface Casing Operation Performed
2011-12-27 Well Log Performed
2011-12-30 Direction Drilling Operation Performed - Deviate
2012-01-02 Direction Drilling Operation Performed - Horizontal
2012-01-03 Well Log Performed
2012-01-04 Intermediate Casing Operation Performed
2012-01-06 Well Log Performed
2012-01-11 Finished Drilling
2012-01-11 Well Log Performed
2012-01-11 Well Mode changed to Drilled and Cased
2012-01-14 Liner Casing Operation Performed
2012-01-14 Perforation Treatment Performed - Open-Hole Completion
2012-01-16 Rig Released
2012-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-27 Well Fluid changed to Gas
2012-01-27 Well Mode changed to Testing
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Test Completed
2012-02-02 Well Began Production
2012-02-02 Well Fluid changed to Gas
2012-02-02 Well Mode changed to Flowing
2012-07-12 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-30 1738.00 Deviate (5 - 79 degrees)
2012-01-02 2441.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-14 Open Hole/Barefoot Completion 3651.00 3655.00 0
2012-01-27 Multi-Stage Fracture 2792.20 2792.30 0
2012-01-27 Multi-Stage Fracture 2912.00 2912.10 0
2012-01-27 Multi-Stage Fracture 3031.40 3031.50 0
2012-01-26 Multi-Stage Fracture 3139.80 3139.90 0
2012-01-26 Multi-Stage Fracture 3247.80 3247.90 0
2012-01-26 Multi-Stage Fracture 3344.40 3344.50 0
2012-01-26 Multi-Stage Fracture 3452.60 3452.70 0
2012-01-26 Multi-Stage Fracture 3560.80 3560.90 0
2012-01-26 Multi-Stage Fracture 3641.70 3641.80 0
2012-01-27 Multi-Stage Fracture 2599.30 2599.40 0
2012-01-27 Multi-Stage Fracture 2684.20 2684.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5452 0.0 0.0 0.0
2013 7165 0.0 0.0 0.0
2014 7774 0.0 0.0 0.0
2015 7061 0.0 0.0 0.0
2016 7091 0.0 0.0 0.0
2017 8328 0.0 0.0 0.0
2018 6272 0.0 0.0 0.0
2019 5182 0.0 0.0 0.0
2020 1134 0.0 0.0 0.0

For data sources see[6]

References