X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201216000

Well Details

Well ID: 0605201216000
Loading map...
Location: 00/16-12-060-20W5/0
Location Alias: 00/16-12-60-20 W5M
Location Alias 2: 00/16-12-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 16-12-60-20
Operator Name: Paramount Resources Ltd.
License Number: 0439982
License Date: 2011-11-30
License Status: Issued
Spud Date: 2012-01-04
Final Drill Date: 2012-01-25
Well Total Depth: 4025.80 m
Surface Hole Latitude: 54.165621
Surface Hole Longitude: -116.849892

For data sources see[1][2]

Well History

Date Event
2011-11-30 Obtained License
2012-01-07 Surface Casing Operation Performed
2012-01-11 Direction Drilling Operation Performed - Horizontal
2012-01-11 Well Log Performed
2012-01-18 Intermediate Casing Operation Performed
2012-01-25 Finished Drilling
2012-01-25 Well Log Performed
2012-01-25 Well Mode changed to Drilled and Cased
2012-01-27 Liner Casing Operation Performed
2012-01-28 Rig Released
2012-02-01 Well Log Performed
2012-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-04 Perforation Treatment Performed - Open-Hole Completion
2012-02-09 Well Log Performed
2012-03-21 Well Began Production
2012-03-21 Well Fluid changed to Gas
2012-03-21 Well Mode changed to Flowing
2017-07-15 Well Fluid changed to Gas
2017-07-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-04 Precision Drilling Technology Services Group Inc. 252E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-11 2079.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-04 Open Hole/Barefoot Completion 4021.00 4025.80 0
2012-02-04 Multi-Stage Fracture 3207.30 3309.90 0
2012-02-04 Multi-Stage Fracture 3103.20 3207.20 0
2012-02-04 Multi-Stage Fracture 3015.70 3103.10 0
2012-02-04 Multi-Stage Fracture 2942.60 3015.60 0
2012-02-04 Multi-Stage Fracture 2855.00 2942.50 0
2012-02-04 Multi-Stage Fracture 2769.20 2854.90 0
2012-02-04 Multi-Stage Fracture 2665.00 2769.10 0
2012-02-04 Multi-Stage Fracture 2562.50 2664.90 0
2012-02-04 Multi-Stage Fracture 2502.30 2562.40 0
2012-02-04 Multi-Stage Fracture 4000.20 4025.80 0
2012-02-04 Multi-Stage Fracture 3923.70 4000.10 0
2012-02-04 Multi-Stage Fracture 3825.30 3923.60 0
2012-02-04 Multi-Stage Fracture 3726.70 3825.20 0
2012-02-04 Multi-Stage Fracture 3628.30 3726.60 0
2012-02-04 Multi-Stage Fracture 3518.50 3628.20 0
2012-02-04 Multi-Stage Fracture 3408.60 3518.40 0
2012-02-04 Multi-Stage Fracture 3310.00 3408.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6312 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8327 0.0 0.0 0.0
2015 4367 0.0 0.0 0.0
2016 6887 0.0 0.0 0.0
2017 5592 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 8423 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References