If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605201216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.165621,"lon":-116.849892,"icon":""}]} |
Location: 00/16-12-060-20W5/0 | |
Location Alias: 00/16-12-60-20 W5M | |
Location Alias 2: 00/16-12-060-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 20 | |
Section: 12 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY HZ KAYBOBS 16-12-60-20 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0439982 | |
License Date: 2011-11-30 | |
License Status: Issued | |
Spud Date: 2012-01-04 | |
Final Drill Date: 2012-01-25 | |
Well Total Depth: 4025.80 m | |
Surface Hole Latitude: 54.165621 | |
Surface Hole Longitude: -116.849892 |
Date | Event |
---|---|
2011-11-30 | Obtained License |
2012-01-07 | Surface Casing Operation Performed |
2012-01-11 | Direction Drilling Operation Performed - Horizontal |
2012-01-11 | Well Log Performed |
2012-01-18 | Intermediate Casing Operation Performed |
2012-01-25 | Finished Drilling |
2012-01-25 | Well Log Performed |
2012-01-25 | Well Mode changed to Drilled and Cased |
2012-01-27 | Liner Casing Operation Performed |
2012-01-28 | Rig Released |
2012-02-01 | Well Log Performed |
2012-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-04 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-09 | Well Log Performed |
2012-03-21 | Well Began Production |
2012-03-21 | Well Fluid changed to Gas |
2012-03-21 | Well Mode changed to Flowing |
2017-07-15 | Well Fluid changed to Gas |
2017-07-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-04 | Precision Drilling Technology Services Group Inc. | 252E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-11 | 2079.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-04 | Open Hole/Barefoot Completion | 4021.00 | 4025.80 | 0 |
2012-02-04 | Multi-Stage Fracture | 3207.30 | 3309.90 | 0 |
2012-02-04 | Multi-Stage Fracture | 3103.20 | 3207.20 | 0 |
2012-02-04 | Multi-Stage Fracture | 3015.70 | 3103.10 | 0 |
2012-02-04 | Multi-Stage Fracture | 2942.60 | 3015.60 | 0 |
2012-02-04 | Multi-Stage Fracture | 2855.00 | 2942.50 | 0 |
2012-02-04 | Multi-Stage Fracture | 2769.20 | 2854.90 | 0 |
2012-02-04 | Multi-Stage Fracture | 2665.00 | 2769.10 | 0 |
2012-02-04 | Multi-Stage Fracture | 2562.50 | 2664.90 | 0 |
2012-02-04 | Multi-Stage Fracture | 2502.30 | 2562.40 | 0 |
2012-02-04 | Multi-Stage Fracture | 4000.20 | 4025.80 | 0 |
2012-02-04 | Multi-Stage Fracture | 3923.70 | 4000.10 | 0 |
2012-02-04 | Multi-Stage Fracture | 3825.30 | 3923.60 | 0 |
2012-02-04 | Multi-Stage Fracture | 3726.70 | 3825.20 | 0 |
2012-02-04 | Multi-Stage Fracture | 3628.30 | 3726.60 | 0 |
2012-02-04 | Multi-Stage Fracture | 3518.50 | 3628.20 | 0 |
2012-02-04 | Multi-Stage Fracture | 3408.60 | 3518.40 | 0 |
2012-02-04 | Multi-Stage Fracture | 3310.00 | 3408.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6312 | 0.0 | 0.0 | 0.0 |
2013 | 8711 | 0.0 | 0.0 | 0.0 |
2014 | 8327 | 0.0 | 0.0 | 0.0 |
2015 | 4367 | 0.0 | 0.0 | 0.0 |
2016 | 6887 | 0.0 | 0.0 | 0.0 |
2017 | 5592 | 0.0 | 0.0 | 0.0 |
2018 | 8447 | 0.0 | 0.0 | 0.0 |
2019 | 8423 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]